hoymiles HM-800 Series 2 to 1 Micro Inverter Installation Guide
- June 4, 2024
- hoymiles
Table of Contents
HM-800 Series Quick Installation Guide
*Applicable to HM-600/700/800 microinverters
Installation Guide
Accessories
Item | Description |
---|---|
A | AC End Cable (Female), 2 m 12 AWG Cable |
B | M8 × 25 Screws |
C | DC Extension Cable, 1 m |
D | AC Female End Cap, IP67 |
*Note: All accessories listed above are not included in the package, and need to be purchased separately. Please contact our sales representative for pricing information. (M8 screws need to be prepared by the installer.)
Installation Steps
Ensure the microinverter is installed in the required environment. (Refer to the product user manual for more details.)
Step 1. Attach Microinverter on Rail
A) Mark the approximate center of each panel on the frame.
B) Fix the screw on the rail.
C) Hang the microinverter on the screw (as shown in the picture), and tighten
the screw. The silver cover side of the microinverter should be facing the
panel.
*Note: Please install the microinverter at least 50 cm above the ground/roof for better communication with the Hoymiles DTU.
Step 2. Connect AC Cables of Microinverter
A) Plug the AC connector of the first microinverter into the connector of the second microinverter to form a continuous AC branch *circuit. Note:** The length of the AC cable on the microinverter is around 2.04 m. Use AC extension cable if two microinverters are more than 2.04 m apart. B) Install the AC end cap on the open AC connector of the last microinverter in the AC branch circuit.
Step 3. Connect AC End Cable
A) Make the AC end cable.
-
Separate the AC port into 3 parts.
-
Insert the AC cable through Part 3 into Part 2, and complete the wiring for the L, N, and Ground inside the AC port in Part *1. Note:** L: Brown wire
N: Blue wire
G: Yellow/Green wire
Please use a 12 AWG cable as the AC end cable. -
Plug the AC port Part 2 into Part 1 once the wiring is complete, and then screw on Part 3 to complete the AC extension cable. B) Connect the AC end cable to the AC male connector of the first microinverter to complete the circuit. C) Connect the other side of the AC end cable to the distribution box, and wire it to the local grid network.
Step 4. Create an Installation Map
A) Peel the removable serial number label from each microinverter (the
position of the label is shown below).
B) Affix the serial number label to the respective location on the
installation map.
Step 5. Connect PV Modules
A) Mount the PV modules above the microinverter.
B) Connect the PV modules’ DC cables to the DC input side of the
microinverter.
Step 6. Energize the System
A) Turn on the AC breaker of the branch circuit.
B) Turn on the main AC breaker of the house.
Your system will start to generate power in about two minutes.
Step 7. Set Up the Monitoring System
Refer to the DTU User Manual, DTU Quick Installation Guide, and Quick
Installation Guide for S-Miles Cloud to install the DTU and set up your
monitoring system.
Product information is subject to change without notice.
(Please download reference manuals at
www.hoymiles.com.)
Region: Global AP040209 REV1.4
© 2022 Hoymiles Power Electronics Inc. All rights reserved.
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>