Verizon NCM1100 Extended Antenna Mount User Guide
- September 13, 2024
- Verizon
Table of Contents
Quick Setup Guide
Extended Antenna Mount
NCM1100 Extended Antenna Mount
A. Extended Antenna Mount x1
B. Cable x 4
C. Mounting Bracket x 1
D. Screw for Hook x 2
E. Hook x 2
F. Screw for Mounting x 4
G. Anchor for Mounting x 4
Wall Mount Assembly
-
Connect the four paddle antennas to the Extended Antenna Mount (Part A) ports. Ensure the antennas are securely screwed in for optimal performance as illustrated below.
-
Attach the cable assembly to the 4 SMA connector on side of the Extended Antenna Mount (Part A).
Ensure the labels on the cable match the labels on the connector. -
Drill 4 holes on wall and place the 4 anchors 2.75 inches (length) and 1.8 inches (width) apart as illustrated below (Part G). You can also use the bracket (part C) as a guide for drilling holes.
-
Align the holes on Mounting Bracket (Part C) and ensure it is firmly secured on the wall through the screws (Part F).
-
Combine the Extended Antenna Mount (Part A) to the bracket (Part C) on the wall, and slide it towards the bracket latch until you hear a clicking sound.
-
Complete assembly.
-
Attach the other end of the cables to 4 SMA connectors on the back of the Business Internet Gateway. Ensure the labels on the cable match the labels on the connector. • Position the antennas as illustrated below. Ensure the Mount is firmly secured on the wall with screw.
Ceiling Mount Assembly
-
Connect the four paddle antennas to the Extended Antenna Mount (Part A) ports. Ensure the antennas are securely screwed in for optimal performance as illustrated below.
-
Attach the cable assembly to the 4 SMA connector on side of the Extended Antenna Mount (Part A). Ensure the labels on the cable match the labels on the connector.
-
Drill 4 holes on Ceiling and place the 4 anchors 2.75 inches (length) and 1.8 inches (width) apart as illustrated below (Part G). You can also use the bracket (part C) as a guide for drilling holes.
-
Align the holes on back of the Mounting Bracket (Part C) to ensure it is firmly secured on the ceiling through screws (Part F).
-
Combine the Extended
Antenna Mount (Part A) to the bracket (Part C) on the ceiling, and slide it towards the bracket latch until you hear a clicking sound. -
Complete assembly.
-
Attach the other end of the cables to 4 SMA connectors on the back of the Business Internet Gateway.
• Position the antennas as illustrated below. Ensure the Mount is firmly secured on the ceiling through screw.
Warning: Incorrect antenna positioning can affect antenna performance.
Rail Mount Assembly
- Connect the four paddle antennas to the Extended Antenna Mount (Part A) ports. Ensure the antennas are securely screwed in for optimal performance as illustrated below.
- Attach the cable assembly to the 4 SMA connectors on the side of the Extended Antenna Mount (Part A). Ensure the labels on the cable match the labels on the connector.
- Secure the hook (Part E) onto the back of Mounting Bracket (Part C) with screw (Part D), ensuring that the screws are tightened.
- Place the Mounting Bracket (Part C) on one side of the rail as illustrated below.
- Secure the other hook (Part E) onto the Mounting Bracket (Part C) using screws (Part D) to ensure a tight fit. Slide the other hook in place to ensure a tight fight on the rail. Secure in place by tightening the provided screw as illustrated below.
- Combine the Extended Antenna Mount (Part A) to the bracket (Part C) on the rail, and slide it towards the bracket latch until you hear a clicking sound.
- Attach the other end of the cables to 4 SMA connectors on the back of the Business Internet Gateway.
• Position the antennas as illustrated below. Ensure the Mount is firmly secured on the rail through screw.
Warning: Incorrect antenna positioning can affect antenna performance.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>