CISCO NCS 2000 Series Upgrade Add and Remove Cards and Nodes User Guide
- June 15, 2024
- Cisco
Table of Contents
NCS 2000 Series Upgrade Add and Remove Cards and Nodes
Product Information
Specifications
-
Product Name: Cisco ONS 15454 DWDM and Cisco NCS 2000
Series -
First Published: 2012-09-03
-
Last Modified: 2016-11-22
-
Text Part Number: OL-25031-02
Product Usage Instructions
Add and Remove Cards and Nodes
This document provides procedures for adding and removing dense
wavelength division multiplexing (DWDM) cards and nodes for the
Cisco ONS 15454 DWDM and Cisco NCS 2000 Series.
Note:
The procedures and tasks described in this document for the NCS
platform are applicable to the Cisco NCS 2002 and Cisco NCS 2006
platforms, unless noted otherwise.
Upgrade Cards and Nodes
This document also includes procedures for upgrading cards and
nodes for the Cisco ONS 15454 DWDM and Cisco NCS 2000 Series.
Revision History
-
November 2016: Updated for R10.6.1.
-
January 2016: Updated for R10.5.2.
-
December 2013: Revised the part number and included Release
10.0 features. -
July 2013: Added the section Limitations of USB Synchronization
with TNC or TSC Cards. -
August 2011: Added the section NTP-G261 Modify ANS Parameters
in a Node when Ports are in IS State. -
March 2012: Updated the section, NTP-G129 Add a DWDM Node.
-
July 2012: Updated the section NTP-G130 Remove a DWDM
Node.
Limitations of USB Synchronization with TNC or TSC Cards
- January 2016: Updated for R10.5.2. This is the first release of
this publication.
USB synchronization with TNC or TSC cards fails when the USB has
the 9.8 package in either its active or protect volume and when the
TNC or TSC card is inserted as a standalone card in the
chassis.
Scenario 1:
The USB has the 9.8 package in its active volume and any other
package in its protect volume. The TNC or TSC card, having a
package earlier than version 9.8, is loaded on the Cisco ONS 15454
M2 or Cisco ONS 15454 M6 chassis as a standalone card. The USB acts
as the master and pushes the 9.8 package from its active volume on
the TNC or TSC card. Despite several attempts, the package copy
operation fails.
Workarounds:
NTP-G107 Remove Permanently or Remove and Replace DWDM Cards
Purpose: This procedure permanently removes or removes and
replaces DWDM cards installed in the ONS 15454 and NCS shelf and
rack.
Tools/Equipment: None
Prerequisite: NTP-G30 Install the DWDM Cards and NTP-G179
Install the TXP, MXP, GE_XP, 10GE_XP, GE_XPE, 10GE_XPE, ADM-10G,
and OTU2_XP Cards task in the chapter Turn Up a Node of the Cisco
ONS 15454 DWDM Network Configuration Guide or Cisco NCS 2002 and
NCS 2006 Network Configuration Guide.
FAQ
Q: What is the compatibility of the procedures in this document
with the NCS platform?
A: The procedures and tasks described in this document for the
NCS platform are applicable to the Cisco NCS 2002 and Cisco NCS
2006 platforms, unless noted otherwise.
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco
NCS 2000 Series
First Published: 2012-09-03 Last Modified: 2016-11-22
Americas Headquarters
Cisco Systems, Inc. 170 West Tasman Drive San Jose, CA 95134-1706 USA
http://www.cisco.com Tel: 408 526-4000
800 553-NETS (6387) Fax: 408 527-0883
Text Part Number: OL-25031-02
1 C H A P T E R
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco
NCS 2000 Series
Note The terms “Unidirectional Path Switched Ring” and “UPSR” may appear in
Cisco literature. These terms do not refer to using Cisco ONS 15xxx NCS
products in a unidirectional path switched ring configuration. Rather, these
terms, as well as “Path Protected Mesh Network” and “PPMN,” refer generally to
Cisco’s path protection feature, which may be used in any topological network
configuration. Cisco does not recommend using its path protection feature in
any particular topological network configuration.
This document provides procedures for adding and removing dense wavelength
division multiplexing (DWDM) cards and nodes.
Note With references provided to configuration guides, see: · For software
releases 9.3 to 9.8, the Cisco ONS 15454 DWDM Configuration Guide · For
software release 10.0 and later, an appropriate guide from one of these three:
· Cisco ONS 15454 DWDM Control Card Configuration Guide or Cisco NCS 2000
Series Control Card Configuration Guide · Cisco ONS 15454 DWDM Line Card
Configuration Guide or Cisco NCS 2000 Series Line Card Configuration Guide ·
Cisco ONS 15454 DWDM Network Configuration Guide or Cisco NCS 2000 Series
Network Configuration Guide
Note The procedures and tasks described in this document for the NCS platform
is applicable to the Cisco NCS 2002 and Cisco NCS 2006 platforms, unless noted
otherwise.
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 1
Revision History
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series
Note Unless otherwise specified, “ONS 15454” refers to both ANSI and ETSI
shelf assemblies.
Topics include:
· Revision History, on page 2 · Limitations of USB Synchronization with TNC or
TSC Cards, on page 3 · NTP-G107 Remove Permanently or Remove and Replace DWDM
Cards, on page 3 · NTP-G129 Add a DWDM Node, on page 8 · NTP-G130 Remove a
DWDM Node, on page 10 · NTP-G261 Modify ANS Parameters in a Node when Ports
are in IS State , on page 12 · NTP-G146 Add a Rack, Passive Shelf, Passive
Unit, or Shelf to a Multishelf Node, on page 13 · NTP-G147 Delete a Passive
Unit, Passive Shelf, Shelf, or Rack from a Multishelf Node, on page 17 ·
NTP-G173 Convert an OADM Node to a ROADM Node, on page 19 · NTP-G176 Convert
an Line Amplifier Node to an OADM Node, on page 23 · NTP-G182 Convert a Line
Amplifier Node to a ROADM Node, on page 25 · NTP-G195 Convert a Protected
ROADM Node from two Separate Nodes to a Single Multishelf Node,
on page 27 · NTP-G242 Modify the CD setting of TDC-CC and TDC-FC Cards, on
page 37 · Additional References, on page 40 · Communications, Services, and
Additional Information, on page 41
Revision History
Date November 2016 January 2016 December 2013
July 2013
August 2011
March 2012
July 2012
Date November 2016
Notes
Updated for R10.6.1.
Updated for R10.5.2.
Revised the part number and included Release 10.0 features.
Added the section “Limitations of USB Synchronization with TNC or TSC Cards”.
Added the section “NTP-G261 Modify ANS Parameters in a Node when Ports are in
IS State”.
Updated the section, “NTP-G129 Add a DWDM Node”.
Updated the section “NTP-G130 Remove a DWDM Node”.
Notes
Updated for R10.6.1.
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 2
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series Limitations of USB Synchronization with TNC or TSC Cards
Date January 2016 December 2013
Notes Updated for R10.5.2. This is the first release of this publication.
Limitations of USB Synchronization with TNC or TSC Cards
USB synchronization with TNC or TSC cards fails when the USB has the 9.8
package in either its active or protect volume and when the TNC or TSC card is
inserted as a standalone card in the chassis.
Scenario 1: The USB has the 9.8 package in its active volume and any other
package in its protect volume The TNC or TSC card having a package earlier
than version 9.8, is loaded on the Cisco ONS 15454 M2 or Cisco ONS 15454 M6
chassis as a standalone card. The USB acts as the master and pushes the 9.8
package from its active volume on the TNC or TSC card. Despite several
attempts, the package copy operation fails.
Scenario 2: The USB has any package earlier than version 9.8 in its active
volume and the 9.8 package in its protect volume. The TNC or TSC card having a
package earlier than version 9.8, is loaded on the ONS 15454 M2 or ONS 15454
M6 chassis as a standalone card. The USB acts as the master and pushes the
package from its active volume on the TNC or TSC card. The card copies the
package and resets. When the card boots up after reset, the USB pushes the 9.8
package from its protect volume on the TNC or TSC card. Despite several
attempts, the package copy operation fails.
Workarounds:
· For release 9.3 and later releases, use TNC-E or TSC-E cards.
· For scenario 1, ensure that the TNC or TSC card has version 9.8 as the
active package.
· For scenario 2, ensure that the protect and the active volumes of USB are
the same.
NTP-G107 Remove Permanently or Remove and Replace DWDM Cards
Purpose Tools/Equipment Prerequisite Procedures
Required/As Needed
This procedure permanently removes or removes and replaces DWDM cards
installed in the ONS 15454 and NCS shelf and rack.
None
“NTP-G30 Install the DWDM Cards” and “NTP-G179 Install the TXP, MXP, GE_XP,
10GE_XP, GE_XPE, 10GE_XPE, ADM-10G, and OTU2_XP Cards” task in the chapter
“Turn Up a Node” of the Cisco ONS 15454 DWDM Network Configuration Guide or
Cisco NCS 2002 and NCS 2006 Network Configuration Guide
As needed
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 3
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series NTP-G107 Remove Permanently or Remove and Replace DWDM Cards
Onsite/Remote Security Level
Onsite Provisioning or higher
Caution Removing and replacing cards can be traffic affecting.
Caution Do not use this procedure to replace control cards. Procedure
Step 1
Step 2
Step 3 Step 4 Step 5
Complete the “DLP-G46 Log into CTC” task in the “Connect the PC and Log into the GUI” document.
Note
If you cannot log into Cisco Transport Controller (CTC) and you need to remove a card, remove
the card as described in Step 6, on page 5. After you log into CTC, troubleshoot the mismatched
equipment alarm (MEA) with the Cisco ONS 15454 DWDM Troubleshooting Guide or Cisco
NCS 2002 and NCS 2006 Troubleshooting Guide.
Click the Alarms tab.
a) Verify that the alarm filter is not on. See the “DLP-G128 Disable Alarm
Filtering” task in the Alarm and TCA Monitoring and Management document as
necessary.
b) Verify that no unexplained alarms appear on the network. If alarms appear,
investigate and resolve them before continuing. Refer to the Cisco ONS 15454
DWDM Troubleshooting Guide or Cisco NCS 2002 and NCS 2006 Troubleshooting
Guide for procedures.
If you are removing and replacing a card, go to Step 5, on page 4.
If you are permanently removing a card, go to Step 11, on page 5.
To remove and replace a card, complete the following tasks, as needed:
· The circuits traversing through the card that needs to be replaced (for
example, an amplifier) need to be protection switched. For instance, if the
card you want to replace is an active transponder (TXP) or muxponder (MXP) in
a Y-cable protection group, complete the “DLP-G179 Apply a Force Y-Cable or
Splitter Protection Switch” task in the Manage the Node document to force
traffic away from the TXP or MXP that you will remove. If the card you want to
replace is the standby TXP or MXP in a Y-cable protection group, complete the
“DLP-G182 Apply a Lockout” task in the Manage the Node document to prevent
traffic from switching to the TXP or MXP that you will remove. See the Cisco
ONS 15454 Procedure Guide or the Cisco ONS 15454 SDH Procedure Guide for other
types of protection switching (path protection, BLSR, optical, and
electrical).
· If the card is a node timing reference, complete the “NTP-G112 Change the
Node Timing Reference” task in the chapter “Maintain the Node” of the Cisco
ONS 15454 DWDM Network Configuration Guide or Cisco NCS 2002 and NCS 2006
Network Configuration Guide to change the timing reference to a card that will
not be removed.
· If the card is an OSCM or OSC-CSM with an optical service channel (OSC) or
TXP, MXP, GE_XP, 10GE_XP, GE_XPE, 10GE_XPE, ADM-10G, and OTU2_XP cards with
generic communications channel (GCC) termination, complete the “NTP-G85 Modify
or Delete OSC Terminations, GCC Terminations,
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 4
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series NTP-G107 Remove Permanently or Remove and Replace DWDM Cards
Step 6 Step 7 Step 8 Step 9
Step 10 Step 11
and Provisionable Patchcords” procedure in the Manage the Node document to
delete the termination and recreate it on a card that will not be removed.
