WAPRO DN110-200, DN200-315 Waback and Waback Access Instruction Manual
- June 8, 2024
- WAPRO
Table of Contents
WABACK AND WABACK ACCESS
INSTALLATION INSTRUCTIONS
& PRODUCT GUARANTEE
DN110-200, DN200-315 Waback and Waback Access
DN110-200 (NPS 4”-8”)
DN200-315 (NPS 8”-12”)
WaBack DN110-200 is CE approved according to the European standard for flood
protection for buildings SS-EN13564-1:2002 Type 1 & Type 3*
Please note your product serial number: …………………………
THANK YOU FOR PURCHASING A WAPRO PRODUCT.
FOR FURTHER PRODUCT INFORMATION PLEASE REFER TO WAPRO.COM.
SERIAL NUMBER
PREPARATION
INTRODUKTION
HANDLING
The product is delivered securely fastened on a pallet and must not be tipped
off the pallet. When unloading the product, use the lifting handles mounted on
the chamber (Large) or alternatively, place slings around the chamber. The
chamber must be placed on a flat surface during storage.
INSTALLATION
The chamber must be installed at the same angle as the fall of the pipe placed
in the sloping part of the pipe since the product does not have built-in fall.
Make sure that the flow direction of the chamber follows the flow direction of
the pipe.
WaBack and WaBack Access should be installed as recommended according to the
appropriate regulations in each country. The bottom of the product should be
placed at a frost-free depth or a frost guard or similar should be used so
that water does not freeze in the well.
EXTENDING THE HEIGHT OF THE CHAMBER
The height of the chamber is extended with the help of a Wavin riser DN425 or
Wavin riser DN1000. Connect a Wavin reducing cone to the DN1000 riser if a
DN640 cover is required.
MANHOLE COVERS
There are different manhole covers available.
Load-bearing (cast iron manhole cover) or non-load-bearing manhole cover
(plastic) in sizes DN425 or DN640.
GROUNDWATER PRESSURE
If there is a risk of groundwater pressure, the product must be firmly
anchored to prevent floating. This applies to WaBack Access Large. Use the
handles on the product as anchoring points.
The maximum laying depth is 2.5 m from pipe invert to ground level.
RECYCLING
WaBack and WaBack Access Small/Large are made primarily of environmentally-
friendly materials. Before disposing of the product, separate the components
for recycling. See the table for how the parts are recycled.
Stainless Steel** | PE* | EDPM* | Polyurethane* |
---|---|---|---|
Fasteners | Chamber | Elbow | Floatation arm |
- Incinerate
** Metal recycling
OPTIONAL ACCESSORIES
ALARM
Wired and wireless water level alarms are available for purchase separately.
The alarm ensures extra protection in the event of raised water levels. The
alarm senses when the water level is over the expected level and emits both a
light and sound signal. The alarm sensor should be mounted in the chamber and
the receiver unit should be installed in a building, service facility or
similar. The connection for the wireless alarm between the sender and receiver
must be tested before the alarm is put into service to ensure the signal is
not disturbed by any nearby building structure.
RISER
Wavin Tegra: WaBack Access Small DN425. WaBack DN600. WaBack Access Large
DN1000
SHUT-OFF PLATE – ACCESS ONLY
The shut-off plate enables the product to function as a shut-off valve. This
function enables the pipe to be closed off for service and maintenance.
REDUCER
Tegra DN1000 Cone
MANHOLE COVER
Manhole cover: WaBack Access Small DN425, WaBack DN640, WaBack Access Large
DN1000
WABACK AND WABACK ACCESS SMALL INSTALLATION INSTRUCTIONS
SEE THE SUPPLIER´S INSTALLATION INSTRUCTION ABOUT RISER AND CURRENT STANDARDS AND SITE REQUIREMENTS FOR GROUNDWORKS AND BACKFILLING.
CLOSING HEAD:
DN110 X= MIN 100MM
DN160 X=MIN 145MM
DN200 X=MIN 150MM
DN315 X= MIN 340MM
*WABACK EMERGENCY CLOSING FOR TYPE 3 APPROVAL
* Attach the console 400mm +/-30mm from the top of the riser using the
washers, bolts and nuts included. One washer on each side of the riser.
Attach the eyelet bolt 150+/-5mm from the bottom of the riser using the washer
and nut included.
WaBack Standard only
WABACK EMERGENCY CLOSING
Attach the console 400mm +/30mm from the top of the riser using the washers, bolts and nuts included. One washer on each side of the riser.
WABACK MAINTENANCE
2 X / YEAR OR AS REQUIRED
WABACK ACCESS SMALL MAINTENANCE
2 X / YEAR OR AS REQUIRED
WABACK ACCESS LARGE INSTALLATION INSTRUCTIONS
WABACK ACCESS LARGE MAINTENANCE
2 X / YEAR OR AS REQUIRED
WABACK ACCESS LARGE MAINTENANCE
WABACK®NON-RETURN VALVE
Test in-situ (Applicable for DN 100-200mm (NPS 4”-8”) Test conditions
- The test medium shall be water.
- The back-flow pressure shall be 1 kPa.
- The reference level for back-flow pressure during the test should be the top of the pipe.
Test procedure
- The back-flow pressure shall be maintained for 10 minutes.
- The test shall be deemed to have been passed if the leakage does not exceed 500 cm³ after having achieved the back-flow pressure.
GUARANTEE
Wapro AB shall remedy defects in the Product resulting from material and/or
workmanship for a period of two (2) years from the original date of purchase
and as long as the Product has been used in accordance with the
recommendations on the product label and under normal operating conditions.
The guarantee does not cover damage to the product caused by external
mechanical forces, such as interference from humans, animals or machines.
Furthermore, the guarantee is not valid if the product is damaged due to
exposure to chemical substances normally forbidden in waste water. The buyer
should contact the Wapro dealer where the product was purchased for any claim
handling and information regarding to returns/repairs, within a reasonable
time after discovering defects. The valve serial number can be found on every
valve and must be quoted in the case of a warranty claim. Wapro ABs’ liability
is limited to the replacement or repair of the defective product. Wapro will
not assume costs incurred for removal of defective valves or subsequent
installation of replacement valves. Furthermore, Wapro will not assume
transportation costs of damaged valves or replacement valves. To the fullest
extent the law permits this guarantee supersedes and voids all other
guarantees, whether expressed or implied and in no event shall Wapro AB be
liable for any consequential damages.
No employee, agent or other representative of Wapro AB is authorised to extend
the guarantee specified herein.
HOLDING BACK THE FLOOD
Wapro solutions protect against stormwater and backflow flooding
Protecting people and property
Wapro AB
Munkahusvägen 103
SE-374 31 Karlshamn, Sweden
Tel: +46 454 185 10
Email: wapro@wapro.com
wapro.com
Rev: 2021_1
References