GIBRALTAR 11419 Galvanized Eave Drip Flashing Installation Guide
- June 9, 2024
- Gibraltar
Table of Contents
GIBRALTAR 11419 Galvanized Eave Drip Flashing
Instruction
Begin installation along the eaves, starting comer and working your way around, overlapping each succeeding plece of drip edge by 2-3 inches. After the eave drip edge has been installed, apply the underlayment and/or ice-water barmier Once the underlayment has been installed, apply the drip edge to the rakes. Make box corners by wrapping the rake edge around the eave metal Depending on local building codes and wind conditions, roof edge should be named every 4 in. – 24 in.
CAUTION! Working above grade is inherently dangerous, be sure that proper fall protection measures are in place When working with power tools and sheet an eye protection are absolutely required.
Read User Manual Online (PDF format)
Loading......