- GENERAL
- SAFETY INSTRUCTIONS
- PACKING & TRANSPORT
- POSITIONING & MOUNTING
- ASSEMBLY & INSTALLATION
- AHU Components
- WIRING
- START-UP & OPERATION
- COMMISSIONING
- MAINTENANCE
- TROUBLESHOOTING
- WARRANTY
- COMMISSIONING CHECK LIST
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
MT Series (Clever) Chilled / Hot Water Air Handling Units
Product Information
The MT Series (Clever) Chilled / Hot Water Air Handling Units are designed for air conditioning, heating, cooling, and ventilation. These units must be installed in accordance with all national and regional regulations and bylaws. The appropriate local permits must be acquired and adhered to. The appliance is not intended for use by persons (including children) with reduced physical, sensory, or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concerning use of the appliance by a person responsible for their safety.
Product Usage Instructions
SAFETY INSTRUCTIONS
- All paragraphs preceded by the symbol ! require great attention as they underline dangerous situations or important information.
- The units are to be installed, operated and maintained only by qualified technical personnel.
- It is strictly forbidden to enter into the fan area while the fan is operating. When necessary, the operator should be equipped with proper safety equipment and clothes in compliance with local regulations. Once turned off, the fan will take time to come to a complete stop.
- The maintenance personnel should treat the heating coil surface as hot and be equipped with gloves and clothes to prevent accidents.
- Turn all isolators off before touching any electrical connections. The electric cables and cables sockets should be in compliance with local wiring regulations.
- Turn the power supply OFF, before entering into the filter plenum section. The filter section should be treated as highly flammable due to fine dust build-up present. As such it is forbidden to smoke or to light flames inside the filters area. Dirty filters can easily ignite.
PACKING & TRANSPORT
Follow the manufacturer’s instructions for packing and transporting the
unit.
POSTIONING & MOUNTING
Follow the manufacturer’s instructions for positioning and mounting the
unit.
ASSEMBLY & INSTALLATION
Follow the manufacturer’s instructions for assembly and installation of the
unit. National Health and Safety regulations must be followed to avoid
personal injuries.
WIRING
Follow the manufacturer’s instructions for wiring the unit. The electric
cables and cables sockets should be in compliance with local wiring
regulations.
START-UP & OPERATION
Follow the manufacturer’s instructions for starting up and operating the
unit.
COMMISSIONING
Follow the manufacturer’s instructions for commissioning the unit.
MAINTENANCE
Follow the manufacturer’s instructions for maintaining the unit. Pay
attention to the heating coil high temperature. The maintenance personnel
should treat the surface as hot and be equipped withgloves and clothes to
prevent accidents.
TROUBLESHOOTING
Follow the manufacturer’s instructions for troubleshooting any issues with
the unit.
WARRANTY
Refer to the manufacturer’s warranty information for any issues with the
unit.
It is important to follow all instructions and guidelines to ensure the optimum performance, reliability, and durability of the MT Series (Clever) Chilled / Hot Water Air Handling Units.
For commissioning, refer to the commissioning sheet provided by the manufacturer.
GENERAL
Follow these instructions to ensure the optimum performance, reliability and
durability.
Units must be installed in accordance with all national and regional
regulations and bylaws. National Health and Safety regulations must be
followed to avoid personal injuries.
The appropriate local permits must be acquired and adhered to.
This appliance is not intended for use by persons (including children) with
reduced physical, sensory, or mental capabilities, or lack of experience and
knowledge, unless they have been given supervision or instruction concerning
use of the appliance by a person responsible for their safety. Children should
be supervised to ensure that they do not play with the appliance.
SAFETY INSTRUCTIONS
All paragraphs preceded by this symbol ! require great attention as they underline dangerous situations or important information.
General
CLEVER Air handling units are to be installed, operated and maintained only by
qualified technical personnel. The units are suitably designed for air
conditioning, heating, cooling and ventilation.
Fan Coil Section DANGER. ROTATING MACHINERY.
It is strictly forbidden to enter into the fan area while the fan is
operating. When necessary, the operator should be equipped with proper safety
equipment and clothes in compliance with local regulations. Once turned off,
the fan will take time to come to a complete stop.
Heating Coil
Pay attention to the heating coil high temperature. The maintenance
personnel should treat the surface as hot and be equipped with gloves and
clothes to prevent accidents.
Electrical Connections
Turn all isolators off before touching any electrical connections. The
electric cables and cables sockets should be in compliance with local wiring
regulations.
Filter Plenum Section
Turn the power supply OFF, before entering into this area. The filter
section should be treated as highly flammable due to fine dust build-up
present. As such it is forbidden to smoke or to light flames inside the
filters area. Dirty filters can easily ignite.
Moving Parts
Pay attention when the dampers are operating.
Sharp Objects
Sharp objects have been minimised in access areas, however beware of
projecting parts and sharp sheet-metal edges in other places.
DO NOT place your hands on moving components such as blades or fan wheels.
PACKING & TRANSPORT
Packing
CLEVER air handling units are normally delivered completely assembled. On
request, for some specific cases such as difficult transport conditions,
difficult access in destination rooms, units can be supplied disassembled in
various sections or completely disassembled as a kitset.
Temperzone disclaims all responsibilities concerning any damages once the
goods have been received. Receivers are responsible to inspect the goods on
delivery for damages. Upon finding damage, IMMEDIATELY notify the freight
company and Temperzone. Failure to provide immediate notice will cause any
warranty / damage claims to be invalid.
CLEVER air handling units are generally supplied with shrink wrapped plastic
finish with heavy plastic covers on wooden pallets to provide weather / site
protection. This will not prevent damage during transport and inspection.
Unwrapping should also be undertaken to check for any damage.
Transportation
Always secure unit with straps (never use chains). For long or difficult
transportation, sections should be fixed carefully considering factors such
as: internal weight of the components, condition of the roads, etc, to ensure
the CLEVER air handling unit suffers no damage. Temperzone disclaims all
responsibilities concerning damages due to incorrect loading and unloading.
The various sections should be loaded and unloaded with attention to the
projecting parts: hinges, handles, drain trays and connections, pipe
connections, and so on. Never use these points to move the air handling unit.
Loading & Unloading
- CLEVER air handling units are supplied on a wooden pallet designed to allow easy lifting with a fork-lift truck.
- STROPS/SLINGS AND SPREADER BARS ARE THE RECOMMENDED METHOD OF LIFTING AIR HANDLING UNITS.
- To reduce the risk of damage we recommend that protection be added to the casing when lifting or unloading
- Gently manoeuvre unit in order to avoid high impacts that could cause damage, eg cracks to rivets, screws etc.
- Air handling units should be stored in dry rooms and protected from atmospheric conditions. Only with these precautions oxidation, etc can be avoided.
Panel Clear Protective Film
The external clear protection film on the external panels MUST BE REMOVED
WITHIN 30 DAYS OF DELIVERY. The material is applied to protect the panel
lining during panel manufacture and transportation. Failure to remove this
protective film may cause damage of the lining surface. Claims for damage
caused by prolonged time the film left on the panels are not the
responsibility of Temperzone.
Protection Roof
If the CLEVER air handling unit is provided with a protection roof fixed to
the casing, inspect on delivery. Check for cracks or screws loosening. Any
joints should be sealed with silicone.
If the CLEVER air handling unit has multiple sections, care needs to be taken
to ensure the roof joint is securely fixed and joined together to prevent
water entry under the roof sections. Ensure tight fitting and seal with
silicone at sides.
POSITIONING & MOUNTING
Adequate clearance must be allowed for future servicing and maintenance.
Mounting
The unit should be fastened to a firm flat horizontal plinth via the mounting
base channels. L-shape shipping brackets are supplied at each corner which can
be re-used for this purpose. Ensure vibration isolating mounts or pads are
included.
A water level is required to position the CLEVER air handling unit, using
wedges when necessary to ensure correct clearances for opening of inspection
doors. The CLEVER air handling unit can be installed directly on a floor able
to support its weight. We however recommend advisable to build a base plinth
made of concrete or sheet metal.
Flexible duct connections are recommended between the supply and return ducts
and the unit.
Condensate Drains
Condensation can form on the indoor cooling coils. This is normal during unit
operation. It is recommended the condensate be piped to a suitable drainage
point to prevent ponding and/or slippery mould growth around the base of the
unit.
