QwikPad QT8036 Air Conditioner Condenser Pad Instruction Manual
- June 13, 2024
- QwikPad
Table of Contents
QwikPad QT8036 Air Conditioner Condenser Pad
Product Information
The Wick Pad for Condensers is a pad designed for the installation of condenser units. It provides a stable and level surface for the equipment and includes tie-down assemblies for secure attachment. The pad is made in the USA and is built with stainless steel hardware for durability and longevity.
Installation Instructions
Pad size and anchoring methods should be chosen to meet wind loading requirements in your area. Visit www.qwik.com for the most up-to-date engineering documentation or to use our online pad selection tool.
-
Inspect Hardware Package Contents
Builds (4)Stainless Steel Tie-Down Assemblies
-
Locate the fill port cap (corner nearest the product label) and ensure it is securely pressed into pad and then tip the pad onto its corner where the plug is located. This process should shift the powdered gelling agent contained inside the pad towards the fill corner.
-
Place the Qlik Pad for Condensers on level, compacted ground where equipment is to be installed (or on top of existing, level concrete pad
-
Remove fill port cap. Insert garden hose into fill port and fill Qlik Pad for Condensers to the top with tap water.
Do not overfill – Overfilling may result in loss of a portion of the gelling agent.
Replace fill port cap.
-
(Required for some installations)
Install ground or concrete anchors as determined by your wind loading requirements.
Ground Anchor (QT8110) Installation
- Insert anchors into hole located on outer edge of pad.
- Using a 1” wrench, turn the anchor clockwise while pushing downward on top of the anchor.
- Continue driving anchor down until anchor head meets the pad. Do not over-tighten.
- When using ground anchors, install them on opposite sides (See example at right).
- NEVER INSTALL AN ANCHOR IN THE CENTER HOLE.
Concrete Anchor (QT8111) Installation
- With pad in place, drill four (4) holes in concrete to 1.375” minimum depth, centrally located in anchor holes using 3/16” masonry bit (included in QT8111). Center the drill bit in the anchor holes.
- Secure pad using four (4) 1/4” x 4” concrete anchors with fender washers.(included).
Place the equipment onto the Qlik Pad for Condensers and center.
Assemble four (4) condenser unit tie-down assemblies as shown below.
Insert tie-down assemblies into appropriate pad slots by angling bottom retaining washer as shown and dropping into slot
Tie-down assemblies must be located one (1) per each side of the unit or two (2) on two (2) opposing sides of the unit.
Slide tie-down assemblies inward toward unit until L-bracket meets up with unit. Tighten down flange nut on tie-down assembly to secure it to the Qlik Pad for Condensers.
Install two (2) self-tapping hex head screws through each tie-down assembly
into base of unit, securing the unit to the Qlik Pad for Condensers.
Here, the completed tie-down assemblies are shown in-place, attached with self-tapping hex head screws to the condenser unit, which is centered on the Qlik Pad for Condensers.
For more details or information about the Qlik Pad for Condensers visit www.qwik.com/qwikpad4cond/, emailinfo@qwik.com or call 1-321-631-3550
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>