Kryakyn 4058 ERGO II/6 Arms With Lighted Floorboards Instruction Manual

June 13, 2024
Kryakyn

INSTALLATION
ERGO II/6” ARMS with LIGHTED FLOORBOARDS
4058

PARTS INCLUDED

1 Ergo II Upper Mount — Left Ergo 11 Upper Mount — Right Ergo II Lower Mounts Chrome Swing Arms Left Lighted Floorboard Right Lighted Floorboard Hardware Kit Induding:
2 Adjustable Stops for Ergo IT
2 1/2″-13 x 1-1/4″ Button Socket Cap Screw— Chrome
2 1/2″ Flat Washer—NOT USED
2 1/2” Wave Washer
8  1/4″-20 x 3/4″ Socket Head Cap Screw
4 3/8″-16 x 5/8” SSS Cup Point Setscrews
4 1/8″ x 5/16″ Roll Pins
Chrome Step Adapters — Top Hat
5/16″-18 x 1-1/2″ SHCS Fastener, Chrome 3/8″ Flat Washers, Zinc Anti-seize
Black Rubber Thread Plugs Installation Instructions
Please read and understand entire instructions before starting installation.
THANK YOU FOR CHOOSING KURYAKYN!
IN ORDER TO PROTECT YOU AND OTHERS FROM POSSIBLE INJURY AND/OR PROPERTY DAMAGE OR LOSS, PLEASE PAY CLOSE ATTENTION TO ALL INSTRUCTIONS, WARNINGS, CAUTIONS AND NOTICES REGARDING THE USE AND CARE OF THIS PRODUCT.
WARNING
THIS INDICATION ALERTS YOU TO THE FACT THAT IGNORING THE CONTENTS DESCRIBED HEREIN CAN RESULT IN POTENTIAL DEATH OR SERIOUS INJURY.
NOTICE
This indication alerts you to the fact that ignoring the contents described herein may negatively affect product performance and functionality.
NOTICE
IF INSTALLING THIS PRODUCT FOR ANOTHER PARTY, PLEASE MAKE SURE THEY RECEIVE THIS COPY OF THE INSTALLATION INSTRUCTIONS SO THEY ARE AWARE OF THE IMPORTANT INFORMATION CONTAINED IN THEM.

TOOLS SUGGESTED

Set of Hex Wrenches, Socket Set with Ratchet, Test Light, Wiring Supplies STRICTLY OBSERVE THE FOLLOWING GUIDELINES IN ORDER TO USE THE PRODUCT PROPERLY AND AVOID POTENTIALLY DANGEROUS ACCIDENTS.
STEP 1
Read and understand all steps in the instructions before starting the installation. Park the motorcydle on a hard, level surface and turn off the ignition. Let cool.
NOTE: Not all hardware will be used in this application.
WARNING
YOU WILL BE WORKING AROUND THE ENGINE AND EXHAUST SYSTEM _ DURING INSTALLATION. ENSURE THAT THE ENGINE ANGLE AND EXHAUST SYSTEM HAVE FULLY COOLED TO PREVENT INJURY.
NOTICE Use the supplied anti-seize for any chrome-to-chrome (211 (% 0 tastencrs; this will prevent galling and make future removal of fasteners ea:
INSTALLING CLAMP AND SWINGARM ASSEMBLY ON THE ENGINE GUARD
STEP 2
Locate the left mount; the mounts are side specific (PIC 1) so be sure you have the correct mount before attempting the installation. Visually inspect the angle where the swingarm will be attached. The mount should be angled slightly back, toward the rider, NOT forward.Kryakyn 4058 ERGO II 6 Arms
With Lighted Floorboards STEP 3
Remove the four 1/4”-20 fasteners securing the mount together and separate the upper and lower halves.
STEP 4
Insert the adjustable stop into the lower half of the mount. Thread two of the induded 3/8″-16 set screws into the bottom of the mount. PIC 2Kryakyn 4058
ERGO II 6 Arms With Lighted Floorboards - CLAMP Install the mount onto the engine guard. Loosely secure the mount with the four 1/4″-20 fasteners. Do not tighten at this time. PIC 2 Secure the swingarm to the cogged mount using the 1/2″-13 x 1-1/4” Button Socket Cap Screw and wave washer making sure the cogs on the swingarm line up with the cogs on the mount. The swingarm must be positioned level with or above the engine guard. FIG 1
WARNING
FOOTRESTS MUST BE INSTALLED SO THEY WILL FOLD UPWARD AND REARWARD IF HIT BY ANY OBJECT. FAILURE TO ADJUST THE FOOTRESTS TO OPERATE IN THIS MANNER COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 5
While pushing down lightly on the swingarm, adjust the two set screws (PIC 2) below the adjustable stop to fine tune the foot peg angle.
STEP 6
Tighten the four fasteners on the bottom of the clamp; pushing down lightly on the swingarm while tightening the fasteners to take up any slack between the mount and the engine.

INSTALL FLOORBOARD ASSEMBLY

STEP 7
Install a 5/16″-18 x 1-1/2″ fastener through the upper end of the swingarm; be sure to use a 3/8″ flat washer between the head of the fastener and the swingarm. The threaded end of the fastener must extend outward. PIC 3Kryakyn
4058 ERGO II 6 Arms With Lighted Floorboards - CLAMP 2 STEP 8
Insert two roll pins into the small holes of one of the Chrome Step Adapters; slide the adapter onto the end of the fastener on the swingarm. Be sure the holes on the outside of the step adapter are parallel to the ground when the roll pins engage with the holes on the outside of the swing arm. PIC 3
STEP 9
While holding the floorboard, align the pins on the floorboard with the holes on the Chrome Step Adapter, then loosely secure the 5/16” fastener from Step 7 to the floorboard, to hold the assembly together. DO NOT tighten the fastener at this time.
STEP 10
Repeat Steps 2 through 9 for the right side.
ADJUSTING THE POSITION OF SWINGARM AND LIGHTED FLOORBOARDS
STEP 11
Adjust for Longer or Shorter Inseam Lengths:

  • Loosen the 1/2″-13 Button Head Fastener securing the swingarm to the mount. Pull the swingarm out of the interlocking cogs.
  • Rotate the swingarm to the desired position then push the arm back into the interlocking cogs; be sure the swingarm is either level with the engine guard, or above the engine guard. NEVER position the swingarm below the engine guard! FIG 1 Retighten the 1/2″-13 fastener.Kryakyn 4058 ERGO II 6 Arms With Lighted Floorboards - SWINGARM

WARNING
IT IS THE INSTALLERS RESPONSIBILITY TO ENSURE THERE IS SUFFICIENT CORNERING CLEARANCE BEFORE RIDING. ALWAYS POSITION THE SWINGARM EITHER LEVEL WITH, OR ABOVE THE ENGINE GUARD. POSITIONING THE SWINGARM BELOW THE ENGINE GUARD WILL GREATLY DECREASE CORNERING CLEARANCE WHICH MAY CAUSE LOSS OF CONTROL RESULTING IN SERIOUS INJURY OR DEATH.
STEP 12
Adjust the Floorboard Angle:

  • Loosen the fastener securing the floorboard to the swing arm.
  • Pull the floorboard outward to disengage it from the roll pins; rotate the floorboard to the desired angle.
  • Tighten the fastener securely. Install the black thread plug in the swingarm. PIC 4Kryakyn 4058 ERGO II 6 Arms With Lighted Floorboards - SWINGARM 1

WIRING THE FLOORBOARDS:

STEP 13
Connect the black wire from the floorboard to either a chassis ground or the battery ground.
Using a test light, find a “keyed” power wire (a wire that gets power when the key is turned on and looses power when the key is turned off). Connect the red wire from the floorboard to this wire. Secure all excess wiring out of harms way. Turn on the bike and test all lights.
WARNING
NOTICE

ENSURE PROPER LIGHT OPERATION BEFORE RIDING THE MOTORCYCLE. VISIBILITY IS A MAJOR CONCERN FOR MOTORCYCLISTS. A LIGHTING MALFUNCTION COULD RESULT IN DEATH OR SERIOUS INJURY.
Sccure all wiring away from any moving parts, pinch points or extreme heat. Kiiryakyn WILL NOT issue a warranty on any electrical component that fails due to pinched, crimped, broken, abraded, melted or frayed wires.
NOTICE
Itis the installer’s responsibility to ensure that all of the fasteners (including pre-assembled) are tightened before operation of the motorcycle. Kiiryakyn will e warranty coverage on products or components lost due to improper n or lack of maintenance. Perio inspection and maintenance are required on all fasteners.

**CUSTOMER SERVICE

**

877.370.3604 (toll free)

INSTALLATION QUESTIONS

techsupport@kuryakyn.com  or call 715.247.2983

LIMITED WARRANTY

Kuryakyn warrants that any Kuryakyn products sold hereunder, shall be free of defects in materials and workmanship for a period of one (1) year from the date of purchase by the consumer excepting the following provisions:

  • Kuryakyn shall have no obligation in the event the customer is unable to provide a receipt showing the date the customer purchased the product(s).
  • The product must be properly installed, maintained and operated under normal conditions.
  • Kuryakyn makes no warranty, expressed or implied, with respect to any gold plated products.
  • KOryakyn shall not be liable for any consequential and incidental damages, including labor and paint, resulting from failure of a Kuryakyn product, failure to deliver, delay in delivery, delivery in nonconforming condition, or for any breech of contract or duty between KOryakyn and a customer.
  • Kuryakyn products are often intended for use in specific applications. Kuryakyn makes no warranty if a KOryakyn product is used in applications other than intended.
  • Kiiryakyn electrical products are warranted for one (1) year from the date of purchase by the consumer. L.E.D.’S contained in components of Kuryakyn products will be warranted for defects in materials and workmanship for 3 years from the date of purchase where as all other components shall be warranted for one(1) year. This includes, but is not limited to; control modules, wiring, chrome & other components.
  • Kuryakyn makes no warranty of any kind in regard to other manufacturerls products distributed by Kuryakyn. Kuryakyn will pass on all warranties made by the manufacturer and where possible, will expedite the claim on behalf of the customer, but ultimately, responsibility for disposition of the warranty claim lies with the manufacturer.

ABOUT OUR CATALOG

For purchasing Kuryakyn® products, you can receive a complete catalog free of charge. Send the Proof-of-Purchase below with your address to: Kiiryakyn, P.O. Box 339, Somerset, WI 54025. Please indicate either Accessories Catalog for Harley-Davidson® or GL & Metric Cruisers. Be sure to ask your local dealer about other KiiryakynC) products, the motorcycle parts and accessories designed for riders by riders.
©2005 Kuryakyn USA® All Rights reserved.

kuryakyn.com

Documents / Resources

| Kryakyn 4058 ERGO II/6 Arms With Lighted Floorboards [pdf] Instruction Manual
4058 ERGO II 6 Arms With Lighted Floorboards, 4058 ERGO II, 6 Arms With Lighted Floorboards, With Lighted Floorboards, Lighted Floorboards, Floorboards
---|---

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals