YIYIBYUS HG-MLYP-5859 Wood Shoe Storage Cabinet Instructions
- June 4, 2024
- YIYIBYUS
Table of Contents
YIYIBYUS HG-MLYP-5859 Wood Shoe Storage Cabinet
Accessories details: (unit CM
INSTALLATION
- Take out the No. 6 panel and the plastic part of the left side of No. 12 tipping bucket, and fix the No. 12 tipping bucket plastic part to the No. 6 panel with small tapping Scrrews.
- Take out the plastic part of the No. 13 right dump, and fix the plastic part of the No. 11 dump to the No. 6 panel with small tapping screws
- Take out the No. 7 bottom plate, use small tapping screws on both sides to fix the No. 7 plate on the plastic part of the dumper.
- Take out the No. 8 back layer board, use small tapping screws on both sides to fix the No. 8 board on the plastic part of the dumper.
- Take out the No. 9 middle layer board, use small tapping screws on both sides to fix the No. 9 board on the plastic part of the dumper.
- Tighten the fixed handle with the handle screw to the No. 6 panel, and install the remaining two shoe drawer in the same way.
- Take out the two side plates and screw the eccentric screw into the corresponding hole in the red circle.
- Take out the No. 2 right side board and the No. 1 desktop board, and screw in the 4CM pointed screws from the corresponding holes on the outside of the No. 2 right board to fix the No. 1 desktop board.
- Take out the No. 4 skirting board and the No. 5 rear pull plate, and screw in the 4CM pointed screw from the corresponding hole on the outside of the No. 2 right side plate to fix the No. 4 and No. 5 board.
- Take out the No. 3 left side plate, and screw in the 4CM pointed screw from the corres ponding hole on the outside of the No. 3 left side plate to tighten it.
- For better installation, lift the cabinet carefully.
- Put the small tapping screws into the white plastic kit and prepare for the next installation
- As shown in the Tigure, take out the shoe drawer that has just been installed, and then adjust the position of the shoe drawer. The middle hole of the plastic part of the drawer is aligned with the holes of the two vertical plates, and the plastic kit and small tapping screws are inserted up and down to tighten and fix. A shoehorn is installed as shown in the figure below
- Use the same installation method tO install the remaining two shoe drawer.
- Now you can see the other side of the installed cabinet and prepare for the next installation
- Take out the No. 10 upper pull plate, use 4CM pointed screws on both sides to tighten and fix it to the two side plates.
- Use the same method to install the remaining two No. 11 pull plates.
- Carefully straighten the cabinet after installation.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>