Physically remove the card: a) Disconnect any cables. b) Open the card
latches/ejectors. c) Use the latches/ejectors to pull the card forward and
away from the shelf.
Insert the new card using one of the following procedures as applicable:
· “NTP-G30 Install the DWDM Cards” task in the chapter “Turn Up a Node” of the
Cisco ONS 15454 DWDM Network Configuration Guide or Cisco NCS 2002 and NCS
2006 Network Configuration Guide
· “NTP-G179 Install the TXP, MXP, GE_XP, 10GE_XP, GE_XPE, 10GE_XPE, ADM-10G,
and OTU2_XP Cards” task in the chapter “Turn Up a Node” of the Cisco ONS 15454
DWDM Network Configuration Guide or Cisco NCS 2002 and NCS 2006 Network
Configuration Guide
Complete the “NTP-G34 Install Fiber-Optic Cables on DWDM Cards and DCUs”
procedure in the chapter “Turn Up a Node” of the Cisco ONS 15454 DWDM Network
Configuration Guide or Cisco NCS 2002 and NCS 2006 Network Configuration
Guide. Complete the following tasks or procedures, as needed:
· If you switched a Y-cable protection group in Step 5, on page 4, complete
the “DLP-G180 Clear a Manual or Force Y-Cable or Splitter Protection Switch”
task in the Manage the Node document.
· If you deleted circuits in Step 5, on page 4, complete the “DLP-G105
Provision Optical Channel Network Connections” task in the chapter “Create
Optical Channel Circuits and Provisionable Patchcords” of the Cisco ONS 15454
DWDM Network Configuration Guide or Cisco NCS 2002 and NCS 2006 Network
Configuration Guide.
· If you switched the timing reference in Step 5, on page 4, complete the
“NTP-G112 Change the Node Timing Reference” procedure in the chapter “Maintain
the Node” of the Cisco ONS 15454 DWDM Network Configuration Guide or Cisco NCS
2002 and NCS 2006 Network Configuration Guide to change the reference back to
the new card.
· If you deleted an OSC or GCC termination in Step 5, on page 4, complete the
“NTP-G38 Provision OSC Terminations” procedure in the chapter “Turn Up a Node”
or the “DLP-G76 Provision GCC Terminations” task in the chapter “Create
Optical Channel Circuits and Provisionable Patchcords” of the Cisco ONS 15454
DWDM Network Configuration Guide or Cisco NCS 2002 and NCS 2006 Network
Configuration Guide.
Go to Step 13, on page 6. To permanently remove a card, complete the following
tasks:
· Delete the circuits associated with the card being removed. Complete the
“DLP-G106 Delete Optical Channel Network Connections” task, the “DLP-G347
Delete Optical Channel Client Connections” task, or the “DLP-G418 Delete an
Optical Channel Trail” task in the chapter “Create Optical Channel Circuits
and Provisionable Patchcords” of the Cisco ONS 15454 DWDM Network
Configuration Guide or Cisco NCS 2002 and NCS 2006 Network Configuration Guide
as needed.
· Delete the DWDM patchcords and optical side associated with the card being
removed. Complete the “NTP-G209 Create, Edit, and Delete Optical Sides”
procedure in the chapter “Turn Up a Node” of the
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 5
DLP-G254 Place Amplifier Ports Out of Service
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series
Step 12 Step 13
Cisco ONS 15454 DWDM Network Configuration Guide or Cisco NCS 2002 and NCS
2006 Network Configuration Guide.
· If there are pluggable port modules (PPMs) that terminate on the card,
complete the “DLP-G280 Delete a PPM” task in the chapter “Provision
Transponder and Muxponder Cards” of the Cisco ONS 15454 DWDM Network
Configuration Guide or Cisco NCS 2002 and NCS 2006 Network Configuration Guide
to delete these PPMs.
· Physically remove the card:
· Disconnect and remove any cables, patchcords, and attenuators attached to
the card.
· Open the card latches/ejectors.
· Use the latches/ejectors to pull the card forward and away from the shelf.
If the card you are removing is an OSCM, OSC-CSM, DWDM Amplifier, or Filter
card, complete the following tasks; otherwise, go to Step 13, on page 6.
· Reconfigure the circuits (OCHCC, OCHNC, Trails) as needed. Complete the
“DLP-G280 Delete a PPM” procedure in the chapter “Provision Transponder and
Muxponder Cards”, the “DLP-G346 Provision Optical Channel Client Connections”
task, or the “DLP-G395 Create an Optical Channel Trail” task in the chapter
“Create Optical Channel Circuits and Provisionable Patchcords”of the Cisco ONS
15454 DWDM Network Configuration Guide or Cisco NCS 2002 and NCS 2006 Network
Configuration Guide.
· Reload ANS provisioning. Complete the “NTP-G143 Import the Cisco Transport
Planner NE Update Configuration File” procedure in the chapter “Turn Up a
Node”of the Cisco ONS 15454 DWDM Network Configuration Guide or Cisco NCS 2002
and NCS 2006 Network Configuration Guide.
· Relaunch ANS. Complete the “NTP-G37 Run Automatic Node Setup” task in the
chapter “Turn Up a Node” of the Cisco ONS 15454 DWDM Network Configuration
Guide or Cisco NCS 2002 and NCS 2006 Network Configuration Guide.
Click the Alarms tab. a) Verify that the alarm filter is not on. See the
“DLP-G128 Disable Alarm Filtering” task in the Alarm and
TCA Monitoring and Management document as necessary. b) Verify that no
unexplained alarms appear on the network. If alarms appear, investigate and
resolve them.
Refer to the Cisco ONS 15454 DWDM Troubleshooting Guide or Cisco NCS 2002 and
NCS 2006 Troubleshooting Guide for procedures.
Stop. You have completed this procedure.
DLP-G254 Place Amplifier Ports Out of Service
Purpose Tools/Equipment
This task places OPT-BST, OPT-BST-E, OPT-BST-L, OPT-PRE, OPT-AMP-L, or OPT-
AMP-17-C card ports out of service in preparation for card removal.
None
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 6
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series
DLP-G318 Place Amplifier Ports In Service
Prerequisite Procedures
Required/As Needed Onsite/Remote Security Level
Procedure
“DLP-G46 Log into CTC” task in the “Connect the PC and Log into the GUI”
document.
As needed
Onsite or remote
Provisioning or higher
Step 1
Step 2 Step 3
Step 4 Step 5 Step 6 Step 7
Step 8 Step 9 Step 10
On the shelf graphic in CTC, double-click the OPT-BST, OPT-BST-E, OPT-BST-L,
OPT-AMP-L, OPT-PRE, or OPT-AMP-17-C card with the ports that you want to put
out of service.
Click the Provisioning > Optical Line > Parameters tabs.
In the Admin State column for the card’s ports, choose OOS,MT (ANSI) or
Locked,disabled (ETSI) for each port that does not have an OOS-MA,DSBLD or
Locked-enabled,disabled service state.
Click Apply.
In the confirmation dialog box, click Yes.
Click the Provisioning > Opt Ampli Line > Parameters tabs.
In the Admin State column for the card’s ports, choose OOS,MT or IS,AINS
(ANSI) or Locked,maintenance or unlocked,automaticinservice (ETSI) for each
port that does not have an OOS-MA,DSBLD or Locked,disabled service state.
Click Apply.
In the confirmation dialog box, click Yes.
Return to your originating procedure (NTP).
DLP-G318 Place Amplifier Ports In Service
Purpose
Tools/Equipment Prerequisite Procedures
Required/As Needed Onsite/Remote Security Level
This task places OPT-BST, OPT-BST-E, OPT-BST-L, OPT-AMP-L, OPT-PRE, or OPT-
AMP-17-C card ports in service.
None
“DLP-G46 Log into CTC” task in the “Connect the PC and Log into the GUI”
document.
As needed
Onsite or remote
Provisioning or higher
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 7
NTP-G129 Add a DWDM Node
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series
Procedure
Step 1 Step 2 Step 3
Step 4 Step 5 Step 6
On the shelf graphic in CTC, double-click the OPT-BST, OPT-BST-E, OPT-BST-L,
OPT-AMP-L, OPT-PRE, or OPT-AMP-17-C card with the ports that you want to put
in service.
Click the Provisioning > Optical Line > Parameters tabs.
In the Admin State column for the card’s ports, choose IS,AINS (ANSI) or
Unlocked-automaticInService (ETSI) for Port 1 (COM-RX) of the OPT-PRE card (or
OPT-AMP-L or OPT-AMP-17-C cards provisioned in OPT-PRE mode), or Port 2 (OSC-
RX) and Port 3 (COM-TX) of the OPT-BST, OPT-BST-E, or OPT-BST-L cards (or OPT-
AMP-L or OPT-AMP-17-C cards provisioned in OPT-LINE mode).
Click Apply.
In the confirmation dialog box, click Yes.
Return to your originating procedure (NTP).
NTP-G129 Add a DWDM Node
Purpose Tools/Equipment Prerequisite Procedures
Required/As Needed Onsite/Remote Security Level
This procedure adds a DWDM node to an existing DWDM network.
None
· “DLP-G46 Log into CTC” task in the “Connect the PC and Log into the GUI”
document.
· Complete the turn up procedures in the “Turn Up a Node” chapter in the Cisco
ONS 15454 DWDM Network Configuration Guid or Cisco NCS 2002 and NCS 2006
Network Configuration Guidefor the node to be added.
· An updated Cisco Transport Planner network plan recalculated with the new
node.
As needed
Onsite
Provisioning or higher
Caution During this procedure, spans will be disconnected in the network at the point where the new node is added. This is traffic affecting for any unprotected circuits that pass through these spans.
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 8
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series
NTP-G129 Add a DWDM Node
Procedure
Step 1 Step 2
Step 3 Step 4 Step 5 Step 6 Step 7
Step 8
Step 9 Step 10 Step 11
Step 12 Step 13 Step 14
If the Cisco Transport Planner network design has not been updated and
recalculated for the new node and client services, update and recalculate it
now, using the procedures in the Cisco Transport Planner – DWDM Operations
Guide .
Complete the “NTP-G51 Verify DWDM Node Turn Up” procedure in the chapter “Turn
Up a Network” of the Cisco ONS 15454 DWDM Network Configuration Guide or Cisco
NCS 2002 and NCS 2006 Network Configuration Guide for the node to be added. If
the node has not been turned up, do not continue. Complete the relevant
procedures in the chapters “Turn Up a Node” and “Perform Node Acceptance
Tests” in the Cisco ONS 15454 DWDM Network Configuration Guide or Cisco NCS
2002 and NCS 2006 Network Configuration Guide, before you begin this procedure
again.
Identify the spans that must be disconnected to insert the new node.
From the View menu, choose Go to Network View.
In network view, click the Circuits tab.
Identify the OCHCC, OCHNC, or OCHTRAIL circuits on the fiber spans identified
in Step 3, on page 9 on both the Side B-to-Side A and Side A-to-Side B
directions.
If the OCHCC, OCHNC, or OCHTRAIL circuit is on the active path and is
protected by a splitter or Y-cable protection group, complete the “DLP-G179
Apply a Force Y-Cable or Splitter Protection Switch” task in the Manage the
Node document to divert traffic away from the span where the node will be
added and continue with Step 9, on page 9. If the circuit is unprotected, go
to Step 8, on page 9.
(Optional) Place the unprotected circuits in OOS,DSBLD (ANSI) or
Locked,disabled (ETSI) state by completing the following steps:
a) In the network view, select the OCHNC, OCHCC, or OCHTRAIL circuit and click
Edit. b) In the Edit Circuit dialog box, click the State tab. c) In the State
field, choose the OOS,DSBLD (ANSI) or Locked,disabled (ETSI) option from the
drop-down
list. d) Click Apply, then click OK.
Remove the fibers from the cards at the adjacent nodes that will connect to
the new node.
Install the fibers from the adjacent nodes to the new node using the “NTP-G34
Install Fiber-Optic Cables on DWDM Cards and DCUs” procedure in the chapter
“Turn Up a Node” of the Cisco ONS 15454 DWDM Network Configuration Guide or
Cisco NCS 2002 and NCS 2006 Network Configuration Guide.
Update the ANS parameters for the adjacent nodes by completing the following
steps:
a) Display an adjacent node in the node view. b) Complete the “NTP-G143 Import
the Cisco Transport Planner NE Update Configuration File” procedure
in the chapter “Turn Up a Node” of the Cisco ONS 15454 DWDM Network
Configuration Guide or Cisco NCS 2002 and NCS 2006 Network Configuration Guide
to load the new NE Update file to the node. c) Complete the “NTP-G37 Run
Automatic Node Setup” procedure in the chapter “Turn Up a Node”of the Cisco
ONS 15454 DWDM Network Configuration Guide or Cisco NCS 2002 and NCS 2006
Network Configuration Guide to recalculate the ANS parameters of the node. d)
Repeat Steps 11.b, on page 9 and 11.c, on page 9 for the second adjacent node.
Log out of CTC and log back in.
From the View menu, choose the Go to Network View option to display the nodes.
The new node must appear on the network map. Wait for a few minutes to allow
all the nodes to appear.
Click the Circuits tab and wait for all the circuits to appear, including
spans. Count the number of incomplete circuits.
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 9
NTP-G130 Remove a DWDM Node
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series
Step 15 Step 16 Step 17 Step 18
Step 19 Step 20
In the network view, right-click the new node and choose the Update Circuits
With New Node option from the shortcut menu. Wait for the confirmation dialog
box to appear. Verify that the number of updated circuits that appear in the
dialog box is correct.
If the circuits take more than a minute to appear, log out of CTC, and log
back in.
Click the Circuits tab and verify there are no incomplete circuits.
Put the circuits placed in OOS,DSBLD (ANSI) or Locked,disabled (ETSI) in Step
8, on page 9 back in service by completing the following steps:
a) In the network view, select the OCHNC, OCHCC, or OCHTRAIL circuit and click
Edit. b) In the Edit Circuit dialog box, click the State tab. c) In the State
field, choose the IS-AINS (ANSI) or Unlocked,automaticInService (ETSI) option
from the
drop-down list. d) Click Apply, then click OK.
Complete the “DLP-G180 Clear a Manual or Force Y-Cable or Splitter Protection
Switch” task in the Manage the Node document for the circuits that were
switched in Step 7, on page 9 to return the traffic to its original paths.
Complete the “DLP-G105 Provision Optical Channel Network Connections” task in
the chapter “Create Optical Channel Circuits and Provisionable Patchcords” of
the Cisco ONS 15454 DWDM Network Configuration Guide or Cisco NCS 2002 and NCS
2006 Network Configuration Guide to create new circuits.
Stop. You have completed this procedure.
NTP-G130 Remove a DWDM Node
Purpose
Tools/Equipment Prerequisite Procedures
Required/As Needed Onsite/Remote Security Level
This procedure removes a node from a DWDM network.
None
A Cisco Transport Planner network plan recalculated for the new topology.
As needed
Onsite or remote
Provisioning or higher
Note During this procedure, you will use TL1 commands to delete and recreate OCHNC or OCHCC cross-connects. You might need to refer to the Cisco ONS SONET TL1 Command Guide, Cisco ONS SDH TL1 Command Guide or Cisco NCS TL1 Command Guide.
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 10
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series
NTP-G130 Remove a DWDM Node
Caution This procedure will affect the service of unprotected circuits that
pass through the span where the node will be removed.
Procedure
Step 1 Step 2 Step 3 Step 4 Step 5
Step 6
Step 7 Step 8
Step 9
If the Cisco Transport Planner network design has not been updated and
recalculated with the node removed, update and recalculate the design now by
following the procedures in the Cisco Transport Planner documentation.
Complete the “DLP-G46 Log into CTC” task in the “Connect the PC and Log into
the GUI” document at the DWDM target node that will be removed.
Click the Circuits tab.
Identify all the OCHNCs and OCHCCs that are passing through or are added and
dropped at the node that will be removed.
Delete the OCHNCs and OCHCCs identified in Step 4, on page 11 that terminate
(add/drop) on the target DWDM node. See the “DLP-G347 Delete Optical Channel
Client Connections” task and/or the “DLP-G106 Delete Optical Channel Network
Connections” task in the chapter “Create Optical Channel Circuits and
Provisionable Patchcords” of the Cisco ONS 15454 DWDM Network Configuration
Guide or Cisco NCS 2002 and NCS 2006 Network Configuration Guide to delete
OCHCCs and OCHNCs, respectively.
For the protected pass through circuits on the target node, perform Step 7, on
page 11. Else, go to Step 10, on page 12.
Note
Non-protected pass through circuits need not be modified or deleted.
If the OCHNC and OCHCC circuits pass through the target node on the active
path and are protected by a splitter or Y-cable protection group, navigate to
an adjacent node connected to the target node and complete the “DLP-G179 Apply
a Force Y-Cable or Splitter Protection Switch” task in the Manage the Node
document to force the traffic away from the node that will be deleted.
Otherwise, continue with Step 8, on page 11. Complete the following steps for
the protected pass through circuits: a) Select the OCHNCs or OCHCCs and click
Edit. b) In the Edit Circuit dialog box, click the State tab. c) In the State
field, choose OOS,DSBLD (ANSI) or Locked,disabled (ETSI) from the drop-down
list. d) Click Apply, then click OK.
Complete the following steps to delete the cross-connects on the target node
for each circuit placed in the OOS,DSBLD (ANSI) or Locked,disabled (ETSI)
state in Step 8, on page 11: a) From the Tools menu, choose Open TL1
Connection. b) In the Select Node dialog box, select the new node and click
OK. c) In the TL1 dialog box, use the DLT-OCHNC command to delete the OCHNC
cross-connects for each
unprotected pass-through circuit as follows:
DLT-OCHNC:[
where:
·
·
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 11
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series NTP-G261 Modify ANS Parameters in a Node when Ports are in IS State
Step 10 Step 11
Step 12 Step 13 Step 14
·
·
For additional information, including valid command values, refer to the Cisco
ONS SONET TL1 Command Guide, Cisco ONS SDH TL1 Command Guide or Cisco NCS TL1
Command Guide.
d) Click Close to close the TL1 dialog box.
Remove the fibers from the target node, and reconnect the fibers to the
adjacent nodes. Note that once the fibers are rerouted, the non-protected pass
through circuits will go to OOS-PARTIAL (ANSI) or Locked-partial (ETSI) state.
Complete the following steps to update the ANS parameters at the adjacent
nodes: a) Display an adjacent node in node view. b) Complete the “NTP-G143
Import the Cisco Transport Planner NE Update Configuration File” procedure
in the chapter “Turn Up a Node” of the Cisco ONS 15454 DWDM Network
Configuration Guide or Cisco NCS 2002 and NCS 2006 Network Configuration Guide
to load the new NE Update file onto the node. c) Complete the “NTP-G37 Run
Automatic Node Setup” task in the chapter “Turn Up a Node” of the Cisco ONS
15454 DWDM Network Configuration Guide or Cisco NCS 2002 and NCS 2006 Network
Configuration Guide to recalculate the ANS parameters at the node. d) Display
the next adjacent node in node view. e) Repeat Steps 11.b, on page 12 and
11.c, on page 12 for the second adjacent node.
Repeat Step 8, on page 11 to change the circuits placed in OOS,DSBLD (ANSI) or
Locked,disabled (ETSI) back in service by changing the Target Circuit Admin
State field to IS-AINS (ANSI) or Unlocked,AutomaticInService (ETSI).
Complete the “DLP-G180 Clear a Manual or Force Y-Cable or Splitter Protection
Switch” task in the Manage the Node document for the OCHNCs and/or OCHCCs that
were switched in Step 7, on page 11.
To discover the non-protected pass though circuits that are in the OOS-PARTIAL
(ANSI) or Locked-partial (ETSI) state after completing Step 10, on page 12,
select the circuit and choose Tools > Circuits > Reconfigure Circuits from the
menu bar. The Reconfigure Circuits dialog box is displayed; click Yes.
Stop. You have completed this procedure.
NTP-G261 Modify ANS Parameters in a Node when Ports are in IS State
Purpose Tools/Equipment
This task modifies ANS parameters when ports are in IS state.
None
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 12
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series NTP-G146 Add a Rack, Passive Shelf, Passive Unit, or Shelf to a Multishelf Node
Prerequisite Procedures
Required/As Needed Onsite/Remote Security Level
“DLP-G46 Log into CTC” task in the “Connect the PC and Log into the GUI”
document.
As needed
Onsite or remote
Provisioning or higher
Caution Provisioning the ANS parameters incorrectly may impact traffic.
Therefore, this procedure must be performed by Cisco qualified personnel only.
Procedure
Step 1
Step 2 Step 3
Complete the “NTP-G143 Import the Cisco Transport Planner NE Update
Configuration File” task in the chapter “Turn Up a Node” of the Cisco NCS 2002
and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM Network
Configuration Guide to re-import the updated configuration file. If the
updated configuration file is not available, complete the “DLP-G681 Modify an
ANS Parameter” task in the chapter “Turn Up a Node” of the Cisco NCS 2002 and
NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM Network
Configuration Guide to manually edit the ANS parameters.
Complete the “NTP-G37 Run Automatic Node Setup” task in the chapter “Turn Up a
Node” of the Cisco NCS 2002 and NCS 2006 Network Configuration Guide or Cisco
ONS 15454 DWDM Network Configuration Guide.
Verify if the modified ANS parameters were applied. Perform the following
steps: a) In node view (single-shelf mode) or multishelf view (multishelf
mode), click the Provisioning >
WDM-ANS > Provisioning tabs. b) Verify if the Result column displays the value
Success Changed. This indicates that the ANS parameter
has been successfully changed with the ports in IS. c) Verify if the Set By
column displays either of the following values:
· ANS–This indicates that the new value for the ANS parameters is applied
immediately.
· APC–This indicates that the new value for the ANS parameters is increased or
decreased by 0.5 dB until the new power setpoint is reached.
Stop. You have completed this procedure.
NTP-G146 Add a Rack, Passive Shelf, Passive Unit, or Shelf to a Multishelf Node
Purpose
This procedure adds a rack, passive shelf, passive unit, or subtending shelf to a multishelf node.
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 13
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series NTP-G146 Add a Rack, Passive Shelf, Passive Unit, or Shelf to a Multishelf Node
Tools/Equipment Prerequisite Procedures
Required/As Needed Onsite/Remote Security Level
None
One of the following procedures, in the Cisco ONS 15454 Hardware Installation
Guide :
· “NTP-G301 Connect the ONS 15454 Multishelf Node and Subtending Shelves to an
MS-ISC-100T Card” in the
· “NTP-G302 Connect the ONS 15454 Multishelf Node and Subtending Shelves to a
Catalyst 2950”.
· “NTP-G295 Connect the ONS 15454 Multishelf Node and Subtending Shelves to a
Catalyst 3560”.
· “NTP-G296 Upgrade the ONS 15454 Multishelf with MS-ISC Card Configuration
Using the Catalyst 3560”.
· “NTP-G297 Upgrade the ONS 15454 Multishelf with Catalyst 2950 Configuration
Using the Catalyst 3560”.
· “NTP-G308 Connect the ONS 15454 M6 Multishelf Node and the ONS 15454 M6
Subtending Shelves”.
· “NTP-G309 Connect the ONS 15454 M6 and the ONS 15454 in a Mixed Multishelf
Configuration”.
· “NTP-G310 Upgrade the ONS 15454 Multishelf Configuration using the ONS 15454
M6”.
· “Turn Up a Node” chapter in the Cisco ONS 15454 Configuration Guide.
One of the following procedures, in the Cisco NCS 2002 and NCS 2006 Hardware
Installation Guide
· NTP-L15 Connecting the NCS 2006 Multishelf Node and the NCS 2006 Subtending
Shelves
· NTP-G318 Connecting the NCS 2006 Multishelf Node and the NCS 2006 Subtending
Shelves in a Ring Topology
As needed
Onsite
Provisioning or higher
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 14
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series NTP-G146 Add a Rack, Passive Shelf, Passive Unit, or Shelf to a Multishelf Node
Note Each shelf you want to add to a multishelf configuration must have
network connectivity. For more information, see the “Connect the PC and Log
into the GUI” document.
Procedure
Step 1 Step 2 Step 3
Step 4 Step 5 Step 6 Step 7 Step 8 Step 9
Step 10
Step 11 Step 12 Step 13 Step 14 Step 15 Step 16 Step 17
Complete the “DLP-G46 Log into CTC” task in the “Connect the PC and Log into
the GUI” document at the multishelf DWDM node where you want to add a shelf.
To add a rack, in the multishelf view, right-click the gray area and choose
Add Rack. If you do not need to add a rack, continue with Step 3, on page 15.
To add a passive unit, in the multishelf view, right-click the gray space
inside the rack and choose the passive unit from the Add Shelf > PASSIVE
CHASSIS options. The passive unit is added to the rack.
Note
This step does not apply to passive units that are to be installed within the passive shelf.
Note
To add a passive DCU, you need to choose a slot number from the Slot Number Selection dialog
box and click OK.
To add a MF-6RU unit, in the multishelf view right-click the gray space inside
the rack and choose Add Shelf > PASSIVE SHELF MF. The Shelf ID Section dialog
is displayed. Choose a shelf ID and click OK. The MF-6RU unit is added to the
rack. To add a MF10-6RU unit, in the multishelf view right-click the gray
space inside the rack and choose Add Shelf > PASSIVE SHELF MF10.The Shelf ID
Section dialog is displayed. Choose a shelf ID and click OK. The MF10-6RU unit
is added to the rack. To add a passive unit to the MF-6RU or MF10-6RU shelf,
double-click the shelf to open shelf mode or right-click the passive shelf and
choose Open Shelf. Right-click a slot inside the passive shelf and choose Add
Card > WDM > PASSIVE > passive unit
The MF-2MPO-ADP, MF-4X4-COFS, MF-DEG-5, MF-MPO-8LC, MF-6AD-CFS, and MF-UPG-4
passive units can be provisioned in the MF-6RU passive shelf.
The MF-10AD-CFS, MF-16AD-CFS, MF-16AE-CFS, MF-MPO-16LC, MF-8X10G-FO, and MF-
MPO-20LC passive units can be provisioned in the MF10-6RU passive shelf.
To add a shelf for ONS 15454, in the multishelf view right-click the gray
space inside the rack and choose Add Shelf > CHASSIS_454SDH(ETSI) or
CHASSIS_454(ANSI) or 15454 M6 ANSI or 15454 M6 ETSI. and To add a shelf for
NCS 2006 in the multishelf view right-click the gray space inside the rack and
choose Add Shelf > NCS 2006. In the Shelf ID Selection dialog box, choose a
shelf ID from the drop-down list. Click OK. The shelf appears in the
multishelf view. Complete the “DLP-G46 Log into CTC” task in the “Connect the
PC and Log into the GUI” document at the new shelf that has to be configured
as a subtending shelf. In multishelf view, click the Provisioning > General >
Multishelf Config tabs. Click Enable as Subtended Shelf. From the Shelf ID
drop-down list, choose the shelf ID that you created in Step 11, on page 15.
Click Apply.
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 15
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series NTP-G146 Add a Rack, Passive Shelf, Passive Unit, or Shelf to a Multishelf Node
Step 18 Step 19 Step 20 Step 21
Step 22
In the confirmation dialog box, click Yes to reboot the shelf. The CTC view
changes to network view and the node icon changes to gray. (This might take
several minutes.)
If you are connecting the new ONS 15454 subtending shelf to the Ethernet
Adapter Panel (EAP), complete the following steps. If not, continue with Step
22, on page 16.
a) Using a cross-over (CAT 5) LAN cable, plug one connector into the RJ-45
front panel port of the subtending shelf TCC2/TCC2P/TCC3 card in Slot 7 and
plug the other end into the SSC port on the left patch panel.
b) Using a cross-over (CAT 5) LAN cable, plug one connector into the RJ-45
front panel port of the subtending shelf TCC2/TCC2P/TCC3 card in Slot 11 and
plug the other end into the SSC port on the right patch panel.
If you are connecting the ONS 15454 subtending shelf to the Catalyst 2950 or
the Catalyst 3560 switch, complete the following steps. If not, continue with
Step 22, on page 16.
a) Plug one end of a cross-over (CAT-5) LAN cable into the RJ-45 front panel
port of the subtending shelf TCC2/TCC2P/TCC3 card in Slot 7 and plug the other
end into Port 2 of the active Catalyst 2950 or Catalyst 3560.
b) Plug one end of a cross-over (CAT-5) LAN cable into the RJ-45 front panel
port of the subtending shelf TCC2/TCC2P/TCC3 card in Slot 11 and plug the
other end into Port 2 of the standby Catalyst 2950 or Catalyst 3560.
To connect an ONS 15454 M6 or NCS 2006 subtending shelf to the Catalyst 3560
switches, complete the following:
a) Using a cross-over (CAT-5) LAN cable, plug one connector into the MSM port
that corresponds to the TNC/TNCE/TSC/TSCE card in Slot 1 of the subtending ONS
15454 M6 NCS 2006 shelf and plug the other end into Port 2 of the active
Catalyst 3560.
b) Using a cross-over (CAT-5) LAN cable, plug one connector into the MSM port
that corresponds to the TNC/TNCE/TSC/TSCE card in Slot 8 and plug the other
end into Port 2 of the standby Catalyst 3560.
c) Repeat Steps 21.a, on page 16 and 21.b, on page 16 for each subtending
shelf in the multishelf configuration using Ports 3 through 21 on the Catalyst
3560 switches.
Note
In order to connect the ONS 15454 M6 or NCS 2006 subtending shelves to the ONS 15454 M6
or NCS 2006 node controller without using a catalyst, follow the steps described in “NTP-G308
Connect the ONS 15454 M6NCS 2006 Multishelf Node and the ONS 15454 M6 Subtending
Shelves” in the Cisco ONS 15454 Hardware Installation Guide or NTP-L15 Connecting the NCS
2006 Multishelf Node and the NCS 2006 Subtending Shelves in the Cisco NCS 2002 and NCS
2006 Hardware Installation Guide. To connect an ONS 15454 subtending shelf to the ONS 15454
M6 node controller without using a catalyst switch, connect the MSM ports that correspond to
the TNC/TNCE/TSC/TSCE cards in Slot 1 and Slot 8 of the ONS 15454 M6 node controller to
the ONS 15454 subtending shelf TCC2/TCC2P/TCC3 cards in Slot 7 and Slot 11.
Repeat Step 10, on page 15 through Step 22, on page 16 for each subtending
shelf in the multishelf configuration.
Stop. You have completed this procedure.
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 16
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series NTP-G147 Delete a Passive Unit, Passive Shelf, Shelf, or Rack from a Multishelf Node
NTP-G147 Delete a Passive Unit, Passive Shelf, Shelf, or Rack from a Multishelf Node
Purpose
Tools/Equipment Prerequisite Procedures
This procedure deletes a passive unit, passive shelf, shelf, or rack from a
multishelf node.
None
One of the following procedures, in the Cisco ONS 15454 Hardware Installation
Guide :
· “NTP-G301 Connect the ONS 15454 Multishelf Node and Subtending Shelves to an
MS-ISC-100T Card” in the
· “NTP-G302 Connect the ONS 15454 Multishelf Node and Subtending Shelves to a
Catalyst 2950”.
· “NTP-G295 Connect the ONS 15454 Multishelf Node and Subtending Shelves to a
Catalyst 3560”.
· “NTP-G296 Upgrade the ONS 15454 Multishelf with MS-ISC Card Configuration
Using the Catalyst 3560”.
· “NTP-G297 Upgrade the ONS 15454 Multishelf with Catalyst 2950 Configuration
Using the Catalyst 3560”.
· “NTP-G308 Connect the ONS 15454 M6 Multishelf Node and the ONS 15454 M6
Subtending Shelves”.
· “NTP-G309 Connect the ONS 15454 M6 and the ONS 15454 in a Mixed Multishelf
Configuration”.
· “NTP-G310 Upgrade the ONS 15454 Multishelf Configuration using the ONS 15454
M6”.
· “Turn Up a Node” chapter in the Cisco ONS 15454 Configuration Guide.
One of the following procedures, in the Cisco NCS 2002 and NCS 2006 Hardware
Installation Guide
· NTP-L15 Connecting the NCS 2006 Multishelf Node and the NCS 2006 Subtending
Shelves
· NTP-G318 Connecting the NCS 2006 Multishelf Node and the NCS 2006 Subtending
Shelves in a Ring Topology
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 17
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series NTP-G147 Delete a Passive Unit, Passive Shelf, Shelf, or Rack from a Multishelf Node
Required/As Needed Onsite/Remote Security Level
As needed Onsite or remote Provisioning or higher
Note You cannot delete a node controller shelf from a multishelf node configuration. Procedure
Step 1 Step 2
Step 3 Step 4 Step 5 Step 6
Complete the”DLP-G46 Log into CTC” task in the “Connect the PC and Log into
the GUI” document at the multishelf DWDM node where you want to delete a
passive unit, shelf, or rack. If you want to delete a passive unit, continue
with Step 2, on page 18. If you want to delete a shelf, continue with Step 6,
on page 18. If you want to delete only a rack, go to Step 13, on page 19.
Complete the following tasks, as needed:
· If passive units on the shelf carry unprotected circuits, you must delete
the circuits. Complete the “DLP-G106 Delete Optical Channel Network
Connections” task and the “DLP-G347 Delete Optical Channel Client Connections”
task in the chapter “Create Optical Channel Circuits and Provisionable
Patchcords”of the Cisco ONS 15454 DWDM Network Configuration Guide or Cisco
NCS 2002 and NCS 2006 Network Configuration Guide.
· If passive units use internal patchcords, complete the “DLP-G355 Delete an
Internal Patchcord” task in the chapter “Turn Up a Node” of the Cisco ONS
15454 DWDM Network Configuration Guide or Cisco NCS 2002 and NCS 2006 Network
Configuration Guide.
From the View menu, choose Go to Parent View to return to multishelf view.
Right-click the passive unit you want to delete and choose Delete Unit. The
shelf is automatically deleted.
Right-click the passive shelf that you want to delete and choose Delete Shelf.
The shelf is automatically deleted.
Note
You must first delete the passive units from the passive shelf before deleting the shelf.
Complete the following tasks, as needed:
· If cards on the shelf carry unprotected circuits, you must delete the
circuits. Complete the “DLP-G106 Delete Optical Channel Network Connections”
task and the “DLP-G347 Delete Optical Channel Client Connections” task in the
chapter “Create Optical Channel Circuits and Provisionable Patchcords” of the
Cisco ONS 15454 DWDM Network Configuration Guide or Cisco NCS 2002 and NCS
2006 Network Configuration Guide.
· If cards use internal patchcords, complete the “DLP-G355 Delete an Internal
Patchcord” task in the chapter “Turn Up a Node” of the Cisco ONS 15454 DWDM
Network Configuration Guide or Cisco NCS 2002 and NCS 2006 Network
Configuration Guide.
· If OSCM or OSC-CSM cards with OSC or GCC terminations are on the shelf,
complete the “NTP-G85 Modify or Delete OSC Terminations, GCC Terminations, and
Provisionable Patchcords” task in the Manage the Node document to delete the
terminations.
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 18
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series NTP-G173 Convert an OADM Node to a ROADM Node
Step 7 Step 8 Step 9 Step 10
Step 11
Step 12 Step 13
· Put all ports in the Out-of-Service and Management, Disabled (OOS-MA,DSBLD) (ANSI) or Locked-enabled,disabled (ETSI) service state. For more information, see the chapter “Change DWDM Card Settings” of the Cisco ONS 15454 DWDM Network Configuration Guide or Cisco NCS 2002 and NCS 2006 Network Configuration Guide.
Note
It is not necessary to delete the cards from the shelf before deleting a shelf.
· If the shelf receives the timing signals from any client or trunk port, complete the “DLP-G95 Set Up External or Line Timing” task in the chapter “Turn Up a Network” of the Cisco ONS 15454 DWDM Network Configuration Guide or Cisco NCS 2002 and NCS 2006 Network Configuration Guide, to receive timing signals from an external source.
From the View menu, choose Go to Parent View to return to multishelf view.
Right-click the subtending shelf you want to delete and choose Delete Shelf.
In the confirmation dialog box, click Yes.
To return the deleted shelf to a single-shelf node, you must use the LCD
panel:
a) Repeatedly press the Status button until Shelf Status appears. b)
Repeatedly press the Port button until Controller Status=MS Config appears. c)
Press Status again and press Port to set multishelf mode to MS=N. d) Press
Status again and press Port until ID is set to ID=1. e) Press Status again and
press Port to set VLAN=N. f) Press Status to choose Done. g) Repeatedly press
Status until “Save and Reboot?” appears, and then press Slot to choose Apply.
This
reboots the shelf. A “Saving changes; TCC may reboot” message appears on the
LCD.
After the control cards reboot is complete, complete the following steps to
disconnect the removed subtending shelf from the patch panel or Catalyst 2950
or Catalyst 3560:
a) Remove the cross-over (CAT 5) LAN cable from the RJ-45 front panel port of
the TCC2/TCC2P/TCC3 card in Slot 7 of the ONS 15454 or from the MSM port that
corresponds to TNC/TNCE/TSC/TSCE card in Slot 1 of the ONS 15454 M6 or NCS
2006.
b) Remove the cross-over (CAT 5) LAN cable from the RJ-45 front panel port of
the TCC2/TCC2P/TCC3 card in Slot 11 of the ONS 15454 or from the MSM port that
corresponds to TNC/TNCE/TSC/TSCE card in Slot 8 of the ONS 15454 M6 or NCS
2006.
Reconnect the shelf to the LAN through either the backplane or one of the
RJ-45 front panel ports of the TCC2/TCC2P/TCC3 cards of the ONS 15454, or the
EMS port or one of the RJ-45 front panel ports of the TNC/TNCE/TSC/TSCE cards
of the ONS 15454 M6 or NCS 2006. For more information, see the Connect the PC
and Log into the GUI document.
To delete an empty rack from the CTC window, right-click the gray area on the
rack graphic and choose Delete Rack.
Stop. You have completed this procedure.
NTP-G173 Convert an OADM Node to a ROADM Node
Purpose
This procedure converts an OADM node to a ROADM node.
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 19
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series NTP-G173 Convert an OADM Node to a ROADM Node
Tools/Equipment Prerequisite Procedures
Required/As Needed Onsite/Remote Security Level
None
· Turn Up a Network” chapter in the Cisco NCS 2002 and NCS 2006 Network
Configuration Guide or Cisco ONS 15454 DWDM Network Configuration Guide
· A Cisco Transport Planner site plan recalculated for the new ROADM node.
As needed
Onsite
Provisioning or higher
Note Do not begin this procedure until the Cisco Transport Planner site plan has been recalculated with the new ROADM node. You will import the new NE Update file and run ANS to recalculate the ANS parameters. In addition, you will run ANS at the two adjacent nodes to recalculate the ANS parameters at those nodes.
Note During this procedure, you will use TL1 commands to delete and recreate OCHNC or OCHCC cross-connects. You might need to refer to the Cisco ONS SONET TL1 Command Guide, Cisco ONS SDH TL1 Command Guide or Cisco NCS TL1 Command Guide.
Caution This procedure will affect the service of unprotected circuits that pass through the OADM node. Procedure
Step 1 Step 2 Step 3 Step 4
Step 5
Complete the “DLP-G46 Log into CTC” task in the “Connect the PC and Log into
the GUI” document at a node in the OADM network. In node view (single-shelf
mode) or multishelf view (multishelf mode), display the OADM node that you
will convert to a ROADM node. Click the Circuits tab. Make a list of the
following OCHNCs and/or optical channel client connections (OCHCCs) that:
· Terminate (add/drop) at the node.
· Pass through the node on the express path for both the Side B-to-Side A and
Side A-to-Side B directions.
If OCHNCs and/or OCHCCs identified in are routed on the active path of a
splitter or Y-cable protection group, complete the following steps. If not,
continue with Step 6, on page 21. a) Display the node containing the TXP, MXP,
ADM-10G, GE_XP, 10GE_XP, GE_XPE, 10GE_XPE, or
ITU-T line card with the Y-cable or splitter protection.
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 20
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series NTP-G173 Convert an OADM Node to a ROADM Node
Step 6 Step 7 Step 8 Step 9 Step 10
Step 11
Step 12
b) Force the traffic to the protect path in the opposite side of the ring
using the “DLP-G179 Apply a Force Y-Cable or Splitter Protection Switch” task
in the Manage the Node document.
In node view, display the node that will be converted. Complete the “DLP-G347
Delete Optical Channel Client Connections” task and/or the “DLP-G106 Delete
Optical Channel Network Connections” task in the chapter “Create Optical
Channel Circuits and Provisionable Patchcords” of the Cisco NCS 2002 and NCS
2006 Network Configuration Guide or Cisco ONS 15454 DWDM Network Configuration
Guide to delete OCHCCs and/or OCHNCs identified inStep 4, on page 20 that:
· Terminate (add/drop) at the node.
· Pass through the node on an unprotected express path for both the Side B-to-
Side A and Side A-to-Side B directions.
From the Tools menu, choose Open TL1 Connection. In the Select Node dialog
box, choose the OADM node and click OK. In the TL1 dialog box, use the DLT-
OCHNC command to delete the OCHNC cross-connects for the express path OCHNCs
listed in Step 4, on page 20, using the following format: DLT-
OCHNC:[
where:
·
·
·
·
For additional information, including valid command values, refer to the Cisco
ONS SONET TL1 Command Guide, Cisco ONS SDH TL1 Command Guide, or Cisco NCS TL1
Command Guide.
In the TL1 dialog box, use the DLT-OCHCC command to delete the OCHCC cross-
connects for the express path OCHCCs listed in Step 4, on page 20, using the
following format: DLT-
OCHCC:[
where:
·
·
·
For additional information, including valid command values, refer to the Cisco
ONS SONET TL1 Command Guide, Cisco ONS SDH TL1 Command Guide,or Cisco NCS TL1
Command Guide.
Click Close to close the TL1 dialog box.
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 21
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series NTP-G173 Convert an OADM Node to a ROADM Node
Step 13
Step 14
Step 15 Step 16 Step 17 Step 18 Step 19 Step 20 Step 21 Step 22
Step 23 Step 24
Delete the internal patchcords:
a) In node view (single-shelf mode) or multishelf view (multishelf mode),
click the Provisioning > WDM-ANS > Internal Patchcords tabs.
b) Highlight all of the internal patchcords. c) Click Delete. d) Click Yes on
the confirmation dialog box.
Delete the OSC terminations:
a) Click the Provisioning > Comm Channels > OSC tabs. b) Highlight all of the
OSC terminations. c) Click Delete. d) Click Yes on the confirmation dialog
box.
Remove any amplifier cards (OPT-BST, OPT-PRE) that are installed but not
required in the ROADM node.
Install the new ROADM cards in the slots identified by your Cisco Transport
Planner site plan using the “NTP-G30 Install the DWDM Cards” task in the
chapter “Turn Up a Node” of the Cisco NCS 2002 and NCS 2006 Network
Configuration Guide or Cisco ONS 15454 DWDM Network Configuration Guide.
Complete the “NTP-G34 Install Fiber-Optic Cables on DWDM Cards and DCUs”
procedure in the chapter “Turn Up a Node” of the Cisco NCS 2002 and NCS 2006
Network Configuration Guide or Cisco ONS 15454 DWDM Network Configuration
Guide for the ROADM node, following the new internal connections table
generated by Cisco Transport Planner.
Complete the “NTP-G152 Create and Verify Internal Patchcords” procedure in the
chapter “Turn Up a Node” of the Cisco NCS 2002 and NCS 2006 Network
Configuration Guide or Cisco ONS 15454 DWDM Network Configuration Guide to
recreate the internal patchcords deleted in Step 13, on page 22.
Complete the NTP-G38 Provision OSC Terminations” procedure in the chapter
“Turn Up a Node” of the Cisco NCS 2002 and NCS 2006 Network Configuration
Guide or Cisco ONS 15454 DWDM Network Configuration Guide to recreate the OSC
terminations deleted in Step 14.
Import the recalculated ROADM site parameters using the “NTP-G143 Import the
Cisco Transport Planner NE Update Configuration File” procedure in the chapter
“Turn Up a Node” of the Cisco NCS 2002 and NCS 2006 Network Configuration
Guide or Cisco ONS 15454 DWDM Network Configuration Guide.
Complete the “NTP-G37 Run Automatic Node Setup” task in the chapter “Turn Up a
Node” of the Cisco NCS 2002 and NCS 2006 Network Configuration Guide or Cisco
ONS 15454 DWDM Network Configuration Guide.
Update the ANS parameters at the adjacent nodes:
a) Display an adjacent node in node view. b) Complete the “NTP-G143 Import the
Cisco Transport Planner NE Update Configuration File” procedure
in the chapter “Turn Up a Node” of the Cisco NCS 2002 and NCS 2006 Network
Configuration Guide or Cisco ONS 15454 DWDM Network Configuration Guide to
load the new NE Update file onto the node. c) Complete the “NTP-G37 Run
Automatic Node Setup” task in the chapter “Turn Up a Node” of the Cisco NCS
2002 and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM Network
Configuration Guide to recalculate the ANS parameters at the node. d) Display
the next adjacent node in node view. e) Repeat 22.b, on page 22 and 22.c, on
page 22 for the second adjacent node.
Display the new ROADM node in node view.
Recreate the OCHNCs and/or OCHCCs deleted in Step 7, on page 21 using the
following tasks:
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 22
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series NTP-G176 Convert an Line Amplifier Node to an OADM Node
Step 25
· “DLP-G346 Provision Optical Channel Client Connections” task in the chapter
“Create Optical Channel Circuits and Provisionable Patchcords” of the Cisco
NCS 2002 and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM
Network Configuration Guide.
· “DLP-G105 Provision Optical Channel Network Connections” task in the chapter
“Create Optical Channel Circuits and Provisionable Patchcords” of the Cisco
NCS 2002 and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM
Network Configuration Guide.
Complete the “DLP-G180 Clear a Manual or Force Y-Cable or Splitter Protection
Switch” task in the Manage the Node document for OCHNCs and/or OCHCCs that
were switched to the opposite side of the ring as part of a splitter or
Y-cable protection group to return the traffic to its condition before the
card was added.
Stop. You have completed this procedure.
NTP-G176 Convert an Line Amplifier Node to an OADM Node
Purpose Tools/Equipment Prerequisite Procedures
This procedure converts a full line amplifier node with OPT-PRE and OPT-BST
cards installed on each side of the shelf to an OADM node.
Cisco Transport Planner reports and NE Update file for the new OADM node.
· Turn Up a Network” chapter in the Cisco NCS 2002 and NCS 2006 Network
Configuration Guide or Cisco ONS 15454 DWDM Network Configuration Guide
· A Cisco Transport Planner site plan recalculated for the new ROADM node
Required/As Needed Onsite/Remote Security Level
As needed Onsite Provisioning or higher
Procedure
Step 1
Step 2 Step 3
Complete the “NTP-G139 Verify Cisco Transport Planner Reports and Files” task
in the chapter “Turn Up a Node” of the Cisco NCS 2002 and NCS 2006 Network
Configuration Guide or Cisco ONS 15454 DWDM Network Configuration Guide to
verify that you have the files and reports prepared by Cisco Transport Planner
for the OADM node.
Complete the “DLP-G46 Log into CTC” task in the “Connect the PC and Log into
the GUI” document at the line amplifier node.
Click the Circuits tab.
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 23
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series NTP-G176 Convert an Line Amplifier Node to an OADM Node
Step 4
Step 5
Step 6 Step 7 Step 8 Step 9 Step 10 Step 11 Step 12 Step 13 Step 14 Step 15
Make a list of the OCHNCs, OCH trails, and OCHCCs that pass through the node on the express path for both the Side B-to-Side A and Side A-to-Side B directions.
Caution
You will delete the optical channel circuits in the next step and use the list to recreate the circuits later. Do not proceed until you complete the circuit list.
Delete the circuits identified in Step 4, on page 24 using one or more of the
following tasks:
· “DLP-G347 Delete Optical Channel Client Connections” task in the chapter
“Create Optical Channel Circuits and Provisionable Patchcords” of the Cisco
NCS 2002 and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM
Network Configuration Guide
· “DLP-G418 Delete an Optical Channel Trail” task in the chapter “Create
Optical Channel Circuits and Provisionable Patchcords” of the Cisco NCS 2002
and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM Network
Configuration Guide
· “DLP-G106 Delete Optical Channel Network Connections” task in the chapter
“Create Optical Channel Circuits and Provisionable Patchcords” of the Cisco
NCS 2002 and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM
Network Configuration Guide
Click the Provisioning > WDM-ANS > Internal Patchcords tabs.
In the internal patchcords table, click the OPT-PRE COM-TX to OPT-BST COM-RX
internal patchcord.
Click Delete.
On the confirmation dialog, click OK.
Remove the physical fiber and attenuators, if present, that connect the COM-TX
to COM-RX ports and COM-RX to COM-TX ports between the OPT-BST and OPT-PRE
cards installed in Side B.
Click Default Patchcords.
Complete the “NTP-G143 Import the Cisco Transport Planner NE Update
Configuration File” procedure in the chapter “Turn Up a Node” of the Cisco NCS
2002 and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM Network
Configuration Guide.
Complete the “NTP-G37 Run Automatic Node Setup” task in the chapter “Turn Up a
Node” of the Cisco NCS 2002 and NCS 2006 Network Configuration Guide or Cisco
ONS 15454 DWDM Network Configuration Guide.
In node view, click the Circuits tab.
Complete one or more of the following procedures to recreate circuits
identified in Step 4, on page 24 that will pass through the OADM node:
· “DLP-G346 Provision Optical Channel Client Connections” task in the chapter “Create Optical Channel Circuits and Provisionable Patchcords” of the Cisco NCS 2002 and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM Network Configuration Guide
· “DLP-G105 Provision Optical Channel Network Connections” task in the chapter “Create Optical Channel Circuits and Provisionable Patchcords”of the Cisco NCS 2002 and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM Network Configuration Guide
· “DLP-G395 Create an Optical Channel Trail” task in the chapter “Create Optical Channel Circuits and Provisionable Patchcords” of the Cisco NCS 2002 and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM Network Configuration Guide
Note
Cisco recommends that you recreate the circuits one at a time.
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 24
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series NTP-G182 Convert a Line Amplifier Node to a ROADM Node
Step 16 Step 17
Verify that each circuit appears on the Circuits table with a DISCOVERED
status and an IS/Unlocked state. If not, complete Step 14, on page 24 and Step
15, on page 24.
If the circuits still do not appear with a DISCOVERED status and IS/Unlocked
state, contact your next level of support.
Referring to the Cisco Transport Planner Traffic Matrix report, repeat Step
15, on page 24 and Step 16, on page 25 to create the new add/drop circuits at
the node, as needed.
Stop. You have completed this procedure.
NTP-G182 Convert a Line Amplifier Node to a ROADM Node
Purpose Tools/Equipment Prerequisite Procedures
This procedure converts a line amplifier node with OPT-PRE and OPT-BST cards
installed on each side of the shelf to an ROADM node.
Cisco Transport Planner reports and NE Update file for the new ROADM node.
· “Turn Up a Network” chapter in the Cisco NCS 2002 and NCS 2006 Network
Configuration Guide orCisco ONS 15454 DWDM Network Configuration Guide
· A Cisco Transport Planner site plan recalculated for the new ROADM node.
Required/As Needed Onsite/Remote Security Level
As needed Onsite Provisioning or higher
Caution This procedure will affect the service of unprotected circuits that pass through the ROADM node.
Caution
This procedure applies to line amplifier nodes with OPT-BST and OPT-PRE cards installed on both sides of the shelf. If the line amplifier node has a different configuration, the upgrade might affect the adjacent nodes and require an update of their ANS parameters. If the line amplifier node is not a full line amplifier, contact your next level of support.
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 25
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series NTP-G182 Convert a Line Amplifier Node to a ROADM Node
Procedure
Step 1 Step 2 Step 3 Step 4
Step 5
Step 6 Step 7 Step 8 Step 9 Step 10 Step 11
Step 12 Step 13
Complete the “NTP-G139 Verify Cisco Transport Planner Reports and Files” task
in the chapter “Turn Up a Node” of the Cisco NCS 2002 and NCS 2006 Network
Configuration Guide or Cisco ONS 15454 DWDM Network Configuration Guide to
verify that you have the files and reports prepared by Cisco Transport Planner
for the ROADM node.
Complete the “DLP-G46 Log into CTC” task in the “Connect the PC and Log into
the GUI document at the line amplifier node.
Click the Circuits tab.
Make a list of the following OCHNCs, OCH trails, and OCHCCs that pass through
the node on the express path for both the Side B-to-Side A and Side A-to-Side
B directions.
Caution
You will delete the optical channel circuits in the next step and use the list to recreate the circuits later. Do not proceed until you complete the circuit list.
Delete the circuits identified in Step 4, on page 26 using one or more of the
following tasks:
· “DLP-G347 Delete Optical Channel Client Connections” task in the chapter
“Create Optical Channel Circuits and Provisionable Patchcords” of the Cisco
NCS 2002 and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM
Network Configuration Guide
· “DLP-G418 Delete an Optical Channel Trail” task in the chapter “Create
Optical Channel Circuits and Provisionable Patchcords” of the Cisco NCS 2002
and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM Network
Configuration Guide
· “DLP-G106 Delete Optical Channel Network Connections” task in the chapter
“Create Optical Channel Circuits and Provisionable Patchcords” of the Cisco
NCS 2002 and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM
Network Configuration Guide
Click the Provisioning > WDM-ANS > Internal Patchcords tabs. In the internal
patchcords table, click the OPT-PRE COM-TX to OPT-BST COM-RX internal
patchcord. Click Delete. In the confirmation dialog box, click OK. Remove the
physical fiber and attenuators, if present, that connect the COM-TX to COM-RX
ports and COM-RX to COM-TX ports between the OPT-BST and OPT-PRE cards
installed in Side B. Referring to the Cisco Transport Planner Shelf Layout
report, install one of the following sets of cards on both Side B and Side A
of the node as described by the Cisco Transport Planner NE Update file:
· 32WSS and 32DMX cards
· 32WSS-L and 32DMX-L cards
· 40-WSS-C/40-WSS-CE and 40-DMX-C/40-DMX-CE cards
Referring to the Cisco Transport Planner Internal Connections report, connect
the fibers to the new wavelength selective switch and demultiplexer cards.
Complete the “NTP-G143 Import the Cisco Transport Planner NE Update
Configuration File” procedure in the chapter “Turn Up a Node” of the Cisco NCS
2002 and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM Network
Configuration Guide
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 26
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series NTP-G195 Convert a Protected ROADM Node from two Separate Nodes to a Single Multishelf Node
Step 14 Step 15 Step 16 Step 17 Step 18
Step 19 Step 20
Verify that the new internal patchcords are created for the physical cables
connected to the new wavelength selective switch and demultiplexer cards in
Step 12, on page 26. If not, complete the “NTP-G242 Create an Internal
Patchcord Manually” task in the chapter “Turn Up a Node” of the Cisco NCS 2002
and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM Network
Configuration Guide to manually create the internal patchcords.
Complete the “NTP-G143 Import the Cisco Transport Planner NE Update
Configuration File” procedure in the chapter “Turn Up a Node” of the Cisco NCS
2002 and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM Network
Configuration Guide.
Complete the “NTP-G37 Run Automatic Node Setup” task in the chapter “Turn Up a
Node” of the Cisco NCS 2002 and NCS 2006 Network Configuration Guide or Cisco
ONS 15454 DWDM Network Configuration Guide.
In node view, click the Circuits tab.
Complete one or more of the following procedures to recreate circuits
identified in Step 4, on page 26 that will pass through the ROADM node:
· DLP-G105 Provision Optical Channel Network Connections” task in the chapter
“Create Optical Channel Circuits and Provisionable Patchcords”of the Cisco NCS
2002 and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM Network
Configuration Guide
· “DLP-G346 Provision Optical Channel Client Connections” task in the chapter
“Create Optical Channel Circuits and Provisionable Patchcords” of the Cisco
NCS 2002 and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM
Network Configuration Guide
· “DLP-G395 Create an Optical Channel Trail” task in the chapter “Create
Optical Channel Circuits and Provisionable Patchcords” of the Cisco NCS 2002
and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM Network
Configuration Guide
Note
Cisco recommends that you recreate the circuits one at a time.
Verify that each circuit appears on the Circuits table with a DISCOVERED
status and an IS/Unlocked state. If not, repeat Step 17, on page 27 and Step
18, on page 27.
If the circuits still do not appear with a DISCOVERED status and IS/Unlocked
state, contact your next level of support.
Referring to the Cisco Transport Planner Traffic Matrix report, repeat Step
17, on page 27 and Step 18, on page 27 to create the new add/drop circuits at
the node, as needed.
Stop. You have completed this procedure.
NTP-G195 Convert a Protected ROADM Node from two Separate Nodes to a Single Multishelf Node
Purpose Tools/Equipment
This procedure converts a protected ROADM node from two separate nodes to a
single multishelf node.
None
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 27
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series NTP-G195 Convert a Protected ROADM Node from two Separate Nodes to a Single Multishelf Node
Prerequisite Procedures
Required/As Needed Onsite/Remote Security Level
· “Turn Up a Network” chapter in the Cisco NCS 2002 and NCS 2006 Network
Configuration Guide or Cisco ONS 15454 DWDM Network Configuration Guide
· A Cisco Transport Planner site plan recalculated for the new node.
As needed
Onsite or remote
Provisioning or higher
Caution This procedure will affect the service of unprotected circuits that pass through the ROADM node.
Caution
This procedure applies to two ROADM nodes, where ROADM Node 1 has amplifier cards (such as, OPT-BST and OPT-PRE) or optical service channel cards (OSCM or OSC-CSM) installed on both the sides of the shelf and 40-WSS-C/40-DMX-C card (or the 32WSS/32DMX and 32WSS-L/32DMX-L cards) installed in Side A (Slots 1 through 6) and the ROADM Node 2 has amplifier cards (such as, OPT-BST and OPT- PRE) or optical service channel cards (OSCM or OSC-CSM) installed on both the sides of the shelf and 40-WSS-C/40-DMX-C card (or the 32WSS/32DMX and 32WSS-L/32DMX-L cards) installed in Side B (Slots 12 through 17).
Note In this procedure, ROADM Node 1 will be used as node controller and ROADM
Node 2 will be added to the multishelf configuration as a subtending shelf.
Procedure
Step 1 Step 2
Complete the “NTP-G139 Verify Cisco Transport Planner Reports and Files” task
in the chapter “Turn Up a Node” of the Cisco NCS 2002 and NCS 2006 Network
Configuration Guide or Cisco ONS 15454 DWDM Network Configuration Guide to
verify that you have the files and reports prepared by Cisco Transport Planner
for the ROADM nodes.
Complete the “DLP-G46 Log into CTC” task in the “Connect the PC and Log into
the GUI” document at ROADM Node 1. The following figure shows the shelf view
of ROADM Node 1.
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 28
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco
NCS 2000 Series NTP-G195 Convert a Protected ROADM Node from two Separate
Nodes to a Single Multishelf Node
Figure 1: ROADM Node 1 Shelf View
The following figure shows the functional view of ROADM Node 1.
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 29
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco
NCS 2000 Series NTP-G195 Convert a Protected ROADM Node from two Separate
Nodes to a Single Multishelf Node
Figure 2: ROADM Node 1 Functional View
Step 3 Step 4
Step 5
Click the Circuits tab.
Make a list of all the OCHNCs, OCH trails, and OCHCCs that pass through or
terminate (add/drop) at the amplifier or optical service channel cards
installed in Side B of ROADM Node 1.
Caution
You will delete only the pass-through circuits in the next step and use the list to recreate the circuits later. Do not proceed until you complete the circuit list. The add/drop circuits will not be deleted and continues to transport traffic.
If OCHNCs and/or OCHCCs identified in Step 4, on page 30 are routed on the active path of a splitter or Y-cable protection group, complete the following steps. If not, continue with Step 6, on page 31.
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 30
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series NTP-G195 Convert a Protected ROADM Node from two Separate Nodes to a Single Multishelf Node
Step 6
Step 7 Step 8 Step 9 Step 10 Step 11 Step 12 Step 13 Step 14 Step 15 Step 16
Step 17
a) Display the node containing the amplifier or optical service channel cards
with the Y-cable or splitter protection.
b) Force the traffic to the protect path in the opposite side of the ring
using the “DLP-G179 Apply a Force Y-Cable or Splitter Protection Switch” task
in the Manage the Node document.
Delete the circuits identified in Step 4, on page 30 using one or more of the
following tasks:
· “DLP-G347 Delete Optical Channel Client Connections” task in the chapter
“Create Optical Channel Circuits and Provisionable Patchcords”of the Cisco NCS
2002 and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM Network
Configuration Guide
· “DLP-G418 Delete an Optical Channel Trail” task in the chapter “Create
Optical Channel Circuits and Provisionable Patchcords” of the Cisco NCS 2002
and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM Network
Configuration Guide
· “DLP-G106 Delete Optical Channel Network Connections” task in the chapter
“Create Optical Channel Circuits and Provisionable Patchcords”of the Cisco NCS
2002 and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM Network
Configuration Guide
Click the Provisioning > WDM-ANS > Optical Side tab. In the optical sides
table, click the optical side corresponding to the amplifier or optical
service channel cards installed in Side B of ROADM Node 1. Click Delete. In
the confirmation dialog box, click Yes. Click the Provisioning > WDM-ANS >
Internal Patchcords tab. Look in the To column of the internal patchcords
table and make a list of internal patchcords that connect the amplifier or
optical service channel cards in Side B to the 40-WSS-C/40-DMX-C card (or the
32WSS/32DMX and 32WSS-L/32DMX-L cards) in Side A of ROADM Node 1. Click
Delete. In the confirmation dialog box, click Yes. Remove the physical fiber
and attenuators, if present, that connect the amplifier or optical service
channel cards in Side B to the 40-WSS-C/40-DMX-C card (or the 32WSS/32DMX and
32WSS-L/32DMX-L cards) in Side A of ROADM Node 1. Complete the NTP-G107 Remove
Permanently or Remove and Replace DWDM Cards, on page 3 to delete the
amplifier or optical service channel cards installed in Side B of ROADM Node
- Complete the “DLP-G46 Log into CTC” task in the “Connect the PC and Log into the GUI” document at the ROADM Node 2. The following figure shows the ROADM Node 2 shelf view.
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 31
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco
NCS 2000 Series NTP-G195 Convert a Protected ROADM Node from two Separate
Nodes to a Single Multishelf Node
Figure 3: OADM Node 2 Shelf View
The following figure shows the functional view of ROADM Node 1.
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 32
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco
NCS 2000 Series NTP-G195 Convert a Protected ROADM Node from two Separate
Nodes to a Single Multishelf Node
Figure 4: ROADM Node 2 Functional View
Step 18 Step 19
Step 20
Step 21
Click the Circuits tab.
Make a list of all the OCHNCs, OCH trails, and OCHCCs that pass through or
terminate (add/drop) at the amplifier or optical service channel cards
installed in Side A of ROADM Node 2.
Caution
You will delete all the pass-through and add/drop circuits in the next step and use the list to recreate the circuits later. Do not proceed until you complete the circuit list.
If OCHNCs and/or OCHCCs identified in Step 19, on page 33 are routed on the
active path of a splitter or Y-cable protection group, complete the following
steps. If not, continue with Step 21, on page 33.
a) Display the node containing the amplifier or optical service channel cards
with the Y-cable or splitter protection.
b) Force the traffic to the protect path in the opposite side of the ring
using the “DLP-G179 Apply a Force Y-Cable or Splitter Protection Switch” task
in the Manage the Node document.
Delete the circuits identified in Step 19, on page 33 using one or more of the
following tasks:
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 33
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series NTP-G195 Convert a Protected ROADM Node from two Separate Nodes to a Single Multishelf Node
Step 22
Step 23 Step 24 Step 25 Step 26 Step 27 Step 28
Step 29 Step 30 Step 31
Step 32
Step 33 Step 34
Step 35
· “DLP-G347 Delete Optical Channel Client Connections” task in the chapter
“Create Optical Channel Circuits and Provisionable Patchcords” of the Cisco
NCS 2002 and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM
Network Configuration Guide
· “DLP-G418 Delete an Optical Channel Trail” task in the chapter “Create
Optical Channel Circuits and Provisionable Patchcords” of the Cisco NCS 2002
and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM Network
Configuration Guide
· “DLP-G106 Delete Optical Channel Network Connections” task in the chapter
“Create Optical Channel Circuits and Provisionable Patchcords” of the Cisco
NCS 2002 and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM
Network Configuration Guide
If overhead circuits exist in the amplifier or optical service channel cards
installed in Side A of ROADM Node 2, complete “DLP-G112 Delete Overhead
Circuits” task in the chapter “Create Optical Channel Circuits and
Provisionable Patchcords” of the Cisco NCS 2002 and NCS 2006 Network
Configuration Guide or Cisco ONS 15454 DWDM Network Configuration Guide to
delete these overhead circuits.
Click the Provisioning > WDM-ANS > Optical Side tab.
In the optical sides table, click the optical side corresponding to the
amplifier or optical service channel cards installed in Side A of ROADM Node
2.
Click Delete.
In the confirmation dialog box, click Yes.
Click the Provisioning > WDM-ANS > Internal Patchcords tab.
Look in the To column of the internal patchcords table and make a list of
internal patchcords that connect the amplifier or optical service channel
cards in Side A to the 40-WSS-C/40-DMX-C card (or the 32WSS/32DMX and
32WSS-L/32DMX-L cards) in Side B of ROADM Node 2.
Click Delete.
In the confirmation dialog box, click Yes.
Remove the physical fiber and attenuators, if present, that connect the
amplifier or optical service channel cards in Side A to the 40-WSS-C/40-DMX-C
card (or the 32WSS/32DMX and 32WSS-L/32DMX-L cards) in Side B of ROADM Node 2.
If there are pluggable port modules (PPMs) that terminate on the ROADM Node 2,
complete the “DLP-G280 Delete a PPM” task in the chapter “Provision
Transponder and Muxponder Cards” of the Cisco NCS 2002 and NCS 2006 Network
Configuration Guide or Cisco ONS 15454 DWDM Network Configuration Guide to
delete these PPMs.
Complete the NTP-G107 Remove Permanently or Remove and Replace DWDM Cards, on
page 3 to delete the amplifier or optical service channel cards installed in
Side A of ROADM Node 2.
Complete the “NTP-G163 Upgrade Nodes in Single-Shelf Mode to Multishelf Mode”
task in the chapter “Turn Up a Node” of the Cisco NCS 2002 and NCS 2006
Network Configuration Guide or Cisco ONS 15454 DWDM Network Configuration
Guide to upgrade ROADM Node 1 to a multishelf configuration and add ROADM Node
2 as a subtending shelf. The following figure shows the final multishelf view
of the node.
In the multishelf view, click the Provisioning > WDM-ANS > Internal Patchcords
tab.
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 34
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco
NCS 2000 Series NTP-G195 Convert a Protected ROADM Node from two Separate
Nodes to a Single Multishelf Node
Figure 5: Final Multishelf View of the Node
Step 36 Step 37
Step 38 Step 39
Click Create. The Internal Patchcord Creation wizard appears. In the Internal
Patchcord Attributes page, choose OTS/OCH to OTS/OCH option and select the
Bidirectional check box. Click Next. In the Internal Patchcord Origination
page, provision the internal patchcord origination parameters.
· Shelf–Choose the shelf where the internal patchcord originates.
· Slot–Choose one of the two 40-WSS-C cards (or the 32WSS/32DMX and
32WSS-L/32DMX-L cards) where the internal patchcord originates.
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 35
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series NTP-G195 Convert a Protected ROADM Node from two Separate Nodes to a Single Multishelf Node
Step 40 Step 41
Step 42 Step 43 Step 44 Step 45 Step 46 Step 47 Step 48 Step 49
Step 50 Step 51
· Tx Port–Choose the EXP TX port were the internal patchcord originates.
Click Next. In the Internal Patchcord Termination page, provision the internal
patchcord origination parameters.
· Shelf–Choose the shelf where the internal patchcord terminates.
· Slot–Choose the other 40-WSS-C card (or the 32WSS/32DMX and 32WSS-L/32DMX-L
cards) where the internal patchcord terminates.
· Rx Port–Choose the EXP RX port were the internal patchcord terminates.
Click Next.
Review the display-only information on the Internal Patchcord Origination
Reverse page. This page shows the shelf, slot, and port that CTC will use for
the opposite internal patchcord origination route
Click Next.
Review the information displayed on the Internal Patchcord Termination Reverse
page. This display-only page shows the shelf, slot, and port that CTC will use
for the reverse internal patchcord termination route.
Click Finish. The new internal patchcord appears on the Internal Patchcord
table.
Complete the “NTP-G37 Run Automatic Node Setup” task in the chapter “Turn Up a
Node” of the Cisco NCS 2002 and NCS 2006 Network Configuration Guide or Cisco
ONS 15454 DWDM Network Configuration Guide.
In node view, click the Circuits tab.
Complete one or more of the following procedures to recreate circuits
identified in Steps 4 and Step 19, on page 33:
· “DLP-G105 Provision Optical Channel Network Connections” task in the chapter
“Create Optical Channel Circuits and Provisionable Patchcords” of the Cisco
NCS 2002 and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM
Network Configuration Guide
· “DLP-G346 Provision Optical Channel Client Connections” task in the chapter
“Create Optical Channel Circuits and Provisionable Patchcords” of the Cisco
NCS 2002 and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM
Network Configuration Guide
· “DLP-G395 Create an Optical Channel Trail” task in the chapter “Create
Optical Channel Circuits and Provisionable Patchcords” of the Cisco NCS 2002
and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM Network
Configuration Guide
Note
Cisco recommends that you recreate the circuits one at a time.
Complete the “NTP-G60 Create and Delete Overhead Circuits” task in the chapter
“Create Optical Channel Circuits and Provisionable Patchcords” of the Cisco
NCS 2002 and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM
Network Configuration Guide to recreate circuits deleted in Step 22, on page
34.
Verify that each circuit appears on the Circuits table with a DISCOVERED
status and an IS/Unlocked state. If not, repeat Step 48, on page 36 and Step
49, on page 36.
If the circuits still do not appear with a DISCOVERED status and IS/Unlocked
state, contact your next level of support.
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 36
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series NTP-G242 Modify the CD setting of TDC-CC and TDC-FC Cards
Step 52 Step 53
Click the Provisioning > Pluggable Port Module > Pluggable Port Module tab and
click Create to recreate the PPMs deleted in Step 32, on page 34.
Complete the “DLP-G180 Clear a Manual or Force Y-Cable or Splitter Protection
Switch” task in the Manage the Node document for OCHNCs and/or OCHCCs that
were switched to the opposite side of the ring as part of a splitter or
Y-cable protection group to return the traffic to its original condition.
Stop. You have completed this procedure.
NTP-G242 Modify the CD setting of TDC-CC and TDC-FC Cards
Purpose Tools/Equipment Prerequisite Procedures
Required/As Needed Onsite/Remote Security Level
This procedure allows you to modify the CD settings of the TDC-CC and TDC-FC
cards.
None
“NTP-G30 Install the DWDM Cards” task in the chapter “Turn Up a Node” of the
Cisco NCS 2002 and NCS 2006 Network Configuration Guide or Cisco ONS 15454
DWDM Network Configuration Guide.
As needed
Onsite or remote
Provisioning or higher
Procedure
Step 1 Step 2
Step 3
Complete the “DLP-G46 Log into CTC” task in the Connect the PC and Log into
the GUI document at the node where you want to change the TDC-CC or TDC-FC
card settings. If you are already logged in, continue with the next step.
Complete the “NTP-G103 Back Up the Database” task in the chapter “Maintain the
Node” of the Cisco NCS 2002 and NCS 2006 Network Configuration Guide or Cisco
ONS 15454 DWDM Network Configuration Guide.
Note
Changing the CD value of the T-DCU can severely affect the performance of the channels traveling
through the T-DCU. As a general rule the new value is provided through an additional analysis
performed by the CTP. In this case, complete the “NTP-G328 Add, Modify, and Delete ANS
Parameters” task in the chapter “Turn Up a Node” of the Cisco NCS 2002 and NCS 2006 Network
Configuration Guide or Cisco ONS 15454 DWDM Network Configuration Guide. If for some
reason, the “NTP-G328 Add, Modify, and Delete ANS Parameters” task cannot be applied, then
a skilled operator can directly change the CD value according to the CTP findings. To modify
the CD setting of the TDC-CC or TDC-FC card proceed to the next step.
To modify the CD setting of the TDC-CC or TDC-FC card, perform any of the following tasks as needed:
Note
As the operation is traffic affecting, change the CD value during a maintenance window.
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 37
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series DLP-G526 Modify the CD Value of the TDC-CC and TDC-FC When Connected to OPT-AMP-C, OPT-PRE, 40-SMR-1 and 40-SMR-2 Cards
Step 4
· DLP-G526 Modify the CD Value of the TDC-CC and TDC-FC When Connected to OPT-
AMP-C, OPT-PRE, 40-SMR-1 and 40-SMR-2 Cards, on page 38
· DLP-G527 Modify the CD Value of the TDC-CC and TDC-FC Cards when Connected
to OPT-RAMP-C and OPT-RAMP-CE Amplifiers, on page 39
Complete the “NTP-G103 Back Up the Database” task in the chapter “Maintain the
Node” of the Cisco NCS 2002 and NCS 2006 Network Configuration Guide or Cisco
ONS 15454 DWDM Network Configuration Guide.
Stop. You have completed this procedure.
DLP-G526 Modify the CD Value of the TDC-CC and TDC-FC When Connected to OPT- AMP-C, OPT-PRE, 40-SMR-1 and 40-SMR-2 Cards
Purpose
Tools/Equipment Prerequisite Procedures Required/As Needed Onsite/Remote
Security Level
This procedure allows you to modify the CD value when the TDC-CC and TDC-FC
cards are connected to the DC ports of the OPT-PRE, OPT-AMP-C, 40-SMR-1 and
40-SMR-2 cards.
None
“DLP-G46 Log into CTC” task in the “Connect the PC and Log into the GUI”
document.
As needed
Onsite or remote
Provisioning or higher
Procedure
Step 1 Step 2
Step 3 Step 4
Before you modify the CD value of the TDC-CC or TDC-FC card, disable the
Automatic Power Control (APC) in the domain that has the TDC-CC or TDC-FC
card. To disable the APC domain, complete the “DLP-G157 Disable Automatic
Power Control” task in the Manage the Node document.
Modify the CD value for the TDC-CC or TDC-FC Card. To modify the CD value,
Complete the “DLP-G545 Modify the Chromatic Dispersion Value for the TDC-CC
and TDC-FC Cards” task in the chapter “Change DWDM Card Settings” of the Cisco
NCS 2002 and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM
Network Configuration Guide.
Enable the APC domain that has the TDC-CC or TDC-FC card. To enable the APC
domain, complete the “DLP-G158 Enable Automatic Power Control” task in the
Manage the Node document.
Return to your originating procedure (NTP).
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 38
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series DLP-G527 Modify the CD Value of the TDC-CC and TDC-FC Cards when Connected to OPT-RAMP-C and OPT-RAMP-CE Amplifiers
DLP-G527 Modify the CD Value of the TDC-CC and TDC-FC Cards when Connected to OPT-RAMP-C and OPT-RAMP-CE Amplifiers
Purpose
Tools/Equipment Prerequisite Procedures Required/As Needed Onsite/Remote
Security Level
This procedure allows you to modify the CD value of the TDC-CC and TDC-FC
cards when connected to the DC ports of the OPT-RAMP-C and OPT-RAMP-CE
amplifiers.
None
“DLP-G46 Log into CTC” task in the “Connect the PC and Log into the GUI”
document.
As needed
Onsite or remote
Provisioning or higher
Procedure
Step 1 Step 2
Step 3 Step 4 Step 5 Step 6
Before you modify the CD value of the TDC-CC or TDC-FC card, run the APC. To run the APC, complete the “DLP-G430 Run Automatic Power Control” task in the Manage the Node document.
Modify the CD value for the TDC-CC or TDC-FC Card. To modify the CD value, Complete the “DLP-G545 Modify the Chromatic Dispersion Value for the TDC-CC and TDC-FC Cards” task in the chapter “Change DWDM Card Settings” of the Cisco NCS 2002 and NCS 2006 Network Configuration Guide or Cisco ONS 15454 DWDM Network Configuration Guide.
Note
Do not change the compensation value directly in one instance. In order to avoid traffic drops
and alarms, it is required to change the CD value in steps not too large. For example, if you want
to change the CD value of a TDC-CC from -880 to -1320 ps/nm, do not change the CD value in
a single step, but in a couple of steps. Change the CD value to an intermediate value of -1100
ps/nm and then to -1320 ps/nm. Change the CD value of the TDC-CC by steps no larger than
330 ps/nm and the CD value of the TDC-FC by steps no larger than 270 ps/nm. This approach
of changing the CD value avoids misleading alarms and traffic drops.
Run the APC. To run the APC, complete the “DLP-G430 Run Automatic Power
Control” task in the Manage the Node document. If the APC correction skipped
alarm appears, then force the APC correction. Do the following: a) Click the
alarmed port. b) Click the Maintenance tab. c) Click the Force APC correction
button.
Repeat Step 2, on page 39 and Step 4, on page 39 until the CD target value is
set. Return to your originating procedure (NTP).
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 39
Additional References
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series
Additional References
Related Documents Use this document in conjunction with the other release- specific documentation listed in this table:
Link Cisco ONS Documentation Roadmap
Description
Provides quick access to publications of Cisco ONS releases.
Cisco ONS 15454 DWDM Control Card and Node Configuration Guide
Provides background and reference material and procedures for installation and configuration of control cards and node configuration on Cisco ONS 15454 dense wavelength division multiplexing (DWDM) systems.
Cisco ONS 15454 DWDM Line Card Configuration Guide
Provides background and reference material and procedures for installation and configuration of line cards on Cisco ONS 15454 dense wavelength division multiplexing (DWDM) systems.
Cisco ONS 15454 DWDM Network Configuration Guide
Provides background and reference material, procedures for turn up, provisioning, and maintenance of Cisco ONS 15454 dense wavelength division multiplexing (DWDM) systems.
Cisco ONS 15454 DWDM Troubleshooting Guide
Provides general troubleshooting instructions, alarm troubleshooting instructions, and a list of error messages that apply to the Cisco ONS 15454 dense wavelength division multiplexing (DWDM) systems.
Release Notes for Cisco ONS 15454
Provides information about new features and enhancements for the Cisco ONS 15454 DWDM platforms.
Cisco ONS 15454 Hardware Installation Guide Provides installation information of the Cisco ONS 15454 hardware.
Cisco ONS 15454 DWDM Licensing Guide
Provides information about installing and managing Cisco ONS 15454 DWDM licenses.
Cisco ONS SDH TL1 Command Guide Cisco ONS SONET TL1 Command Guide
Provides a comprehensive list of TL1 commands.
Installing the GBIC, SFP, SFP+, XFP, CXP, Provides information about the Pluggable Port Modules CFP, and CPAK Optical Modules in Cisco ONS support. Platforms
Link
Cisco NCS 2000 Series Documentation Roadmap
Description
Provides quick access to publications of Cisco NCS 2000 Series releases.
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 40
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series Communications, Services, and Additional Information
Link
Description
Cisco NCS 2000 Series Control Card and Node Provides background and reference material and procedures
Configuration Guide
for installation and configuration of control cards and node
configuration on Cisco NCS 2000 Series systems.
Cisco NCS 2000 Series Line Card Configuration Provides background and reference material and procedures
Guide
for installation and configuration of line cards on Cisco
NCS 2000 Series systems.
Cisco NCS 2000 Series Network Configuration Provides background and reference material, procedures
Guide
for turn up, provisioning, and maintenance of Cisco NCS
2000 Series systems.
Cisco NCS 2000 Series Troubleshooting Guide Provides general troubleshooting instructions, alarm troubleshooting instructions, and a list of error messages that apply to the Cisco NCS 2000 Series systems.
Release Notes for Cisco NCS 2000 Series
Provides information about new features and enhancements for the Cisco NCS 2000 Series systems.
Cisco NCS 2000 Series Hardware Installation Provides installation information of the Cisco NCS 2000
Guide
Series hardware.
Cisco NCS 2000 Series Licensing Configuration Provides information about installing and managing NCS
Guide
licenses.
Cisco NCS 2000 Series TL1 Command Guide Provides a comprehensive list of TL1 commands.
Installing the GBIC, SFP, SFP+, XFP, CXP, Provides information about the Pluggable Port Modules CFP, and CPAK Optical Modules in Cisco NCS support. Platforms
Technical Assistance
Link
Description
http://www.cisco.com/support The Cisco Support website provides extensive online resources, including documentation and tools for troubleshooting and resolving technical issues with Cisco products and technologies.
To receive security and technical information about your products, you can subscribe to various services, such as the Product Alert Tool (accessed from Field Notices), the Cisco Technical Services Newsletter, and Really Simple Syndication (RSS) Feeds.
Access to most tools on the Cisco Support website requires a Cisco.com user ID and password.
Communications, Services, and Additional Information
· To receive timely, relevant information from Cisco, sign up at Cisco Profile
Manager.
OL-25031-02
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 41
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco
NCS 2000 Series Communications, Services, and Additional Information
· To get the business impact you’re looking for with the technologies that
matter, visit Cisco Services. · To submit a service request, visit Cisco
Support. · To discover and browse secure, validated enterprise-class apps,
products, solutions and services, visit
Cisco Marketplace. · To obtain general networking, training, and certification
titles, visit Cisco Press. · To find warranty information for a specific
product or product family, access Cisco Warranty Finder.
Cisco Bug Search Tool Cisco Bug Search Tool (BST) is a web-based tool that
acts as a gateway to the Cisco bug tracking system that maintains a
comprehensive list of defects and vulnerabilities in Cisco products and
software. BST provides you with detailed defect information about your
products and software.
Upgrade, Add, and Remove Cards and Nodes, for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series 42
OL-25031-02
References
- Connect Dots
- Support - Cisco Support and Downloads – Documentation, Tools, Cases - Cisco
- Connect the PC and Log into the GUI for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series - Cisco
- Alarm and TCA Monitoring and Management for Cisco ONS 15454 DWDM and Cisco NCS 2000 Series - Cisco
- Manage the Node - Cisco
- Cisco NCS 2000 Series Hardware Installation Guide - Cisco
- Cisco Press: Source for Cisco Technology, CCNA, CCNP, CCIE Self-Study | Cisco Press
- Support - Cisco Support and Downloads – Documentation, Tools, Cases - Cisco
- Support - Bug Search Tool Help - Cisco
- CiscoprofileTestpage | Cisco
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>