victorian plumbing E-Diamond Electric Only Heated Towel Rail Instruction Manual
- June 9, 2024
- victorian plumbing
Table of Contents
victorian plumbing E-Diamond Electric Only Heated Towel Rail Instruction
Manual
**1. Installation set includes***
*Before starting installation check the list of installation set. Replace missing items before installation. Do not use sharp material to open packages.
2. According to the pipe lines of your application determine the
installation position and level the towel dryer.
2.1. Determine the ends for installing “Ventilating Cap” and “Blocking Caps”.
“Ventilating Cap” should be slightly higher than “Blocking Caps” to ventilate
any air left in the pipes after the installation.
2.2. Install your “Ventilating Cap” and “Blocking Caps”. Tighten the caps.
3. Mark your “Hanger” on the wall with a marker.
3.1. Place two hangers upper side of towel dryer. Make sure towel dryer is
centered.
3.2. Place one hanger down side of towel dryer. Make sure it is centered.
4. Drill holes for the dowels on your marks.
5. Install “Dowels” with a small hammering.
6. Install “Hanger Body (a)” with placing “Dowel Screws” inside
7. Install “Hanger Body (b)” and “Hanger Head” using “Hanger Holding Screw”
lightly to the according gaps of towel dryer. Do not tighten yet.
8. Place the towel dryer with holders to the three “Hanger Body (a)” pieces
on the wall.
9. Check for level adjustment. Screw “Hanger Level Screws to combine “Hanger
Body (a)” and “Hanger Body (b)”. Tighten the “Hanger Holding Screws. Place
“Hanger Caps to hide the screws.
10. Install valves of heating pipelines. Use sealing tapes or liquids.
11. Pressurize the towel dryer. Check for any leaks at valves and caps.
Tighten and seal any leaks found. If any leaks found on body of towel dryer
contact your dealer.
12. Use it with joy.
Read More About This Manual & Download PDF:
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>