Hydro-Smart HSPS190MTH Integrator and Zone Panels Instruction Manual
- June 17, 2024
- Hydro-Smart
Table of Contents
Hydro-Smart HSPS190MTH Integrator and Zone Panels
Product Specifications
- Product Name: Hydro Smart Integrator and Zone Panels
- Manufacturer: Hydro Smart
- Website: www.hydro-smart.com
- Tech Support: 763-331-3066
- Email: info@hydro-smart.com
Product Overview
The Hydro Smart Integrator and Zone Panels provide a comprehensive solution for zoning by pumps/valves. The system includes various components such as entry fill, exit fill, purge tee, air eliminators, flow rate meters, and manifold for efficient operation.
Before Filling Instructions:
- Connect hoses to the system as per the diagram provided.
- Ensure the purge tee is in the vertical position.
- Close the air eliminator by turning the air stem cap clockwise.
- Verify that all flow meters are fully open and loops are closed on the manifold.
- Ensure air eliminator valves are closed and return/supply shutoff ball valves are in the open position.
Filling, Purging, and Pressurizing Instructions:
Filling the System:
- Open the first loop and turn on the transfer pump to fill the system with fluids.
- Observe air bubbles dissipating in the bucket for air removal.
- Close each loop after purging air until all loops are purged.
Purging:
- Close off the fill exit point valve to allow pressure to rise.
- When the supply pressure gauge shows 16-22 PSI, close off the fill entry point.
Frequently Asked Questions
Q: What should I do if the unit is damaged?
A: If the unit is damaged, do not return it to the store. Please call Hydro Smart at 763-331-3066 for troubleshooting, returns, or replacement parts.
Q: How much tubing will I need for the system?
A: Approximately 1 gallon of fluids is needed for every 100 feet of 1/2-inch tubing.
WARNING AND STEPS
WARNING
Do not plug in the control cord until all fluids are introduced and thermostat connection(s) are finished
DAMAGES – If the unit is damaged, do not return to the store. Please call 763-331-3066 for troubleshooting, returns, or replacement parts.
- STEP 1 – Mount Integrator Panel onto wall with four 1/4” x 1 – 1/2” Lg wood screws. Utilize the slots on the top and bottom of the integrator panel and zone panel (When zoning by Pumps/Valves)
- STEP 2 – Install Supply and Return lines to and from panel to boiler. Use Type L Copper or Oxygen Barrier PEX tubing.
- STEP 3 – Install Supply and Return lines to and from panel to emitters (Manifold(s)) . Connect the integrator panel to zone panel (When zoning by Pumps/Valves) Use Type L Copper or Oxygen Barrier PEX tubing.
- STEP 4 – Introduce fluids into the system and purge air out of the system.
- STEP 5 – Install low voltage thermostat (HSRadThermostat Model or compatible thermostat)
- STEP 6 – Plug in the cord and activate the thermostat. Acknowledge the following:
- A. Both circulator pumps running.
- B. Boiler energized and provided heat.
- C. Observe gauges for the performance of the system (Pressure & Temperature).
OVERVIEW AND SUPPLIES
WHAT YOU’LL NEED:
- 1/2 HP Transfer Pump
- 5 or 10 Gal. Bucket
- 3 – (6ft) Washing Machine Hoses
- System Fluids (Distilled Water/Propylene Glycol)*
NOTE: 100 feet of 1/2” tubing will require approx. 1 gallon of fluids
SYSTEM OVERVIEW
PANEL/SYSTEM
- A ENTRY FILL
- B EXIT FILL
- C PURGE TEE
- D AIR ELIMINATOR
MANIFOLD
- E RETURN SHUTOFF BALL VALVE
- F SUPPLY SHUTOFF BALL VALVE
- G LOOP VALVES
- H FLOW RATE METERS
- I RETURN AIR ELIMINATOR
- J SUPPLY AIR ELIMINATOR
SYSTEM EXTRAS
- K 1/2 HP TRANSFER PUMP
- L WASHING MACHINE HOSES (3 – 6FT)
- M SYSTEM FLUIDS (DISTILLED WATER/ PROPYLENE GYCOL)
PANEL DETAILS
MANIFOLD
BEFORE FILLING
BEFORE FILLING THE SYSTEM
ON THE SYSTEM
-
Connect Hoses to the System
- Attach Hose 1 to the OUT on the TRANSFER PUMP and connect to ENTRY FILL (A)
- Attach Hose 2 to the IN on the TRANSFER PUMP and run into the bucket
- Attach Hose 3 to the EXIT FILL (B) and run into the bucket
- Fill 5 gallon bucket with Distilled Water/Propylene Glycol
-
Make sure the PURGE TEE (C) is in the vertical position
-
Close AIR ELIMINATOR (D) by turning air stem cap clockwise
ON THE MANIFOLD -
Verify all FLOW METERS (RED/H) are fully OPEN (Pry locking ring up and turn CCW until fully open then push down locking ring to lock into position)
-
Verfiy all LOOPS (BLUE/G) are CLOSED on the manifold by turning CW
-
Verify AIR ELIMINATOR VALVES (I & J) are CLOSED (CW)
-
Verify RETURN AND SUPPLY SHUTOFF BALL VALVES (E & F) are in the OPEN position
FILLING – PURGING – PRESSURIZING
FILLING THE SYSTEM
PURGING
-
OPEN the FIRST LOOP* by turning Counter Clockwise (CCW) and turn on TRANSFER PUMP
NOTE: Each loop will take approx. 2-3 minutes to purge -
Observe air bubbles in the bucket dissipating for removal of air.
-
When air is purged out, CLOSE LOOP by turning Clockwise (CW)
- Repeat steps 1 – 3 with each remaining loop until all loops have been purged
PRESSURIZING
- Repeat steps 1 – 3 with each remaining loop until all loops have been purged
-
With the TRANSFER PUMP still running, CLOSE off FILL EXIT POINT (B) valve and the pressure will rise.
-
When supply pressure gauge shows 16-22 PSI, CLOSE OFF FILL ENTRY POINT (A)
-
Turn off the TRANSFER PUMP and remove hoses
YOUR SYSTEM IS NOW PURGED AND PRESSURIZED
BEFORE BOILER OPERATION
- Rotate PURGE TEE (C) to horizontal position
- Rotate AIR ELIMINATOR (E) stem cap screw counter-clockwise 1 turn
TECH SUPPORT: 763-331-3066 EMAIL:
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>