ENGA HDC-HSTZ4BS-21-0331-01 Five Function Thermostatic Shower Installation Guide
- June 15, 2024
- ENGA
Table of Contents
ENGA HDC-HSTZ4BS-21-0331-01 Five Function Thermostatic Shower
Installation Drawing
Pipes Diagram
The display size is the recommended mounting height.
Please be adjusted according to your need.
These size are only for reference, the specific parameters is based on real
item you get.
INSTALLATION STEPS OF VALUE BODY
29 | Accessory Bag | / | 1 |
---|---|---|---|
28 | SUS304 Screw M5X6 | SUS304 | 2 |
27 | Thermostatic Valve Body | Brass(A) | 1 |
26 | Filter(Check Valve) | / | 2 |
25 | Thermostatic cartridge | / | 1 |
24 | Sleeve ring (2) | HPb59-2 | 1 |
23 | Socket Screw M5x18 | SUS304 | 1 |
22 | Handle Wheel | HPb59-2 | 1 |
21 | Spring | SUS304 | 1 |
20 | 0-ring | NBR | 5 |
19 | Faceplate | HPb59-2 | 1 |
18 | Plastic Hot Stop Circle | POM | 1 |
17 | Temperature Handle Cover | ZnA14 | 1 |
16 | Silicone plug | Silicone | 1 |
15 | Handle wheel | HPb59-2 | 4 |
14 | Socket Screw M5x5 | SUS304 | 5 |
13 | Diverter Handle | ZnA14 | 4 |
12 | Wear pad | PE | 4 |
11 | Diverter cartridge | I | 4 |
10 | Sleeve ring (1) | HPb59-2 | 4 |
9 | Base(1) | HPb59-2 | 1 |
8 | Stainless Steel Screw M5X10 | SUS304 | 18 |
7 | Connector | RFH59-2 | 4 |
6 | 0-Ring | NBR | 4 |
5 | 0-Ring | NBR | 16 |
4 | Connection Tube (2) | HPb59-2 | 4 |
3 | Base (2) | HPb59-2 | 3 |
2 | Connection Tube (1) | HPb59-2 | 1 |
1 | Base plate | SUS304 | 1 |
No. | Name | Material | Qty. |
VALVE BODY FAILURE REPAIR
-
Release the top 4 handwheel levers (b) counter-clockwise by hand to take off the knobs. Next take out the hole plug (c) at the bottom of temperature handle, then use 2.5 mm hex tool to release the screw (d) to take off hand cover.Remove and keep the black plastic circle (a) ti ll the final finish of installation and temperature adjustment.
-
Turn off the water supply. Determine pipe length and depth. Set up the water lines properly based on the actual condition. The above diagram for plumber reference (Must pay attention- left is hot, right is cold ).
-
Drill 4 positioning holes for the valve body. The above diagram for your reference.
-
Hanmer the 4 expansion screws into the holes.
-
Fix the valve body with 4 positioning screws.
-
Use copper sleeve wrench to tighten the screws.
-
Connect the hot/cold inlets and outlets properly. Open the water supply to check and test, ensure there is no leakage or blockage at each connection.
-
Temperature setting check.
-
Rotate the valve core clockwise or counterclockwise by hand to align the 2 marks on the valve core teeth (enlarged view A)
-
Attach the black gear ring on the valve core as picture directions (enlarged view B).
-
Install the handle and plug as picture shows.
-
Screw the handwheel into the handles.
Please take accurate measurement according to the actual installation.Diagram only for your reference.
Installation Steps Of Body Jets
-
Attach the cover plate to body jets.
-
Apply Teflon tape to threaded tail of the body jets.
-
Use a wrench to screw the jet heads clockwise into the body spray outlets.
Installation Steps Of Hand Shower
-
Wrap supply elbow thread with Teflon tape and attach cover plate to it .
-
Screw the shower holder clockwise onto the hand-shower outlet.
-
Place rubber washers in both ends of the hose.
Connect the shower hose to the supply elbow and shower head. Note the ends of shower hose to be connected correctly.
INSTALLATION OF SHOWER HEAD
- Parts List
6 | elbow water hose | 1 |
---|---|---|
5 | Power plug | 1 |
4 | M6 explosive screw | 4 |
3 | M5 screw | 4 |
2 | Shower components | 1 |
1 | Bracket | 1 |
no. | name | qty |
Installation View
-
Please screw the M5X20 screws out using the allen wrench.
-
Separate the shower assembly from the bracket.
-
Cut Koles at a suitable position under the ceiling Refer to the basic size of the product.
-
Refer to the basic size of the product drill 4-Ø 10 holes at a suitable position under the ceiling.
-
Play the explosion screw heads into the 4 hole with a hammer.
-
Use a socket wrench to remove the lock nut spring washer, and flat washer counterclockwise.
-
Move the bracket upwards so that the four expansion screw heads pass through the four holes of the bracket respectively.
-
Install the washer and spring washer with explosive screw heads, and then use The copper sleeve wrench locks the nut to the bracket, and the bracket is flush with the ceiling.
-
Remove the gypsum board of the ceiling if have, and then connect the 1/2 water inlet hoses(male side) through the hole on the side wall of the bracket to the water inlet hole on the ceiling.
-
Put elbow water hoses through the bracket crossbar and then connect it with the Three-way joint. Put the wire converter head into the controller.
-
Insert the Power Plug sub head into the female end of the wire conversion head and plug the Power Plug into the plug board.
-
Use a allen wrench to lock the shower panel on the bracket. Then test the rain and waterfall functions working normally or not.
At last install the gypsum board.
Customer Support
Please do not hesitate to, contact us with your questions,, concerns and/or
problems , we’re here to help
Customer Support : enge_ryan@126.com
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>