Blubase 501 RoFast South User Manual
- June 14, 2024
- blubase
Table of Contents
Blubase 501 RoFast South
- OBSERVE THE APPLICABLE OCCUPATIONAL HEALTH AND SAFETY REGULATIONS AT ALL TIMES
- OUR ONLINE CALCULATOR IS A GUIDE FOR THE BALLAST PLAN
- START MOUNTING THE SYSTEM FROM THE REAR
PREPARATION
Required tools:
- Meeting
- Tape measure
- Installation batten
- Hex key, 5mm
- Socket wrench SW5
Always check that the flat roof can support the weight of the system (with ballast).
STEP 1
Start by setting out the field at right angles. Ensure that the system is
mounted from the rear.
STEP 2
Adjust the Blubase installation batten to match the solar panel you will be
using. The adjusted installation batten makes it easy to determine the
distance between the various underlying elements.
UNDERLYING ELEMENTS
STEP 3
Place two start profiles in the field with right angles. Use the underside of
the adjusted installation batten to determine the distance between the two
start profiles.
STEP 4
Fold the uprights up and click this one.
STEP 5
Once the start profiles have been placed into position, the intermediate
profiles can simply be rotated into the start profiles.
BALLAST FOR HOOK PROFILES
STEP 6
The ballast holders/trays are placed into the underlying elements. Once the
ballast holders/trays are in position, the ballast for the entire system can
be added. Our online calculator is a guide for the required amount of ballast.
SOLAR PANELS
STEP 7
Place the solar panels on the (extended) profiles of the underlying elements.
Position the panel in the middle, so that both sides are equal. Panels with a
width between 990mm and 1034mm are placed against the plastic lip. Panels with
a width between 1035mm and 1070mm fit against the aluminium bottom profile,
which pushes away the plastic lip.
STEP 8
Attach an end clamp to the ends.
Caution! The tightening torque of the screw connection is 9 Nm.
STEP 8.1
Hook in the universal clamp behind the lip on top of the hammer-head chamber
(see illustration).
STEP 8.2
Twist the clamp smoothly over the rail until it clicks into place on the other
side of the hammerhead chamber.
STEP 8.3
Check that the clamp is securely in place, as illustrated.
STEP 8.4
Slide the clamp towards the panel. The end clamp is positioned correctly if it
rests against both the panel and the profile of the underlying element.
STEP 9
Install an intermediate clamp in between the panels. Press the panels tightly
against the intermediate clamp. Caution! The tightening torque of the screw
connection is 9 Nm.
REAR PANELS
STEP 10
Turn the rear panels into the uprights from the bottom. Secure the rear panels
in place at two points with self-tapping screws.
SIDE PANELS (OPTIONAL)
STEP 11
The side panels are installed at six points with self-tapping screws. Caution!
Side panels are optional. Side panels are not included as standard.
DISCLAIMER
BLUBASE
-
This manual is a general guide (and is therefore not specific to one project) for the straightforward and efficient installation of solar panels using the Blubase mounting system. No rights may be derived from this manual.
-
For the installation of the Blubase fast mounting system, the buildings should have a height of
max. 12 metres. If the building is taller, please contact Blubase in advance for a project-specific, customized solution. -
If a flat roof is sloping more than four degrees, the Blubase roast mounting system must be
secured/anchored to prevent movement. -
An online calculation tool is available for the ballast calculation. Although this tool was developed in collaboration with the TNO Bouw research organization according to NEN 7250, the results should be used as a guideline only. Blubase does not supply any ballast material.
IMPORTANT
- Installing solar panels on an existing building will change its structural load and/or construction. We therefore recommend that the structural calculations for an existing building are updated by a specialist, taking into account the solar panels to be placed and current regulations such as NEN6702, NEN7250, NEN1991-1-4+A1+C2:2011/NB:2011, and NPR 6708:2013 in particular for wind, snow and water loads.
- The building insurer must be contacted in advance.
- The following building-related elements should be checked and approved in view of the existing structural arrangements:
- The additional weight load of the entire PV system that will be installed
- Geometry change of the roof surface
- Wind pressure, snow load, and water load, with simulation of accumulations
- The loads for the structure, roof coverings, and insulation during the installation
- The suitability of the roof covering and insulation (point pressure) at the contact points between the mounting system and the existing construction
- The consequences of the thermal interaction between the building and the PV system
- The consequences of any vibrations of the building and/or PV system
Blubase | Lingenstraat 9 | 8028 PM Zwolle, Nederland | T. (+31) 085-8000 501 | info@blubase.nl | www.blubase.com
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>