EVOCA GROUP G150 Fully Automatic Machines Installation Guide

September 19, 2024
EVOCA GROUP

G150
INSTALLATION SITE
**PREPARATION CHECKLIST

**

GENERAL MACHINE ENVIRONMENT

  • The installation area is clean and clear of dust and tools. It is not located in an active construction zone.
  • The counter accommodates the machine size and weight:
  • Dimensions: 14.5” (W) x 31” (H) x 23.1’’ (D)
  •  Dimensions with NSF/ANSI 4 legs: 14.5 (W) x 33.6 (H) x 23.1 in (D)
  • Weight: 104 lb
  • An access hole has been pre-drilled in the counter for drainage and power in accordance with model installation template
  • Hole in counter is fitted with a collar to protect electrical cord, water line & drain tube.
  • Machine can safely be installed with a minimum clearance of 1 5/8 inch from the back wall.

ELECTRICAL REQUIREMENTS

G150 Specifications| 120/240 V, 60 Hz, 3690 W
NEMA L14-30 Plug
---|---

  • Power outlet receptacle is NEMA L14-30R.
  • Dedicated electrical circuit meets the G150 power requirements.
  • No extension cord or power strip on the circuit.

WATER SPECIFICATIONS

The water configuration must match the G150 Site Preparation Checklist’s water specifications, prior to request the installation of the coffee machine. To do so, we recommend that you consult a water filtration system specialist.

Pressure & Hardness

  • Pressure is between 21.7 PSI and 123.28 PSI.
  • pH range is between 6.5 and 7.5.
  •  Hardness (TDS) is between 89 PPM and 142 PPM.
  •  Machine water line is equipped with softness/filtration system and descaling device.

Water Network

  •  The water network provides cold, drinkable tap water.
  •  Dedicated 3/8” diameter water line.
  • Shutoff valve with a 3/8” compression fitting on machine’s end.

HIGHLY RECOMMENDED: Connection to a floor drain in accordance with local health code.

SITE INFORMATION

Adress:………….
Business name:……….
Contact phone number:………….
Contact name:………………
Contact email:………………

UNIT INFORMATION

Machine Model:……….
Serial Number If available :…………………
I hereby confirm that:

  • (initiales) I received and carefully read the Site Preparation Check-List that matches the model we are installing
  • (initiales) The installation site is compliant with all the requirements listed in the Site Preparation Check-List I received
  • (initiales) The installation can now be scheduled with our service provider
  • (initiales) We will have on site all the products required to fill and test the unit when the installation technician will arrive at installation site

Agreement

By signing and sending this form properly completed to Evoca North America at technical.na@evocagroup.com
I agree to the following terms.
I send this form completed as a confirmation that the installation site is compliant with the requirements of the model listed above. This is the official request to schedule the installation.
I acknowledge that my company will be charged if the installation site is not compliant with all the Site Preparation Check-List requirements and a second installation appointment is needed.
I acknowledge that Evoca North America does not recommend a specific water filtration system.
An installer will contact you after this form is received properly completed.

Signature:……..
Date:……….
Title:……….

Evoca North America
2355, avenue Dalton, Québec (Québec) G1P 3S3, Canada
T: 800-561-6162 – F: 800-463-2739
www.evocagroupna.com| Evoca Group Headquarters
Via Roma, 24, 24030 Valbrembo BG Italy
T: +39 035606111 – F: +39 095606560
www.evocagroup.com
---|---

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals