Sur Mountor AS-ND24D-A Neon Tube Light Instruction Manual

June 2, 2024
Sur Mountor

Sur Mountor AS-ND24D-A Neon Tube Light

Installation Steps

AS-ND24D-A (Vertical ceiling)
  1. Attention: The length of the PC Tube should be 30~40mm less than the Neon Tube
  2. Seal endcaps on both sides with glue
  3. Fix metal outer endcaps by screws in the wire sideSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(1\)
  4. Put the matching PC tube
  5. Fix tightly with metal endcaps on the other side by screws
  6. Fix the ceiling metal head by screws in ceilingSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(2\)
  7. Optional vertical or lateral installation of the ceiling head
  8. Put the finished product into a fixed ceiling head
  9. Spin the tube to completely match the inner clasp to avoid the product falling offSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(3\)
  10. Tighten the screws
  11. Spin metal endcaps on the button to be attached firmlySur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(4\)
AS-ND24D-B (Vertical hoisting)
  1. Attention: The length of the PC Tube should be 30~40mm less than the Neon Tube
  2. Installation is easier with 30~40mm 2P cable
  3. Fix the accessory into the tube with screwsSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(5\)
  4. Put the matching PC tube
  5. Fix tightly with metal endcaps on the other side by screws
  6. Peel the cable and put them through correct pole holesSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(6\)
  7. Peel the cable and put them through correct pole holes
  8. Press the elastic head to the lowest and spin the tube in
  9. Spin the button endcaps to firmly attach to the tubeSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(7\)
  10. Take apart the wire locker and put the cable through the head
  11. Fix the top of the wire locker to the ceiling by screws and tighten accessories after putting through throughout the cableSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(8\)
AS-ND24D-C (Double-head ceiling)
  1. Product picture
  2. Put accessories into the tube and fix it with screws
  3. Put accessories into the tube and fix it with screwsSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(9\)
  4. Drill in specific mounting placement
  5. Optional vertical or lateral installation of the ceiling head
  6. Fix the ceiling metal head by screws in ceilingSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(10\)
  7. Spin the tube to completely match the inner clasp to avoid the product falling off
  8. Tighten the screws
  9. Spin the tube to completely match the inner clasp to avoid the product falling offSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(11\)
  10. Tighten the screwsSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(12\)
AS-ND24D-D (Horizontal hoisting)
  1. Product picture
  2. Spin to the limit
  3. Take apart the head of the wire lockerSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(13\)
  4. Drill in specific mounting placement
  5. Fix the separate wire locker in the ceiling
  6. Spin upwards to the limitSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(14\)
  7. Pull the steel rope to adjust the height
  8. Press the elastic head and pull downwards to readjust the height
  9. Cut off the exposed steel ropeSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(15\)
  10. Picture of the finished product after installation
  11. Put the tube into the finished accessoriesSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(16\)
AS-ND24D-E (Round hoisting)
  1. Product picture
  2. Spin to the limit
  3. Put the small accessory into the tubeSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(17\)
  4. Put the accessory into the tube according to the direction as picture and tighten them
  5. Lock small pieces firmly into the main accessories
  6. Put the small pieces into the other sideSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(18\)
  7. Plug the cable into a wire hole and lock it
  8. Tighten a small piece of another side into the main accessory
  9. Take apart the wire locker and install it in the ceilingSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(19\)
  10. Put the cable through holes one by one
  11. Press the elastic head and pull downwards to adjust the height
  12. Press the elastic head and pull upwards to lock itSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(20\)
AS-ND24D-F (Telescopic rod ceiling)
  1. Accessories picture
  2. Put the PC accessory into the tube
  3. Fix accessory as picture in installation placementSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(21\)
  4. Spin the telescopic rod into the ceiling accessory
  5. Move the PC accessory under the telescopic rod and connecting
  6. Spin the middle part to lock after adjusting the height

Sur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(22\) Sur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(23\)

AS-ND24D-G (Steel Rope Ceiling)
  1. Accessory picture
  2. Put the PC accessory into the tube
  3. Fix accessory as picture in installation placementSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(25\)
  4. Move the PC accessory under the telescopic rod and connecting
  5. Spin the telescopic rod into the ceiling accessory
  6. Press the elastic head and pull downwards to readjust the heightSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(26\)
  7. Cut off the exposed steel ropeSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(27\)
AS-ND24D-H (Wall Mounting)
  1. Product picture
  2. Put accessories into the tube and fix it with screws
  3. Fix accessory as picture in installation placementSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(29\)
  4. Install mounting clips
  5. The minimum distance between mounting clips
  6. Optional vertical or lateral installation of the ceiling headSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(30\)
  7. Put the tube into the installed accessory
  8. Tighten accessory and
  9. Press the tube into mounting clips from top to bottomSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(31\)
  10. Put the tube into the installed accessory at the bottomSur-Mountor-AS-ND24D-A-Neon-Tube-Light-fig- \(32\)

Contact Information

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals