RUNFINE RFVA0198C Vitreous China Top Reversible Vanity Instruction Manual
- June 13, 2024
- RUNFINE
Table of Contents
RUNFINE RFVA0198C Vitreous China Top Reversible Vanity
Product Information
- Model: RFVA0198C/ RFVA0199C
- Product Name: Urbana Ensemble
Vanity Part List
- A
- B
- C
- D
- E
- F
- G
- H
Required Tools & Materials (not included)
- Silicone sealant
- Philips head screwdriver
Product Usage Instructions
- Step 1: Install legs (E) on vanity base (B) using screws (F) provided with Allen Wrench (H).
- Step 2: Install handle (C) on the door using screws (D) provided.
- Step 3: Install handle (C) on doors using screws (D) provided.
- Step 4: Allow silicone to dry for 24 hours before installing the faucet, drain assembly, and water supply lines.
Please refer to the corresponding page in the user manual for more detailed instructions and illustrations.
Inspect product prior to installation. Contact info@runfinegroups.com prior to returning product to retailer.
Vanity part list
Required Tools & materials (not included)
- A. Vitreous china vanity top
- B. Vanity base
- C. Handle
- D. Handle screws (22mm L)
- E. Vanity Legs
- F. Screws for legs (12mm L)
- G. Plastic anchors & screws
- H. Allen Wrench
Required Tools & materials
Floor Installation
- Install legs (E) on vanity base using screws (F) (provided) with Allen Wrench (H).
- Install Handle (C) on door using screws (D) provided.
Wall Mount Installation
Install Handle (C) on doors using screws (D) (Provided).
Locate a desired position on the wall on which to mount the cabinet.
If wall studs are located at the exact screw positions of the cabinet cross
bars, then mount the vanity to the wall using screws (G).
If the wall behind the cross bars is hollow, then drill through all four
mounting holes to mark hole positions on the wall.
Remove the vanity from the wall.
-
Drill holes through marked positions on the wall and insert plastic anchors (G) into the wall.
-
Place vanity back on the wall and drill screw s (G) through cross bar holes to secure the cabinet to the wall.
Vitreous china vanity top installation
The vanity top is reversible. Faucet can be installed on the right or left
side
- Apply silicone sealant onto the entire edge of the vanity and set vanity top in place.
- Wipe off any excess silicone sealant with a damp cloth and allow to dry.
- Try not to move or slide the top in any way while sealant is curing.
- Allow silicone to dry for 24 hours before installing faucet, drain assembly and water supply lines.
Care and Maintenance
Vanity to p should not be cleaned wit h abrasive cleaners. Mil d porcelain
cleaner s are recommended t o clean vanity top.
Note : Improper car e ma y void the warranty.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>