Safety Instructions

  • Make sure to use the correct tools and wear proper protective gear.
  • Follow any and all instructions and user manuals provided by your fixture, power tool, and paint manufacturer.

Special Instructions & Notes

  • Thoroughly read through the installation instructions to familiarize yourself with the process prior to beginning installation.
  • If studs or joist do not align with the wood blocking, it is recommended to use molly bolts or toggle bolts to secure the wood blocking to the ceiling.
  • Allow the beams to acclimate to room temperature for at least 24 hours prior to installation.
  • When lining up two beams end-to-end to create a longer beam, butt the open ends together for the best match and cut any excess length from the closed ends. Use the rubber beam strap provided to cover the butt joint.

Tools & Material List

  • 2×4 Wood Blocking (For Mounting]
  • Measuring Tape
  • Power Drill
  • Hammer
  • Saw
  • Stud Finder
  • Chalk Line / Laser Level
  • Nails
  • Screws (Small Head)
  • Construction Adhesive
  • Caulk Gun
  • Caulking
  • Painters Tape

Step-by-Step Instructions

  1. Measure the inside width of the beam and cut the wood blocking to the inside width dimension.
    Pre-drill at least two holes per block to make them easier to attach.
    ARCHITECTURAL DEALERS Faux Wood Beams - Figure 1

  2. Determine where the beam will be installed. If installing multiple beams, determine your spacing.
    Once you have determined the installation points and spacing, mark the center point along both sides of the wall. Connect the marks using a chalk line or laser level.
    ARCHITECTURAL DEALERS Faux Wood Beams - Figure 3

  3. Attach the wood blocking two feet from the wall using your center line. Install additional blocking every three to four feet.
    Use a pencil line or painters tape to mark where the wood blocking is installed. This will help to identify where the wood blocks are located when fastening the beam.
    NOTE: If the studs or joints do not align with the wood blocking, it is recommended that you use molly bolts to secure the wood blocking.
    ARCHITECTURAL DEALERS Faux Wood Beams - Figure 2

  4. Measure each installation point prior to cutting to account for variances in the wall.
    It is recommended that the beams be cut a little long so they fit snuggly and can be adjusted after dry fitting.
    NOTE: Our beams come with an open and closed end. We recommend facing the closed end towards the wall.
    ARCHITECTURAL DEALERS Faux Wood Beams - Figure 4

  5. Dry fit each beam without adhesive and make adjustments to the beam length if needed.
    NOTE: Light sanding will help with a snug fit.
    ARCHITECTURAL DEALERS Faux Wood Beams - Figure 5

  6. After dry fitting and length adjustments, apply construction adhesive to the outside of the wood blocking and the tops of the beam.
    Press firmly in place.
    ARCHITECTURAL DEALERS Faux Wood Beams - Figure 6

  7. Use finishing nails or screws (small head) to fasten the beams to the wall blocking.
    Screws will need to be countersunk. Nails and screws can be covered with colored wood filler or colored caulk.
    ARCHITECTURAL DEALERS Faux Wood Beams - Figure 7

  8. Clean any excess adhesive and apply caulk where the beam and wall meet if needed.
    ARCHITECTURAL DEALERS Faux Wood Beams - Figure 8

ARCHITECTURAL DEALERS Faux Wood Beams - Figure 9Draw a light pencil line perpendicular to the center of the beam strap.ARCHITECTURAL DEALERS Faux Wood Beams - Figure
10Lay the strap along the beam. Make sure that the straps three bolt heads are even on the top of the beam.
Use a pencil to mark your trim line and cut the strap along the trim line with scissors to fit to the beam.ARCHITECTURAL DEALERS Faux Wood Beams - Figure
11Apply a bead of adhesive to the back of the strap.ARCHITECTURAL DEALERS Faux Wood Beams - Figure
12Align the center of the strap with the marks made in Step 1.
Press firmly on the strap working from the center up each side to ensure good contact between the adhesive and the beam.
NOTE: Use finishing nails to secure the strap to the beam to allow the adhesive to set. Unfinished Beam Program
Create your own color
Simply make your selection from the many gel stain finishes that best suits your room.

Additional Accessories

  • Single and Double Straps
  • Brackets
  • Touch-Up Stain

ARCHITECTURAL DEALERS Faux Wood Beams - Figure 14For our full selection of Faux Wood Beams and Accessories visit us online at www.outwater.comARCHITECTURAL
DEALERS Faux Wood Beams - Figure 15Clean the wall and locate the studs in the wall.ARCHITECTURAL
DEALERS Faux Wood Beams - Figure 16Use screws to fasten a joist hanger to the wallARCHITECTURAL
DEALERS Faux Wood Beams - Figure 17Lightly push the lumber into the joist hanger. This structure will support your beam. Secure the lumber with screws.ARCHITECTURAL DEALERS
Faux Wood Beams - Figure 18The beam has to fit perfectly, if not, you will need to fill the extra space with wood. Measure the negative space. This will show you how thick it has to be.ARCHITECTURAL
DEALERS Faux Wood Beams - Figure 19Screw wood blocks on the support structure.ARCHITECTURAL
DEALERS Faux Wood Beams - Figure 20Slide your beam onto the support structure. The beam should fit perfectly.ARCHITECTURAL DEALERS Faux Wood Beams - Figure
21Screw the beam to the support structure. For the best result, use screws with small heads (trim head screws).

Architectural Products by Outwater, L.L.C. assumes no liability for improper installation.

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals