KIVU Back To Wall Toilet Installation Guide
- June 12, 2024
- KIVU
Table of Contents
TOILET INSTALLATION GUIDE
BackToWALL TOILET
TOILET INSTALLATION GUIDE
-
Installation Drawing
MEASURES WITH PVC BENDMEASURES WITHOUT PVC BEND
. Pan Installation
. PTrap 180 mm57Trap 206 mm -
Pan Installation
-
Cistern Installation
FILL VALVE INSTALLATION INSTRUCTIONS
-
Installation Drawing. Hadjustable range 243-338mm
. Ladjustable range 132-202mm
.Water Temperature: 2°C to 45°C
.Water Pressure Range:0.02Mpa (0.2 Bar) to 0.8Mpa (8 Bar)
WORK PREPARATION: Make sure all debris has been removed prior to installing new tank fittings. -
Water Level AdjustmentMINOR WATER ADJUSTMENTSFLOAT ADJUSTMENT
-
Fill Valve Installation
-
Cleaning Filter Periodically
FLUSH VALVE INSTALLATION INSTRUCTIONS
- Flush Valve Installation
- Installation of Push Button
- Adjust of Flush Volumev
HALF FLUSH VOLUME FULL FLUSH VOLUME
SEAT INSTALLATION
Put the screw insert to the toilet hole. Locking the screw. Cover the
stainless steel lid.
Install the toilet seat.
Finished. Press the button and pull upward can remove the seat coverto clean.