better bathrooms BeBa 25861 Wall Hung Toilet User Manual
- October 30, 2023
- Better Bathrooms
Table of Contents
BeBa 25861 Wall Hung Toilet
Product Information
The product is a toilet installation frame and cistern with a
pan connector for fitting onto the toilet pan. The package includes
2 plastic straws, protective covers for the flush plate housing,
flush pipe, and pan connector, and threaded bars for fixing the
toilet.
Dimensions
The dimensions of the product are not specified in the
manual.
Parts
The parts included in the package are: toilet installation
frame, cistern, pan connector, 2 plastic straws, protective covers
for the flush plate housing, flush pipe, and pan connector, and
threaded bars for fixing the toilet.
Tools Required
The tools required for installation are not specified in the
manual.
Product Usage Instructions
Fitting Pan Connector
If using a straight connector through the wall, you can position
it as required. Each option will give you the minimum dimension
from the wall to the front of the fixing foot. The desired location
should be checked before drilling to ensure that no pipes or wires
can be damaged. To install the pan connector:
-
Position the connector into the frame clip in the position
shown in the manual. -
Close the clip to secure the connector.
-
Using the plastic straw, secure the grub screw into the plastic
housing. -
Using the Allen key, secure the grub screw into the cut-out on
the connector to secure the toilet pan onto the frame.
Adjusting Frame Height
The height of the frame can be adjusted as required along with
the depth of the frame from the wall:
-
Loosen the nuts and bolts in the fixing brackets and adjust as
required. -
Check the frame is level and then tighten the nuts and
bolts. -
Once the frame is set to the required height and depth, mark
the drill holes on the wall and on the floor. -
Drill the holes using a 10mm drill bit. It is recommended to
place tape over the drill mark if you are drilling into tiles to
prevent any slippage. -
If fixing to a solid wall and floor, push the wall plug into
the hole. -
Secure the wall bracket to the wall and then position the frame
into the required location. -
Tighten the frame to the wall bracket and tighten the nut and
bolt. -
Secure the foot into position using the screws provided.
Fitting Protective Covers
To fit the protective covers:
-
Fit the flush plate fixing bracket, then fit the flush plate
fitting box. Please note: The Flush Plate is sold separately. -
Push on the flush pipe and pan connector covers.
-
Screw the threaded bars into the frame, ensuring these are in
the correct hole to match the holes in the toilet, then push on the
sleeves.
Water Connection
To make the connection between the water supply and the cistern
tank:
- Use a suitable sealing method as shown in the manual.
Note: Whenever possible and when safe to do so, carry out leak
tests during the installation process.
V3_12.10.21
E. 2xPlastic straw
7.Using the Plastic straw secure the grub screw into the plastic housing then using the Allen key to secure the grub screw into the cut out on the connector to secure the toilet pan onto the frame.
V3_12.10.21
Wall Frame and Cistern BeBa_25877
· For installation with Flush Plates – BeBa_26132 / BeBa_25874 / BeBa_25876
(sold separately)
· Toilet pan sold separately
Please note: Image is for illustrative purposes only and may differ slightly
to the actual product
· Multi-person assembly · Tools required · We always recommend using
professional
tradespeople to install your product
V1 30.4.20
Congratulations on your purchase
And welcome to our growing gang of savvy shoppers We’re on a mission to bring
you extraordinary bathroom products, for less. From modern to traditional
style ceramics, plus the gorgeous fixtures, fittings and furniture to match.
So, you can fall in love with your space every single day. As one of the UK’s
largest independent bathroom stores, we’ve received countless awards;
including the National Business Awards UK, the Digital Entrepreneur Awards and
being placed on The Sunday Times Fast Track 100. We hope your new product
exceeds your highest expectations. However, if you experience any problems,
please:
· call our friendly UK call centre on 0871 244 0935 (9am-7pm Monday to Friday,
or 10am-4pm Saturday and Sunday), or
· send us a message via customerservices@buyitdirect.co.uk
Important information
· Please read these instructions thoroughly and retain for future reference. ·
Manufactured to BS EN14055 WC and urinal cisterns. · All installation work
must be carried out to comply with the Water Bylaw
Regulations. · The installation should be designed to allow access for
maintenance.
2
Contents
· Dimensions · Parts · Tools required · Installation
o Fitting Pan connector o Adjusting Frame Height o Securing the Frame o
Fitting Protective Covers o Water Connection o Installation once wall is
constructed o Connecting and Hanging the Toilet · Troubleshooting ·
Maintenance
4 5-6 6
7 8 9 10 11 12-15 16 17 18-19
3
Dimensions
4
Parts
1. Square inlet fixing plate Pre-fitted 2. Tank 3. Frame 4. Wall fixing
brackets and screws 5. Flush pipe and bung 6. Pan connector and seals 7.
Adjustable foot 8. Adjustable floor foot fixing screw and plug 9. Toilet
fixings 10. Flush pipe protector, use during installation 11. Pan connector
protector, use during installation 12. Fixing bar sleeves, use during
installation 1 13. Pan connector clip 14. Stop Valve Pre-fitted
5
15. Inlet flexi-pipe Pre-fitted 16. Inlet valve 17. Flush plate bracket 18.
Flush pipe vertical 19. Syphon 20. Flush rod locating plate 21. Flush plate
protective cover 22. Flush plate fixing rods 23. Flush plate housing 24. Flush
plate housing/rod clips 25. Flush rods 26. Flush plate
Tools required
· Screwdriver · Spanner · Pencil · Drill · Sprit Level · 10mm Drill Bit ·
Hacksaw
6
Installation
Please note: Whenever possible and when safe to do so, it is recommended to
carry out leak tests during the installation process Fitting Pan Connector If
using a straight connector through the wall, you can position as required.
Each option below will give you the minimum dimension from the wall to the
front of the fixing foot. Please note: The desired location should be checked
before drilling, that no pipes or wires can be damaged
Option 1: Pan connector to be installed into the floor Position the connector
into the frame clip in the position shown below left, located in the rear
recess, then close the clip.
Option 2: Pan connector to be installed to the side Position the connector
into the frame clip in the position shown below left, located in the front
recess, then close the clip.
7
Below show the fixing width dimensions for the wall and floor screws, and the
distance from the centre of the pan connector.
Adjusting Frame Height Once the pan connector is in place, the height of the
frame can be adjusted as required along with the depth of the frame from the
wall.
1. To do this loosen the nuts and bolts in the fixing brackets and adjust as
required. 2. Check the frame is level and then tighten the nuts and bolts. 3.
Once the frame is set to the required height and depth, mark the drill holes
on the
wall, and on the floor. Now you’re ready to secure the frame.
8
Securing the Frame 1. Drill the holes using a 10mm drill bit; it is
recommended to place tape over the drill mark if you are drilling into tiles
to prevent any slippage. 2. Once drilled, if fixing to a solid wall and floor,
push the wall plug into the hole. 3. Secure the wall bracket to the wall and
then position the frame into the required location. 4. Tighten the frame to
the wall bracket and tighten the nut and bolt. 5. Secure the foot into
position using the screws provided.
9
Fitting Protective Covers Before building the wall, and tiling around the
frame, the protective covers need to be fitted to the flush plate housing,
flush pipe and pan connector and the fixing bars fixed into place.
1. Fit the flush plate fixing bracket (as below), then fit the flush plate
fitting box. Please note: The Flush Plate is sold separately
2. Push on the flush pipe and pan connector covers. 3. Screw the threaded
bars into the frame, as below, ensuring these are in the correct
hole to match the holes in the toilet, then push on the sleeves.
10
Water Connection 1. Make the connection between the water supply and the
cistern tank, using a suitable sealing method as shown below.
Please note: The cistern has its own built in stop valve 2. Once water is
connected you’re ready to build the partition wall. Use the guidance below and
construct as required then tile as required.
11
Installation once wall is constructed 1. Once the wall is constructed and
tiled to the required depth, cut the flush plate box to the finished wall
surface. 2. Insert the fixing rods into the holes within the frame flush box
and twist to secure.
3. Secure the flush plate bracket to the fixing rods and secure using the
screws provided.
4. Push the flush rods into the housing as shown below.
12
5. Once the rods are fully inserted, secure into position using the clips
shown below, then push the rods to ensure free movement is achieved.
6. Attach the flush plate and click into position.
13
7. Remove the pan connector and flush pipe protective covers. 8. Push the
straight pan connector, flush pipe and remaining parts into the holes in
the frame. 9. Mark a line at the finished wall surface.
10. Remove from the frame and connect them to the flush hole and waste spigot
on the rear of the toilet pan (Apply a small amount of washing up liquid to
assist).
14
11. Once fully connected, mark the measurements and cut as shown below. 12.
Prepare the flush pipe and pan connector ends removing any rough edges and
create a small chamfer.
15
Connecting and Hanging the Toilet 1. Push the pan connector into the frame
then push the flush pipe into the toilet 2. Remove the threaded bar sleeves.
3. Unscrew the threaded bars, so they extend by dimension A depth of the
toilet wall + 25mm.
Please note: You will require two people for this section of the installation
4. Lift the toilet pan onto the threaded bars. 5. Finally, check that the
toilet is level, connect the fixings in the order shown below and tighten
until the toilet pan is secured.
Please note: Once installation is completed a full commissioning of the
product should be carried out to check the installation is safe and stable,
check for leaks and check function
16
Troubleshooting
Cistern tank not filling at all or to the required level 1. Check the water
supply has been turned back on and is reaching the cistern. 2. Adjust the fill
level on the cistern as required. 3. The filter on the inlet valve could be
blocked. 4. If none of these resolve the issue replace the inlet valve.
Flush volume into the pan, not sufficient 1. Adjust the flush volume level on
the syphon. 2. Check that the syphon is opening correctly. 3. Check that the
tubes are connected to the correct inlet on the flush plate. 4. If none of
these resolve the issue replace the syphon.
Water running into the pan continually after flushing 1. Establish if the
water level in the cistern is reaching the overflow on the syphon, if it does,
adjust the inlet valve. 2. If this continues, replace the inlet valve. 3. If
the water level does not reach the overflow on the syphon, remove the top
section of the syphon and check the washer for damage. 4. If damaged replace.
17
Maintenance
The maintenance measures below require you to gain access to the internals of
the cistern tank, and for the water supply to be turned off.
· Once you have gained access, turn the adjustment screw in the required
direction to adjust the tank fill volume.
· If you need to replace the inlet valve, disconnect the water supply pipe and
remove the retaining nut, which holds the inlet valve to the tank and pull the
inlet valve from the tank.
· To clear the filter, unscrew the filter section from the inlet valve as
shown and run under warm water using a brush to clean away any blockage.
18
· It is recommended to remove the pneumatic tubes from the syphon to carry out
maintenance.
· To do this, pull each tube from the inlet on the top of the syphon, do not
allow these to drop back into the tank.
· To remove the syphon, you will only need to remove the top section, which
requires you to twist and lift.
· To adjust the flush volume, move the slider as shown below. · To remove the
washer, turn the syphon upside down and the washer from the
housing.
19
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>