GRUPEL DC.017-2 Deepsea Basic User Manual
- June 13, 2024
- GRUPEL
Table of Contents
- GRUPEL DC.017-2 Deepsea Basic
- Product Information
- Product Usage Instructions
- Maintenance
- WARNINGS
- INSTALATION
- STARTING UP
- DSE 3110 CONTROLLER
- DSE 4520 CONTROLLER
- DSE 7310 CONTROLLER
- DSE 7320 CONTROLLER
- DSE 7420 CONTROLLER
- DSE 8610 CONTROLLER
- DSE 8620 CONTROLLER
- ATS / QTC – AUTOMATIC TRANSFER SWITCH
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
GRUPEL DC.017-2 Deepsea Basic
Product Information
Product Model: DC.017-2
Product Code: I014-1
Language: English (EN)
Basic User Manual
Product Features:
- Control Panel: DSE 3110, DSE 4520, DSE 7310, DSE 7320, DSE 7420, DSE 8610, DSE 8620
- Operating Modes: Manual
- Remote Start Option
- Event Scheduling
- Network Failure Detection
- Emergency Stop Function
- Hot Parts Warning
Product Usage Instructions
Safety Precautions
Make sure to follow these safety precautions:
- Danger: Hot parts. Be cautious of hot surfaces.
- Warning: Fuel supply location.
- Danger: Risk of splashes from hot fluids.
Operating in Case of an Accident
If the generator is damaged during transport, note the damages in the
provided document. Verify if the product matches your order.
Do not swallow or allow skin to come into contact with fuel, oil, coolant,
lubricants or battery electrolyte.
If swallowed, seek medical treatment immediately. Do not induce vomiting if
fuel is swallowed. For skin contact, wash with soap and water. Call for health
care.
Do not expose a battery to fire or electric sparks. There is a risk of fire
and explosion.
Call for health care.
Battery electrolyte is corrosive. Protect eyes, skin and clothing when
handling batteries.
On skin: wash with plenty of water and soap;
In the eyes: wash immediately with plenty of water;
Call for health care.
Control Panel Functions – DSE Series
The generator can be operated using the control panel:
- DSE 3110: Manual mode for starting and stopping the generator.
- DSE 4520: Remote start option, event scheduling, and network failure detection.
- DSE 7310: Manual mode for starting and stopping the generator, remote start option, event scheduling, and network failure detection.
- DSE 7320: Manual mode for starting and stopping the generator, remote start option, event scheduling, and network failure detection.
- DSE 7420: Manual mode for starting and stopping the generator, remote start option, event scheduling, and network failure detection.
- DSE 8610: Manual mode for starting and stopping the generator, remote start option, event scheduling, and network failure detection.
- DSE 8620: Manual mode for starting and stopping the generator, remote start option, event scheduling, and network failure detection.
Maintenance
Refer to the product documentation for maintenance instructions. Visit
https://grupel.eu/pt/documentacao-tecnica/ for more information.
Maintenance operations may only be performed by properly trained and certified
technicians. Employee responsibilities for use and maintenance should be
defined by the owner of the facility or the user.
RECOMMENDED MAINTENANCE PLAN
Not complying with the brand procedures will incur in the immediate loss of
component and / or generator set warranty.
MAINTENANCE PLAN | MAINTENANCE TYPE |
---|---|
Daily | 50h |
(biennial)
250h*| 1000h
(yearly)
ENGINE| Check crankcase oil level.| | | | | |
Check the antifreeze level.| | | | | |
Check fuel level.| | | | | |
Check for leaks| | | | | |
Check battery charge and electrolyte level.| | | | | |
Check the integrity of all components attached to the engine.| | | | | |
Check the air filter clogging indicator.| | | | | |
Check belt condition.| | | | | |
Replace the oil filter(s).| | | | | |
Replace the fuel filter(s).| | | | | |
Check coolant condition.| | | | | |
Check condition of air filter.| | | | | |
Check the radiator cleaning status.| | | | | |
Replace crankcase oil.| | **| | | |
Replace the air filter (if necessary).| | | | | |
Replace antifreeze.| | | | | |
Check the condition of the injectors.| | | | | |
Check the condition of the turbocharger.| | | | | |
Check intake and exhaust valve clearances.| | | | | |
Check the condition of the battery charge alternator.| | | | | |
Check the condition of the sensors and the connection cables of the motor
sensors.| | | | | |
Check the battery terminals.| | | | | |
ALTERNADOR| Check cleaning conditions.| | | | | |
Check ground connection.| | | | | |
Check for vibrations.| | | | | |
Check the condition of the cooling fan.| | | | | |
Check coupling condition.| | | | | |
Check the condition of the shields, armatures and warning and safety lables.|
| | | | |
Check alternator output voltage values.| | | | | |
Inspect the condition of the alternator output terminals.| | | | | |
Inspect the condition of the AVR and AVR connections.| | | | | |
Inspect the condition of the anti-condensation resistance and check the
voltage power supply.| | | | | |
Check exciter stator continuity.| | | | | |
Check the insulation resistance of the alternator output terminals.| | | | | |
Check the insulation resistance of the rotor and stator windings.| | | | | |
example: 250h, 500h, 750h, 1250h, 1500h, 1750h, 2250h, 2500h, 2750h, etc.
to be carried only in the following brands: GRUPEL e MITSUBISHI.
Support
If you need assistance or have any questions, please contact our support
team. Before using the appliance for the first time, read this instruction
leaflet as well as the original instruction manual. Proceed accordingly. Save
all generator set documents for future use or for the next owner. Use this
generator set only for its intended purpose. Prolonged exposure to noise
levels above 80 dB is hazardous to hearing. Hearing protection should be used
when operating or working around a working genset.
Our technical support service will be pleased to provide any additional
information you may require. Please contact us:
complaints@grupel.eu / ( +351 ) 234 790 070
We are at your service to help you with your questions, technical issues and
improvements, or any other situation.
WARNINGS
ENVIRONMENTAL PROTECTION
- Improper waste disposal can be a threat to the environment.
- Dispose of packaging correctly while preserving the environment.
- Potentially hazardous fluids must be disposed of according to local regulations. Use always sealed containers when draining fluids. Do not spill debris on the floor, down the drain or into any water source.
- Segregation of fuels, oils, refrigerants, lubricants, electrolytes and batteries must be performed in accordance with applicable laws and regulations.
DELIVERY
Check condition of genset. In case of damage, record them on the document
presented by the carrier. Check if the product matches with your order.
INSTALATION
GRUPEL generator sets are designed for safe and efficient use. The generator set can be installed indoors or outdoors, always considering that the set must be protected from rain and dust. In the case of a stationary group, it should not be installed outdoors.
When installing a generator set the following precautions must be taken:
- Adequate ventilation;
- Enough distance to obstacles for proper cooling;
- Enough distance to obstacles to facilitate access to maintenance;
- Necessary and adequate protections;
- Presence of extinguisher abroad;
- Presence of extinguisher inside;
- Sandbox;
- Location forbidden to unauthorized persons.
Special care with:
- Concrete massif: massif will absorb some of the vibrations caused by the engine, so it should be sturdy enough to withstand its weight, as well as the forces that can be generated;
- Ventilation: adequate ventilation must be provided at the installation site to allow enough air inlet and outlet for proper cooling of the unit.
- Extraction gases, in pipeline directing gaseous effluents: it is important to channel the hot air from the radiator to the outside. Otherwise it may increase the air temperature around the group and cause it to stop due to lack of cooling;
- Grounding: this must be done in accordance with the regulations of the country of installation in order to avoid the appearance of voltages in the metal masses due to, among other possible causes, insulation defects.
MOVING AND STORAGE
If the generator is to be stored before to use, adequate facilities must be provided, free of dust and moisture, and the unit must be protected from chemical agents that could damage it or could damage any of its components. If storage is expected for more than five months, it is advisable to remove engine oil and filters until the equipment is used. Battery must be turn off.
STARTING UP
Before starting up a generator, check that:
- batteries are correctly connected
- earthing has been properly established
- all electrical connections have been made
- the installation of the group complies with the conditions established by the manufacturer and the legislation in force.
- oil levels are correct
- antifreeze levels are correct
- fill the fuel tank with at least 20%, but not more than 90%.
- start the generator in the controller for 1 minute at no load
- after 3 months without functioning: it is recommended to add an antibacterial product to the fuel
- after 6 months of non-operation: must proceed as defined by the engine manufacturer, regarding long-term storage.
DSE 3110 CONTROLLER
- Navigation key, serves to navigate information such as instrumentation values of the generator, network, etc
- Instrumentation and control screen
- Mode selection Off, allows the generator to stop and reset
- Auto Mode Selection, sets the group to auto mode
- On Mode selection, allows the generator to start
- Alarm Indicator
Operating mode – MANUAL
It is used to start and stop the group depending on the operator’s wishes. The
generator set stops and starts according to the orders issued by the operator.
To activate the generator set, press button 5. If:
- The symbol appears on the screen, the manual mode LED is flashing and the group does not starts, it means that the “Starts up is proteted”. To unlock, press button 5 again.
- To stop the generator set, press key 3, so the system stops immediately.
- To return to automatic mode, press button 4. The controller itself will check the status of start-up requests.
Operating mode – AUTOMATIC
The generator set starts due to external signal when the button 4 is pressed.
The symbol appears on the screen when this mode is active. At the time the
boot is requested, the machine begins its boot sequence. The group starts up
to its normal operating conditions. If after 5 seconds there is no fault
signal, the circuit breaker closes and the gensets loads. As soon as the start
requests disappear, the stop sequence begins. If all three attempts fail, the
genset starts its shutdown sequence.
DSE 4520 CONTROLLER
- Navigation key, serves to navigate information such as instrumentation values of the generator, network, etc
- Instrumentation and control screen
- Mode selection Off, allows the generator to stop
- Auto Mode Selection sets the group to auto mode
- On Mode selection, allows the generator to start
In this type of controller, the fuel alarm will appear as , without identifying the alarm type. In this case, the module detects that there is an auxiliary input, which has been configured by the user to create a fault condition, has become active.
Operating mode – MANUAL
It is used to start and stop the group depending on the operator’s wishes.
This mode of operation will be deactivated by pressing button 3, when you wish
to activate the group you must press button 5. If at this time the symbol is
displayed, the manual mode LED flashes and the group does not start. It means
that the “boot is protected”. To unlock, press key 5 again. A load request
will be required to transfer the load to the generator, ie mains failure, low
voltage battery operation, remote start or set up, thus by activating the
event scheduler. To stop the generator press key 3, so the system will stop
immediately. Another option is to press key 4 whereby the generator will
return to automatic mode and check the status of start-up requests.
Operating mode – AUTOMATIC
The generator will start due to external signal if the button 4 has been
previously pressed. The icon will be displayed on the screen when this mode is
activated. Automatic start may be for the following reasons:
At the time the boot is requested, the machine begins its boot sequence. The group starts up to its normal operating conditions. If after 5 seconds there is no fault signal, the circuit breaker closes and the group loads. As soon as the start requests disappear, the stop sequence begins.
DSE 7310 CONTROLLER
- Directional navigation keys are used to navigate between different menus regarding generator instrumentation values, grid, etc
- Instrumentation and control screen
- Opens generator circuit breaker (manual)
- Close the generator circuit breaker (manual), the generator assumes the load
- Off Mode Selection, allows generator stop
- Manual Mode Selection, allows manual start
- Auto Mode Selection puts the group into auto mode
- Silence Siren / Lamp Test silences the audible alarms and lights all LEDs as a test
- On Mode Selection, allows generator start
Operating mode – MANUAL
It is used to start and stop the group depending on the operator’s wishes.
This mode is activated by pressing button 6, however to start the start
sequence you have to press button 9. The load will not be transferred to the
generator until you press key 4, because only then is the generator circuit
breaker closed. To stop the generator will have to press key 5, then the
system will stop immediately.
Operating mode – AUTOMATIC
At the time the boot is requested, the machine begins its boot sequence. The
group starts up to its normal operating conditions. If after 5 seconds there
is no fault signal, the circuit breaker closes and the group load. This
operating mode is activated by pressing button 7.
DSE 7320 CONTROLLER
- Directional navigation keys are used to navigate between different menus regarding generator instrumentation values, grid, etc
- Instrumentation and control screen
- Load transfer to the network (Manual), in manual mode allows charging to the network
- Load transfer to generator (Manual), in manual mode allows the generator to be load.
- Off Mode Selection, allows the generator to stop
- Manual Mode Selection allows manual start
- Test Mode Selection enables activation of test mode
- Auto Mode Selection puts the group into auto mode
- Silence Siren / Lamp Test, silences audible alarms and lights all LEDs as a test
- Mode Selection On, allows generator start up
Operating mode – TEST
This mode of operation is activated by pressing button 7. A LED, next to the
button, confirms this action. To start the generator in test mode just press
button 10. At this moment it starts the start sequence, starts the group,
transferring the load to the generator. To stop the group you must press the
buttton 5; then the system will stop immediately.
Operating mode – MANUAL
It is used to start and stop the group depending on the operator’s wishes.
This mode is activated by pressing button 6, however to start the start
sequence you must press button 10. The load will not be transferred to the
generator until you press button 4. To restore the load to the mains supply,
press button 3 or 8 to return to automatic mode. To stop the generator will
have to press button 5, then the system will stop immediately.
Operating mode – AUTOMATIC
The generator starts due to external signal or voltage failure. The generator
set will be coupled to the load immediately after the start order. If after 5
seconds there is no fault signal from it, the group starts in its normal
operating condition. This operating mode is activated by pressing button 8.
DSE 7420 CONTROLLER
- Directional navigation keys are used to navigate between different menus regarding generator instrumentation values, grid, etc
- Instrumentation and control screen
- Load transfer to the network (Manual), in manual mode allows charging to the network
- Load transfer to generator (Manual), in manual mode allows generator loading
- Off Mode Selection, allows generator stop
- Manual Mode Selection, allows manual start
- Test Mode Selection, enables test mode activation
- Auto Mode Selection, puts the group into auto mode
- Silence Siren / Lamp Test, silences audible alarms and lights all LEDs as a test
- Mode Selection On, allows generator start up
Operating mode – TEST
This mode of operation is activated by pressing button 7. A LED beside the
button confirms this action. To start the generator in test mode just press
button 10. At this moment it starts the start sequence, starts the group,
transferring the load to the generator. To stop the group you must press 5,
then the system will stop immediately.
Operating mode – MANUAL
It is used to start and stop the group depending on the operator’s wishes.
This mode is activated by pressing button 6, a LED next to the button confirms
this action, however to start the start sequence you must press button 10. A
load request will be required for the load to be transferred to the generator,
that is, by pressing button 4, by out-of-range mains voltage, by remote start
or by being configured in this way, by activating the event scheduler. To
restore the load to the mains supply, press button 3 or 8 to return to
automatic mode. To stop the generator will have to press button 5, then the
system will stop immediately.
Operating mode – AUTOMATIC
The generator starts due to external signal or voltage failure. The group
starts up to its normal operating conditions. If after 5 seconds there is no
fault signal, the circuit breaker closes and the group load. This operating
mode is activated by pressing button 8.
DSE 8610 CONTROLLER
- Directional navigation keys are used to navigate between different menus regarding generator instrumentation values, grid, etc
- Instrumentation and control screen
- Opens generator circuit breaker (manual)
- Close the generator circuit breaker (manual), the generator assumes the load
- Off Mode Selection, allows the generator to stop
- Manual Mode Selection, allows manual start
- Auto Mode Selection puts the group into auto mode
- Silence Siren / Lamp Test, silences audible alarms and lights all LEDs as a test
- Mode Selection On, allows generator start up
Operating mode – MANUAL
Used to start and stop the group at the operator’s discretion. This mode is
activated by pressing button 6, however, to start the start sequence it is
necessary to press button 9. The load will not be transferred to the generator
until button 4 is pressed, because only then is the circuit breaker closed of
the generator. If there is no voltage, the group circuit breaker will be
switched off. If on the contrary there is voltage, synchronization will occur
first and then the group circuit breaker will be turned off. To stop the
generator will have to press button 5, this way the system will stop
immediately. If you press button 7, the group will check the start requests
and start the automatic mode stop sequence.
Operating mode – AUTOMATIC
Activate automatic mode by pressing button 7. A LED indicator next to the
button will confirm this action. Automatic mode will allow the generator to
operate fully automatic, starting and stopping when necessary without user
intervention. If there is a boot request the group will start the boot
sequence. Stabilizing previously upon taking charge. At the moment the start
request ceases, the stop sequence begins after a predetermined time, the
breaker opens. It then starts cooling and then stopping the group.
DSE 8620 CONTROLLER
- Directional navigation keys are used to navigate between different menus regarding generator instrumentation values, grid, etc
- Instrumentation and control screen
- Load transfer to the network (Manual), in manual mode allows charging over
- Load transfer to generator (Manual), in manual mode allows generator loading
- Off Mode Selection, allows generator stop
- Manual Mode Selection, allows manual start
- Test Mode Selection, enables test mode activation
- Auto Mode Selection, puts the group into auto mode
- Silence Siren / Lamp Test, silences audible alarms and lights all LEDs as a test
- On Mode Selection, allows generator start up
Using the directional keys, we can navigate between the different menus
concern- ing generator instrumentation values, grid… etc.
The buttons allow us to change between the different parameters within the
same menu. The STOP/RESET button – key 5, allows the generator to be stopped
(start in OFF mode) as well as to reset the alarms whose cause has been
solved. If we press this button when the equipment is running, the generator
will discharge, open the circuit breaker and stop. If while in this mode, the
computer receives a boot command either locally or remotely, the machine will
not start. Key 6 allows the use of manual mode, allowing local start – key 10.
As soon as it starts, it also allows the generator to be loaded – key 4, if
the grid is present, the generator will synchronize with the grid, assume the
load and will open the network breaker. If the generator is idle and there is
no network present, it will turn off the circuit breaker without
synchronizing. With load group, the push – button 3, allows charging the
network. Pressing button 3 the generator will synchronize with the network, to
pass the load to the network, and open the group circuit breaker.
Operating mode – TEST
This mode is used to enable fault diagnosis. This operating mode is activated
by pressing button 7. A LED light next to the button will confirm this action.
To start the generator in test mode just press button 10. At this point, the
starting sequence begins and the genset starts. The generator will synchronize
with the mains, and the group breaker will close. The load will be assumed by
the group from the network up to the predefined level. If the module has an
island start remote start, the group will synchronize with the network and
will assume the load from the network to the group. The network breaker will
receive an opening order. To stop the group will have to press button 5, then
the system will stop immediately.
Operating mode – MANUAL
This mode is activated by pressing button 6, however, to start the start
sequence, it is necessary to press button 10. The load will not be transferred
to the generator until the mains supply fails, a remote start signal is used
or press button 4. If any of these events occur, the group will be
synchronized and in parallel with the network supply.
Operation Mode – IN PARALLEL
If you press button 4 again while the group is in parallel, the load will be
transferred from the network to the group. The network breaker will open. By
pressing button 3 the network and the group will resynchronize, returning to
parallel mode. Pressing button 3 while the group is in parallel will transfer
the load to the grid. If automatic mode is selected and the network supply is
adequate, and no start request is activated, the automatic shutdown sequence
will start.
Operating mode – AUTOMATIC
Activate automatic mode by pressing button 8. A LED indicator next to the
button will confirm this action. Automatic mode will allow the generator to
operate fully automatic, starting and stopping if necessary without user
intervention.
Remote start in ISLAND MODE
It is used to start the generator with the external start order. As soon as
the group starts, a set time elapses allowing the motor to stabilize before
accepting the load. The generator synchronizes with the grid before closing
the group breaker, and will transfer the load from the grid to the generator.
After a while, the generator will take over and give the grid an opening
order. When the start request ceases, the generator synchronizes with the
grid, and closes the grid breaker. Load shedding begins for the network. Opens
the group breaker and the stop sequence will start.
Remote start on LOAD
Used to start the generator in response to falling load levels in the mains
supply. When the load level on the network exceeds the pre-selected level, the
module begins the boot sequence. First, the group will synchronize with the
network and the group breaker will be ordered to close. The generator will
assume the load together with the grid. When the starting conditions cease,
the stop sequence begins, the generator shuts down the load and opens the
group breaker. Starts the cooling time, after which it stops.
ATS / QTC – AUTOMATIC TRANSFER SWITCH
There are two types of Automatic transfer Switch (ATS):
ATS IN – located inside the generator’s electrical panel
ATS OUT – located outside the generator
In the genset controller panel you can find:
- Source 1 (network);
- Consumer (item to be loaded);
- Source 2 (generator);
- Power ON / OFF Switch;
- LED access: ATS energized;
- LED access: Generator will be / is activated;
- LED access: Automatic mode triggered;
- LED access: Manual mode triggered;
- Button for setting Automatic or Manual mode.
If you have requested an ATS/QTC OUT, you must make the respective electrical power connections:
- Mains input cables for order of color: blue (neutral), grey (Phase 1), black (Phase 2) and brown (Phase 3);
- Output cables for the load, obeying the color order of the input.
TECHNICAL DOCUMENTATION / MANUALS
To consult the available documentation of the generator, flash the code
opposite using a compatible smartphone or go to the web address:
https://grupel.eu/en/technical-documentation/
We reserve the right to modify the characteristics of this product at any
time, in order to incorporate the latest technological developments. The
information contained in this document may therefore be changed without
notice. This document may not be reproduced in any form without prior
authorization.
References
- GRUPEL | Conception, production and selling of diesel and gas generators
- Technical Documentation - GRUPEL
- Documentação Técnica - GRUPEL
- Documentation technique - GRUPEL
- Documentação Técnica - GRUPEL
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>