For a drip free installation a separate drain tray beneath the unit could be
used to drain condensate to a suitable drainage point.
Condensate drains should be ‘U’ trapped outside the unit. The trap should have
a vertical height of at least 100 mm. The drain should have a slope of at
least 1 in 50 and must not be piped to a level above the unit drain pipe.
(refer diagram below)
ASSEMBLY & INSTALLATION
Section Assembly (if applicable)
During a multi-section CLEVER air handling unit installation, pay attention to
fixing clamp plates positioned on sections. A self-adhesive backed foam gasket
is supplied with the unit.
- Apply self-adhesive gasket (supplied) around the joining faces of one section (figure ‘a’)
- Align and push the two sections together for a perfect match. During this operation, keep the sections level with the help of a spirit level. Tighten clamps using a hex-key size 6 (CRV6).
Connection To Ducts
Flexible connections should avoid transmitting vibration through the air duct
from the CLEVER air handling unit and vice versa. The rubberized canvas / PVC
should be sufficiently released. Never connect ducts directly to the CLEVER
air handling unit. Place a gasket on flanges to avoid air leakage. Tighten
screws, even those difficult to reach. Use silicone to seal slots created by
the gasket.
AHU Components
Filters
Check that filters have been correctly installed, both panel filters and/or
bag filters. Filters must be installed
in the CLEVER air handling unit from the initial start-up. Make sure that
gaskets/seals are intact have been placed correctly to avoid air bypass.
Coils
Pipes of coils supplied by water should be installed perfectly horizontal. The
fluid should run through the coil in counter-flow direction in drain headers
to obtain the maximum heat output couplings. Air vents are supplied on the
upper part of the unit’s coil/s. When establishing the dimensions of the
flow/return pipework do not refer to the coil connections diameter. This
dimension has been standardized and will not reflect the internal workings of
the coil. Do not load coil connections with connection pipes weight. Provide
pipe support where appropriate.
Anti-freeze
To avoid coil cracks caused by freezing, when the temperature drops below 3
°C, add anti-freeze to water or completely pre-drain the coil. This precaution
is required for all units not operating continuously.
Water Connections
The external hydraulic system should not transfer vibrations to the CLEVER
unit’s coils. Preventive measures should be taken to isolate the transfer of
vibrations, otherwise damage caused by work hardening will lead to early
failure. Be careful when connecting the coil connections, as if they are
twisted, you may damage copper pipes and drain tanks pan discharge couplings.
During pre-test operations, carefully check the coil for possible cracks.
WIRING
- Electrical work must be done by a qualified electrician and meet standard AS/NZS 3000.
- DANGER! LIVE ELECTRICAL CONNECTIONS. ISOLATE MAINS POWER BEFORE WORKING ON UNIT.
- CAUTION! Parts within the electrical enclosure are still LIVE when local isolator is OFF.
The unit must be wired directly from a distribution board using an
appropriately sized circuit breaker. The termination point for the mains cable
is in the electrical compartment. An isolating switch is required, near but
not on the unit.
External wiring conduit should be routed along the units aluminium framework.
DO NOT install wiring in contact with piping. Refer Specification Sheet for
correct power wiring and control connection points.
- Ensure all electrical connections are fastened and continuous.
- Check motor starter and overloads for correct rating and trip setting.
- All circuit breakers or protective devices associated with the motor must be rated to suit motor running current and starting characteristics.
- Field connection cables must be appropriately selected considering the voltage drop.
- When using long supply cables, check with motor supplier recommendations to avoid high voltage transients occurring at motor terminals.
- Check the connection diagram on the motor terminal box and make sure the supply leads are properly connected considering the supply phase sequence.
- Ensure that the supply cable terminations on to the motor terminal board are firm, without loss of strands while using crimped lugs. Ensure enough clearances are provided between supply cable lugs and to earth.
- Ensure that proper earthing connections are made.
- If using conduit for the supply cable, ensure the conduit are completely threaded in and seal the threads appropriately.
START-UP & OPERATION
Start-Up
- Check tightness of electrical connections.
- Check the air filters have been correctly installed.
- Check that all indoor fan motors can freely rotate.
- Apply mains power to the unit by closing the mains isolating switch.
- Check the supply voltage between each phase and neutral.
- For units with water coils, check air has been bleed from the water loop prior to unit operation.
- Check air diffusers are open
Motor
- Before running the motor make sure that the terminal box lid is closed and secured with appropriate clearance to live parts.
- Make sure that appropriate earthing are done.
- Make sure that the moving parts are adequately guarded for safety.
- Check the mounting bolts and/or flanges are firmly secured.
- Make sure of no loose objects around that may be sucked by the cooling fan on the motor or the fan.
- Make sure that the load applied is within the nameplate specification.
- Check that the running current on no-load and full-load are reasonably balanced within 10% of the average and record the figures on the Commisssioning Sheet p.6 for future reference.
- While the fan is running, check for the correct direction of rotation of the impeller. It should be the same as shown by the arrow.
COMMISSIONING
A Commissioning Sheet is included on page 6 to assist in recording appropriate
checks.
A unit equipped with variable speed (EC) indoor plug fan allows adjustment of
the fan speeds to obtain the desired indoor supply airflows.
! Setting the indoor fan speed too high can bring a risk of water carry-over,
ie condensation can be sucked off the fins off the indoor coil and into the
supply air duct. Water could then start leaking from the supply air vents and
diffusers, damaging items below, and corrosion of ducting may occur.
MAINTENANCE
Maintenance operations should only be undertaken BY AUTHORIZED TECHNICAL
PERSONNEL. All maintenance shall to strictly comply with local and national
safety regulations. Before any service is begun, the person responsible for it
should switch off the power supply and switch off the unit. A safety sign with
maintenance operation should be displayed as a warning.
Before you start:
! DANGER. TURN OFF POWER TO AVOID ELECTRICAL SHOCK AND ROTATING MACHINERY
Air Mixing Dampers
CLEVER opposed blade dampers are manufactured from extruded aluminium
profiles with nylon gears wheels. This type of damper does not normally
require lubrication, but only normal cleaning. If the damper environment is
dusty or dirty, cleaning of the damper gears are necessary and regular
lubrication will help prevent binding. Silicon based lubricants are
recommended.
Ensure the dampers are always installed square without any additional twisting
pressure from connecting ductwork, etc. Excessive external pressure can cause
damper binding and premature failure of the nylon gear wheels.
Holding Frames & Clips
CLEVER air handling unit can be fitted with stainless steel holding frames.
The holding frames are provided with a gasket in order to ensure a perfect
airtightness and avoid air bypass. The four retaining clips should be fitted
and clipped in the correct position. Incorrectly fitted clips or missing of
one of them could cause air bypass. For a correct tight seal the gasket should
not be damaged, so it should be checked every time you replace a filter. If
the seal is damaged replace or repair it.
Coils Supplied By Water
Coils are fitted with manual air bleeds. Additional bleeding should not be
required unless any work has been done on the external chilled water system.
Bleed prior to operation of the CLEVER air handling unit.
Six Monthly Checks
- Check the tightness of all electrical connections.
- Check for signs of corrosion on electrical connections in high salt atmospheres; replace where necessary.
- Check the tightness of all fans motor mountings.
- Check and/or replace indoor air filters; more frequently if required.
- Check condensate drain for free drainage and clean as necessary.
Annual Checks
- Check all piping for chafing and vibration.
- Check the operation of electric heaters, if fitted
- Check air supply at all diffusers
- Check for excessive noise and vibration and correct as necessary.
- Check for insulation and duct damage and repair as necessary.
- Touch up any paintwork damage to prevent corrosion
TROUBLESHOOTING
EFFECT | CAUSE |
---|---|
Insufficient air flow rate | Dampers have not been correctly adjusted; |
system air balancing not done
Impeller rotation opposite to direction shown by the arrow
Fan speed not set-up correctly
Accidental coil / filter clogging
Excessive air flow rate| Dampers have not been adjusted
Filters are not installed
Inspection doors are opened or some panels are missing
High fan motor current draw| Impeller rotation opposite to direction
shown by the arrow
Coil insufficient coil output| Temperature or water supply rate lower
than design
Water flow rate decrease, control devices have not been adjusted/ balanced;
lime deposits due to inadequate water treatment
Back-to-front water connections
External control systems are not setup correctly
Noise| Damper blades vibration
Hissing due to pipes, baffles and inlet vibrations from leakage
Excessive air flow rate
Air flow rate decrease| Increasing flow resistance in the fan system
caused by:
Filters clogged by dust, debris, etc
Coil fins deposits
Dampers have not been adjusted
Air flow rate increase| Dampers have not been adjusted
Filters have not been installed
Inspections doors are opened or some panels are missing
Inlets have not been properly regulated
Filters and coils have just been cleaned
Heating output decrease| Water temperature lower than design in Heating
mode
Water flow rate decrease, control devices have not been adjusted/ balanced,
lime deposits in coil due to inadequate water treatment
Airflow rate decrease
Air temperature lower than design in Heating mode (
Cooling output decrease| Water temperature higher than design in Cooling
mode.
Water flow rate decrease, control devices have not been adjusted, lime
deposits in coil
Air temperature higher than design in Cooling mode
Water leaking| Check the drain trap/vent/slope.
Check the coils and connections.
Water carry-over: reduce the maximum fan speed (refer also Air Flow above)
WARRANTY
Please refer to the separate warranty document supplied with the unit, or
visit www.temperzone.com for details.
Australia:
- warranty@temperzone.com.au
- spares@temperzone.com.au
- Telephone: 1800 21 1800
New Zealand:
- customerservices@temperzone.co.nz
- Telephone: 0800 TZWARRANTY (899 2777)
Disclaimer
Temperzone disclaims all responsibility in the following cases:
- The installation and maintenance of the CLEVER air handling unit that are not carried out by the qualified and authorized personnel.
- Use not in compliance with the specific national regulations.
- Use of non-original spare parts.
- Power supply faults.
- Removal of safety protections.
- Total or partial non-compliance with instructions.
- Modifications to the CLEVER air handling unit.
- Negligence.
COMMISSIONING CHECK LIST
Unit mounted level? | Y / N |
---|---|
Temperzone recommended drain trap fitted? | Y / N |
Water drains tested okay? (all doors closed, fan running) | Y / N |
Does unit have adequate safe access? | Y / N |
All electrical terminals are tight? | Y / N |
Air filters fitted and seals intact? | Y / N |
Is air flow set and balanced? | Y / N |
Fan/Plenum Section joiner clamps are all tight? | Y / N |
Supply voltage checked? | Y / N |
External electrical isolator fitted? | Y / N |
Fan’s set voltage | __ V |
Fan motor full load running current | __ A/ph. per fan |
Fan/s rotation direction checked? | Y / N |
Checked for excessive noise & vibration of unit? | Y / N |
Electrical Certificate Of Compliance issued? | Y / N |
Fresh air and Return air dampers set (if applicable) | Y / N |
Air bled from water coil (if applicable) ? | Y / N |
Auckland
- Head Office38 Tidal Rd, Mangere, Auckland Private Bag 93303, Otahuhu New Zealand
- Phone: (09) 279 5250
- Email: sales@temperzone.co.nz
Hamilton
- Phone: (07) 839 2705
- Email: tzhamilton@temperzone.com
Wellington
- Phone: (04) 569 3262
- Email: wgtn@temperzone.com
Christchurch
- Phone: (03) 379 3216
- Email: chch@temperzone.com
Sydney
- Head Office14 Carnegie Place, Blacktown NSW 2148
- PO Box 8064, Seven Hills West NSW 2147, Australia
- Phone: (02) 8822 5700
- Email: sales@temperzone.com.au
Adelaide
- Phone: (08) 8115 – 2111
- Email: sasales@temperzone.com.au
Melbourne
- Phone: (03) 8769 7600
- Email: vicsales@temperzone.com.au
Brisbane
- Phone: (07) 3308 8333
- Email: qldsales@temperzone.com.au
Perth
- Phone: (08) 6399 5900
- Email: reception@airskill.com.au
Newcastle
- Phone: (02) 4692 1155
- Email: sales@mcintoshair.com.au
Launceston
- Phone: (03) 6331 4209
- Email: info@hvac-supplies.net
Singapore
- Phone: +65 6733 4292
- Email: sales@temperzone.com.sg
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>