snapav MM815 Lifting Arm Instruction Manual

June 13, 2024
snapav

snapav logo Attaching the MM815 Lifting Arm
into the RB100 Recess Box Kit

MM815 Lifting Arm

STEP 1
Insert MM815 Lifting arm into the RB100 Recessed box making sure to align the screw holes on the lifting arm to the screw holes on the RB100 as indicated.
NOTE: This process will require the use of four {14} M8x16 screws from your mount parts package. snapav MM815 Lifting Arm -
parts1STEP 2
Once all 4 holes are aligned, insert M8x16 screws into holes 1 and 2 and tighten them using allen wrench. STEP 3
Connect MM815 lifting arm to power supply and use remote to lower lifting arm to expose holes 3 and 4.
Gently push lifting arm up and back to secure wall bracket to back of RB100.
Insert M8x16 screws into holes 3 and 4 and tighten using allen wrench.
Tighten all four screws then continue with the next step of the installation.

snapav logoMM815 with RB100 Addendum 03-23
Please read the entire MM815 installation guide and the RB100 manual before you begin.
If you have any questions, visit MantelMount.com or call (800)-897-9755.

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals