next green 27 001 76 HD 60 Ceiling and Floor Mount Instruction Manual

June 9, 2024
next green

27 001 76 HD 60 Ceiling and Floor Mount
Instruction Manual

Assembly instructions

For mounting steel tubes to the ceiling or floor.
Included for installation:

  • 1 x bracket
  • 2 x U-bolt M8
  • 4 x nut M8
  • 4 x washer M8

Mounting the attachment plate
The bracket is mounted on the floor or ceiling using at least four (4) suitably sized expander screws or equivalent. The inner holes are used as spares if reinforcement or similar hinders drilling holes in the concrete. Pole pipe mounting
Cut the steel tube to desired length. The steel tube is clamped onto the mounting plate using the supplied U-bolts.
Leave space towards the ceiling/floor for running cables through the pipe. Begin wiring or prepare for the safety screw.

Safety screw

If necessary, a safety screw can be fitted. This should be done before wiring, to avoid damaging the cables. Drill a hole (6.5-9mm) through the pipe at the safety screw hole on the mounting plate. When the cable routing is completed, screw in a suitable screw. Safety screw not included.

Next Green AB
Brudtallsvagen 14 SE-792 32 MORA SWEDEN
www.nextgreen.se
info@nextgreen.se
Tel: +46 250 50 39 90

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals