Unity Lab Services Controlled Rate Freezer TSCM Battery Replacement Instructions
- June 9, 2024
- Unity Lab Services
Table of Contents
Unity Lab Services Controlled Rate Freezer TSCM Battery Replacement
Installation Instructions
TSCM Battery Replacement
Revision Date : August 5, 2021
Controlled Rate Freezer TSCM Battery Replacement
- Login to touchscreen. Turn unit off by pressing power button & message will pop up confirming shut down command. After screen processes power off command flip rocker switch on right side of unit and unplug from wall.
- Remove screws on right side wall panel to gain access to internal deck
- Remove side panel and battery is located on right side. Typically, the battery color is grey & blue or black.
- Disconnect red and black wires from battery terminals
- Remove battery bracket nut. Slide battery bracket towards the front of the unit and lift to remove. Remove old battery and replace with new one.
- Complete Reverse order after new battery is installed.
Note : Ensure to connect wires correctly to battery terminals: Red (+) wire to red positive terminal & black (-) wire to negative black terminal
www.unitylabservices.com/contactus
References
Read User Manual Online (PDF format)
Loading......