VINTAGE INDUSTRIAL SDH-SW5IND-BLK Classic Top Mount Installation Guide
- June 8, 2024
- VINTAGE INDUSTRIAL
Table of Contents
VINTAGE INDUSTRIAL SDH-SW5IND-BLK Classic Top Mount
MODEL No. SDH-SW5IND- BLK
TOOLS REQUIRED
- Plumb Line
- Pencil
- Phillips Head Screwdriver
- 5.5mm Drill Bit
- 8mm Drill Bit
- Wrench
- Level
- Tape Measure
- Power Drill
INCLUDED IN KIT
A
| Door Roller Hardware| x2
---|---|---
B
| 78″ Rail| x1
C
| Door Stop| x2
D
| M8x30 Wall Anchor| x5
E
| M8x60 Bolt + Washer| x5
F
| M8x90 Bolt| x4
G
| Anti-Jump Disk + Mounting Screw| x2
H
| Wall Bracket| x5
I
| Routed Floor Guide| x1
J
| Floor Anchor| x2
K
| ST4.2×35 Screw| x2
L
| 2.5mm Allen Key| x1
DIMENSION
NOTES
Minimum door overlap on guide is 2″
To obtain maximum weight capacity, all fasteners must be mounted into solid wood studs or wall blocking or mounted to a header board.
Consult a structural engineer if you have questions about what type of wall blocking is required.
INSTALLATION INSTRUCTIONS
-
Find the centerline of the track. Using a level, mark a horizontal line twice the door width long. Mark the bracket screw locations into the wall blocking. Attach the wall portion of the brackets as shown.
-
Attach the rail to the wall brackets using a wrench to fasten the bolts as shown.
-
Drill holes in the top of the door 5-1/4″ from the edge as pictured to accommodate the door rollers. The bottom of the door should be routed at this time in order to accept the floor guide.
-
Attach the anti-jump disks to the tops of the door.
-
Attach the door to the rails making sure that the anti-jump disks are engaged to avoid a serious accident.
-
Plumb the door and mark the positions of the floor guides. Mount the floor guides to the floor.
-
Adjust the door stops accordingly using the provided 2.5mm Allen key.
Architectural Products by Outwater assumes no liability for improper installation.