HUAWEI SUN2000 Inverter High Current Version User Guide
- June 17, 2024
- Huawei
Table of Contents
HUAWEI SUN2000 Inverter High Current Version
Product Information
Specifications
- Model: SUN2000 12K/15K/17K/20K/25K-MB0 15K/17K/20K/25K-MB0-ZH
- Part Number: 31500JBP
- Version: 02
Before Use
Before installing the equipment, read the user manual carefully to get familiar with product information and safety precautions. The product warranty does not cover equipment damage caused by failure to follow the storage, transportation, installation, and usage guidelines specified in this document and the user manual. Scan the QR code on the equipment to view the user manual and safety precautions. The information in this document is subject to change without notice. Every effort has been made in the preparation of this document to ensure accuracy of the contents, but all statements, information, and recommendations in this document do not constitute a warranty of any kind, express or implied.
Product Usage Instructions
Installation Requirements
Ensure you meet all the necessary installation requirements before proceeding further.
Installing the Device
Preparing a PE Cable
Follow the guidelines to prepare the PE cable for installation.
Preparing DC Cables
Use the Staubli MC4 positive and negative metal terminals and DC connectors supplied with the inverter for preparing DC cables.
Preparing an AC Cable
Install a three-phase AC circuit breaker with the recommended specifications for the AC cable. Ensure the voltage and current ratings are appropriate .
Preparing Signal Cables
Prepare the signal cables as per the provided instructions to ensure proper functioning.
Shielding Ground
Apply paint or other protection measures to ensure proper grounding and safety .
Power-On and Commissioning
Follow the provided QR code for commissioning instructions and other operations to properly set up and start using the product.
Scan the QR code for commissioning instructions and other operations.
Huawei Digital Power Technologies Co., Ltd.
Huawei Digital Power Antuoshan Headquarters
Futian Shenzhen 518043
People’s Republic of China
digitalpower.huawei.com
FAQ
Q: Where can I find detailed commissioning instructions?
A: Scan the QR code provided in the manual for commissioning instructions.
Q: What kind of cables should be used for DC connections?
A: Use Staubli MC4 positive and negative metal terminals and DC connectors supplied with the inverter.
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>